Chapter 154 New Rural Construction (5)
Seeing Li Songchen coming, He Shengdong immediately came over to greet him: "Minister Li, are you here to guide the work again?"
Li Songchen said with a smile: "He Gong, I am a layman in this project, so what work can I guide, but I just came to see if there is anything I need help with." ”
He Shengdong also smiled and said: "There, you got us a batch of cement last time, and it was already very good, but now there is nothing for you to deal with." ”
Li Songchen said: "That's good." He looked at the adobe bricks and said, "I remember that the wall work at this site is almost complete, do you still need so many bricks?"
He Shengdong explained: "The bricks on this site are enough, but now the bricks are being prepared for the later projects, and now it is October, the temperature is okay, but the climate will turn cold in more than a month, and then the bricks will be dried at that time, but it will not be five or seven days of time, it may take more than ten days to dry a batch of bricks, and if you catch up with the snow and rain weather, it will be longer, so take advantage of the good weather now, dry more bricks, anyway, these bricks can be used in the future." ”
Li Songchen nodded and said, "He Gong really thinks about things very comprehensively." ”
He Shengdong said: "Let's go, since you're here, let's go to the construction site and have a look." ”
Li Songchen said: "Okay, let's go and have a look." ”
So the two of them left the brick-making site together, and walked towards the construction site, at the entrance of the construction site, set up several greenhouses, and dug several large pools, which were full of mud, some dry and some thin, and on the side of each pool, there were five or six captives, who were pushing a large winch, stirring the mud in the pool, and several captives were adding other ingredients to the pool. There were two other ponds where no one was disturbing, but someone was pushing a cart by the pool, scooping out the mud from the pond with a spoon and carrying it away. There was also a group of people sitting on the side.
This is the pulping area of the construction site, the mud for making adobe bricks, as well as the mud for bonding adobe bricks, are all made here, the drier mud is used to make adobe bricks, and the dilute mud is used to replace cement mortar, as a bonding material for masonry adobe bricks.
The bonding of adobe bricks does not use cement mortar, after all, the cement output in Tianjin is not high, and it cannot supply the new rural construction project at all, not to mention that there is another road construction project in the crossing group. Therefore, Tang Songlin's construction plan is still to choose to make bricks of yellow mud sand and then add water, mix into thin mud mortar, and then add a small amount of lime, cement and rice soup, you can use it as a bonding material, and the bonding effect is not much worse than cement sand, the construction of a flat floor of the house, is completely sufficient, this is of course Tang Songlin's experience, other engineers basically only know the use of cement, it is impossible to think of this kind of construction method.
He Shengdong looked carefully at each pool, scooped up some mud from the pool, reached out and stirred it in the mud, and tried the viscosity of the mud, because the main materials of the project rely on these muds, so the quality of the mud will directly determine the quality of the project. Although He Shengdong has never done a project using mud before, after all, he has rich experience in construction, and after working for more than ten days, he can basically grasp the nature of the mud.
Mixing mud is a very physically demanding job, and after ten minutes of work, a new group of people will have to come, and they need to rest in shifts. In the old time and space, large-scale mixing cement mortar, concrete are done by machines, the general large construction site will have several special large concrete stumbling machines, and small construction sites are more use of concrete churning trucks, the efficiency of the machine is of course much higher than manual, only a small amount of cement mortar will be manually modulated.
In fact, there are also several large concrete tripping machines and several concrete tripping trucks in the crossing group, and at the beginning of the project, they also applied to the temporary executive committee, hoping to pull out a few machines and equipment to improve the efficiency of the project.
However, after the discussion of the interim executive committee, this request was rejected, because the wear and tear of construction machinery is extremely large, and the life of a concrete stumbling truck is far lower than that of ordinary vehicles, and all the engineering vehicles that cross the group have basically been used for a considerable period of time, and the remaining service life is not long, if it is used in rural projects, it is really not cost-effective, and the construction technology of rural engineering is not complicated, and the mixing mud is also better than mixing cement mortar. Concrete is much easier, so it should be left in the more needed works, not to mention that now the crossing group has a large amount of free labor, and it is entirely possible to compensate for the efficiency of the construction by the amount of labor. Only two rollers were approved because the wear and tear of the rollers was relatively small.
