Chapter 575: Tiancheng Standard, Tiancheng Speed (for the 'Qi Emperor World' Ten Thousand Rewards)
Xincheng Xingyue Bay.
Ge Xiaotian sent away the leaders of Xue Da, and then ushered in supervisors from Dongshan Jifu, Nanhe Zheng Mansion, Jingcheng and other places.
The other party is not from Tiancheng's side, but is entrusted by Xue Da's leadership to supervise various projects in Xingyue Bay in the new city.
Of course, the other party is very familiar with Tiancheng.
He is not only a former subordinate of Chief Engineer Liang, but also an old colleague of Professor Hu.
The scale of the Xincheng Xingyue Bay project can be called the largest in China before the start of construction of Wangjing Xingyue Bay.
Such a large amount of work also made the work of the supervisor very heavy, just to get acquainted with the construction site, it took two days.
Immediately afterwards, staff training and drawing review took another day.
Fortunately, Tiancheng's construction standards are extremely strict, and they were widely circulated in the industry as early as last year.
Include:
Unified standards for acceptance of construction quality of construction projects,
Code for acceptance of construction quality of building foundation engineering,
Code for Acceptance of Construction Quality of Concrete Structure Engineering,
Masonry Engineering Construction Quality Acceptance Specification,
Code for Acceptance of Construction Quality of Steel Structure Engineering,
Code for Acceptance of Construction Quality of Timber Structure Engineering,
Underground waterproofing engineering construction quality acceptance specification,
Roofing Engineering Construction Quality Acceptance Specification,
Code for acceptance of construction quality of building ground engineering,
as well as drainage, decoration, ventilation, air conditioning, electrical, elevator, management, design, material inspection methods, etc.
To sum it up, it's a four-finger-thick piece of paper......
As a supervisor, you must be familiar with the skills of eating, and now you come to Tiancheng, which is supervision and learning.
So much so that when the supervisory institutes in other regions heard about this, they also came to ......
Good guys, it's all familiar now.
After that, in the eyes of the public, 80 construction departments carried out actions in an orderly manner according to the original plan, and began to continue the work during the holiday years ago: the main construction of the negative floor.
Build the formwork support, bind the wall column reinforcement, carry out beam and plate formwork, bind the beam and plate reinforcement, pre-embed the installation pipeline, and finally carry out concrete pouring......
The whole process takes 20 days normally, and Tiancheng relies on self-developed cement and special equipment to only take 10 days.
Subsequently.
Nearly 150 buildings have begun to carry out the construction of the main structure of the first and second floors.
The steps are similar to the construction of the negative floor, but Tiancheng uses a climbing frame for the first time. (I have been using a dust filter for the previous article)
The climbing frame, also known as the lifting frame, is made up of guide rails, vertical keels, rigid walkway plates, trusses, rigid triangular brackets, and horizontal connecting plates through bolts.
There are also fall arrest systems, climbing systems based on hydraulics or electric hoists, and construction protection systems.
It is a new type of construction platform that reduces scaffolding or replaces scaffolding, which can effectively reduce steel consumption and greatly protect the safety of construction personnel.
In 01, neither China nor overseas has yet to promote this kind of equipment.
Tiancheng relied on steel structure and mechanism technology to develop a new type of scaffolding system, which also obtained a patent.
The low first and second floors of construction do not need to be lifted by hydraulic devices, and the supervisors do not understand what this thing does.
But when twenty days later......
February 17th.
More than 150 climbing frames, under the incredulous gaze of the supervisors, slowly rise, open the 3~26 floors, or 3~32 floors of the main structure construction.
At this point, Tiancheng Engineering Department began to exert its might!
Relying on the complete supply of logistics materials, one day of construction, two days of maintenance, three days of one floor, the naked eye can be seen to climb up......
During the maintenance period, large groups of troops have moved to the northern foothills to lay a runway around the mountain.
Another part of the personnel beautified the banks of the Panlong River.
Next.
If you take a camera to record the construction site of Xingyue Bay in Xincheng and play it quickly, Tiancheng employees are like popeye who eats spinach......
Whew, drill into the building, clang, complete the pouring construction.
Hey, during the maintenance period, go straight to the northern mountains and open the mountain to quarry.
Whew, after the maintenance is completed, the climbing frame is lifted and the pouring continues.
Whoa, transport gravel, pave the outer roads of the construction site.
Hey, the Panlong River is getting more and more beautiful......
Lao Shen was already stunned.
In the past month and a half, he has hardly left the construction site, just sitting in the hall, sipping tea, watching hundreds of high-rise buildings rise from the ground......
And go back and look at your own home.
Tiancheng had a holiday a year ago, but Dongshan Jianlian did not take a holiday, worked overtime, and built the floor to the eleventh floor in three months, and there was still half of the cap.
Originally, I thought that I could get rid of Tiancheng, but now I look at it......
It's about to be surpassed!
Thinking of this, Lao Shen couldn't sit still, and contacted Wei Changfeng anxiously.
Well, the two are real allies.
Satellite phone connection:
"Lao Wei, you have to help me, the first batch of 100,000 people in the old city of Zao City will be relocated, and Tiancheng Xingyue Bay will be able to swallow half of it! Why don't we think of a way to speed up the Ginza community, once the Tiancheng real estate is put on sale and enters the second phase of the project, who will buy my real estate?