Li Songchen and others naturally have to abide by the decision of the executive committee, so the new rural construction project has hardly used power machinery, and it completely relies on manpower, but so far for this reason, it has also done a good job.
After walking through the pulp shed, it officially entered the construction site of the construction site, at this time, people came and went at the scene, building walls, beams, handling, carrying burdens, etc., shuttling back and forth, busy, to a scene in full swing.
At this time, the whole construction site has been first occupied, there are more than 30 houses that have been completed, and most of the other rooms have been completed, and the construction of the roof has begun, and the slowest wall is more than one meter high, and there are more than a dozen people in each room around the wall, but the construction is almost all a foreigner captive. And the traversers are responsible for commanding, supervising, and guiding on the spot.
Originally, at the beginning, most of the construction workers who crossed the group were still hands-on, but as the project progressed, many captives gradually mastered the construction of the wall. In fact, wall building is the most basic technology of masonry, and its own technology is not complicated, as long as the control line is pulled well, and the requirements for wall building in flat-story houses are not high, and there is no big problem with an error of a few centimeters, so now the basic technical work is done by the captives, and the traversers have all become managers.
According to He Shengdong's plan, within this month, the construction site can be completed, and after 15 days, the main project can be basically completed, and most of the workers and equipment at the construction site can be transferred to the next construction site, as long as there are enough materials, before the Lunar New Year, the construction of two more construction sites can be completed.
Li Songchen is very satisfied with the progress of the construction, now a total of six project teams at the same time, if before the new year, each project team can complete the construction of three construction sites, then a total of 18 to 20 new villages can be completed, about 2,500 houses can be built, if each house 6-8 people live, can accommodate about 20,000 people, although can not completely accommodate all the peasants, but it is a great achievement. At this rate, it will only take one year to complete all the rural construction in Tianjin.
Li Songchen said: "He Gong, do you still need manpower on the construction site now? This time the victory of the battle, we have captured a lot of German soldiers, about 7,000 people, so our labor force is very sufficient, if we still need manpower, I can apply to the executive committee, the executive committee rejected our application for construction machinery, it is still possible to ask for more people." ”
He Shengdong shook his head and said: "There is no shortage of labor now, if you can, you can apply to the executive committee, pull out a few generators, improve the living conditions of the construction site, and stabilize everyone's mood, we have seven people on the construction site, and two people wanted to go back yesterday, and I was persuaded by the difficulty, but if the living conditions on the construction site are not improved, I am afraid that there will be people who leave." ”
When Li Songchen heard this, he also smiled bitterly, and said: "He Gong, the situation of several other construction sites is similar, and they have all responded to me, and your construction site is quite good, there is a construction site where nine people have left, and I will reflect this problem to the executive committee." ”
He Shengdong said: "The living conditions on the construction site have indeed reached the time when they must be improved, and this matter depends on Director Li." ”
Li Songchen said: "I can only do my best, He Gong also knows that the conditions of this era are limited, and the resources that the executive committee can mobilize are also limited, and it is impossible to put all the resources here, so the improvement of the living conditions on the construction site is also limited, at most we can only improve the treatment of the construction site personnel, and increase everyone's work points, but we still have to do more ideological work for others." ”
Now the crossing group is all the implementation of a comprehensive planning system, everyone's life, food is all planned supply, and all the workers have no wages, but recorded as work points, after all, this kind of planning system is not long-lasting, sooner or later to implement the wage system, and after the start of the implementation of wages, these work points can be exchanged for currency.
Although the vast majority of non-military traversers are engineers and technicians, there are not many real otaku rotten women, and compared to the people of the old time and space, these people's adaptability to the environment is relatively strong. However, the construction conditions of the old time and space are getting better and better, not only in the project a large number of new technologies, new materials, new processes, so that the complex process technology is gradually simplified, and the awareness of environmental protection is also constantly strengthened, but also greatly reduce the labor intensity of the construction personnel, and the environmental quality of the site, by which is the living conditions of the construction personnel, has also been greatly improved, the general use of assembled Shule board room, not to mention the network, wifi popularization, so that the construction personnel's spare time life is very rich, not boring.
Moreover, the living conditions of the construction personnel of foreign projects are even better, and special dormitories for construction personnel will be built basically, and all kinds of living facilities are basically available, except that there is no family to live together, and there is no difference from the general house.