"Lao Shen, it's difficult for me! Chen Feng ran to my hometown to start a new commodity international, and I don't know where he got so much money, and he has a good relationship with several super fruit merchants in Guangqu and Xiangjiang, and a group of people are united, and they are holding me down!"
“......”
"Lao Shen, I'm not shirking, I'll take a picture of you, you see, I'm losing fifty pounds, and my body size is not as good as Ding Hao's black fat man!"
“......”
Shen Zhipeng rubbed his eyebrows, "Anyway, even if you give up the Nanhe market that is deadlocked with Tianhao, you have to help me, as long as I resist and sell the new city of Zaoshi Ginza, we can turn the funds to the Beihe project that we are cooperating with." ”
"I understand...... Then, I will find a way to withdraw and support Zaoshi New Town Ginza!"
"As soon as possible!"
Old Shen picked up the telescope with a sad face and continued to observe Xingyue Bay in Zaoshi New Town.
At one point, the scaffolding, which was wrapped in protective netting and green, began to move upwards......
Wait a minute!
Lao Shen rubbed his eyes and suddenly saw that more than 150 buildings in Tiancheng were actually installing construction elevators......
What does it mean?
Isn't it necessary to build half of the elevator according to the construction?
How......
Without waiting for Lao Shen to solve his doubts, Tiancheng employees began to move the exhaust ducts in the bathroom and kitchen......
“???”
With doubts, Shen Zhipeng waited and watched for two days.
And then discovered......
Tiancheng building reached the sixth floor, and the construction of blocks and secondary structures began!
(In 01, there was no rule that 17 floors could be built.) )
Unfamiliar Tiancheng employees, after finishing the runway around the mountain and the corridor on the top of the mountain, rely on the engineering elevator,
Carry out waterstop formwork and concrete pouring on toilets and air-conditioning panels,
Planting reinforcement and masonry masonry on window sills, etc.,
Reinforcement binding, formwork, and concrete pouring of concrete components......
"That's too fast, isn't it?" Old Shen saw that his scalp was numb.
However, Tiancheng's divine operation is still not over.
When the building reached the eighth floor and the block reached the third floor, smoke rose from the Tiancheng construction site, which lasted until noon the next day, which coincided with the first two construction and maintenance times.
(After the blocks are poured, they are cured with steam at 60°C for 17 hours to achieve early strength and shorten the curing time, as is also the case at the Incheon Bridge, so a precast beam can be made in two days.) )
When the fog clears, the building proceeds to the ninth floor and the blocks to the fourth floor......
Even started an energy-saving project?
Subsequently, during the maintenance period, Tiancheng employees treated the first layer of the interior and exterior wall base of each building, nailed steel wire mesh sheets at the junction of different materials, and then watered, sprayed, dotted, punched, layered plastering, corner protection, mouth wrapping, and maintenance......
Interior and exterior plastering?
Shen Zhipeng's heart trembled, and he rushed straight into the Tiancheng construction site and found someone wearing a red hat.
"Ge Lao Er, if you can put up tiles tomorrow, my old Shen will do it with you from now on!"
"What's the matter? The upper construction is not over yet, why am I putting tiles now, what if the tile master is hit by debris? Besides, if you want to do it with me, I won't accept it!"
“......”
Shen Zhipeng ignored someone's ridicule, stared at the Tiancheng construction site carefully, and even stood on tiptoe in order to take a closer look......
Ge Xiaotian was happy in his heart and waved his hand, "Drag him away for me!"
"Don't, I'll just take a look at ......"
"Why are you still rubbing!"
"Brother Ge, teach me, I'll give money!"
"Oh, give me the money?"
Ge Xiaotian raised his eyebrows, walked into the temporary office, and asked someone to bring tea, "What do you want to learn, hurry up, tomorrow on 312 Arbor Day, you should also receive an invitation from the leaders, I am ready to rest early and rush over early tomorrow morning." ”
"No hurry, no hurry!"
Shen Zhipeng stood at the door and continued to look at the 'climbing frame', "What is this?"
"A CNC hydraulic climbing device, self-developed by Tianji, good quality and low price!"
"How much does it cost?"
"This is a natural patent, the secret of the company, you and I are in competition, do you feel the price?"
"One hundred thousand sets!"
"One hundred thousand?!" Ge Xiaotian couldn't help but shout.
The climbing frame is basically sold by the ton, following the ups and downs of steel prices, counting the processing fee and hydraulic devices, or changing to an electric hoist, the cost is about 3 times the price of steel, plus twenty or thirty yuan a square climbing frame safety net, the price is about 4~8 times that of steel.
A set of conventional climbing frames, weighing 2 tons, costs only 5,000 yuan.
And it has no technical content, that is, the steel pipe and steel plate plus the transmission system push the overall scaffolding to climb up.
People in this era do not use it, mainly because there are few high-rise buildings, and many time-saving techniques have not yet been understood.
After three or two years, the infrastructure construction exploded, and various construction methods emerged in an endless stream, and the climbing frame would soon be reduced to a conventional device.
After the completion of Xingyue Bay, the second phase of its own new city needs to be delayed for a year, and if you keep this thing in your hands, it will soon rust.
If it is transported to Nanhe or Wangjing, its own value is not comparable to the transportation fee, and it is a pity to lose it......
That's why he just said that the price is good.
100,000, very profitable!
Sell one set of old ones, buy ten sets of new ones!
Shen Zhipeng saw that Ge Xiaotian fell silent, "Don't squeak, like this, 150,000!"
“???”
"Two hundred thousand? That's a bit expensive. ”
“......”