Chapter 1517 Heavy straight first flight, gas turbine delivery
Wang Dazhi's trip to the capital was unusually smooth, and there was no "ugly face, ugly words, and difficult to do" situation, and I don't know which leader said hello, every department is very enthusiastic about Wang Dazhi, not only in the procedures are given priority, sometimes even directly cut in line, Wang Dazhi stayed, of course he knew that all this was definitely because of Chen Geng, but the question is: what did we Chen Dong do? !
The answer to this question did not make Wang Dazhi wait too long, when a few months later, George Jr. officially took office, and China and the United States once again negotiated on the issue of WTO accession, Wang Dazhi, who was watching the news, overheard the introduction of the negotiation team members of the United States side on TV when mentioning "Ms. Rosemary, Deputy Minister of Commerce of the United States", suddenly a spirit, the first reaction was: the same name, right?
But the next moment, when the camera showed "Ms. Rosemary, Deputy Minister of Commerce of the United States", Wang Dazhi's mouth was wide open......
Wang Dazhi is too familiar with Miss Rosemary, the chief butler of his own chairman, even if he is on TV at the moment, Wang Dazhi can recognize it at a glance, this Rosemary is the Miss Rosemary next to Chairman Chen Geng.
After confirming that this Rosemary was the Rosemary, the doubt that had been surrounding Wang Dazhi's heart was solved in an instant, but the previous doubt was solved, and a new doubt appeared: Why did Miss Rosemary enter the George government and become the deputy secretary of commerce in the George government?
However, this is all a few months later, as for this moment, Wang Dazhi ran all the formalities, and it took less than a week, not only that, but when Wang Dazhi came back, he still brought 20 billion special funds - if this thing is said, it will definitely make those company CEOs who have broken their legs for a project and run for several years to vomit blood: 20 billion, it was given in less than a week?
........................
With money, ready-made engines, the final reducer that has completed the design work and is in the testing stage, and the various materials they have accumulated over the years on the "aerial crane" provided by Captain Li, the progress of the COMAC version of the "aerial crane" project is very smooth, it can be described as a thousand miles in a day, and it took only six months for COMAC to complete the manufacture of the first batch of three prototype fuselages.
Of the three fuselages, in addition to one for static tests, the other two began to be assembled for flight tests.
Three months later, the first two installed prototypes officially began to test, because on April Fool's Day this year, a lost EP-3 could not find the airport and finally had to land at our airport.
From this action, it can also be seen that the country has really given up illusions and attaches great importance to the modernization of national defense - too, it has been slapped four times in the past eight years, especially in the past five years, and has been slapped three times in succession.
In this case, the senior management of the COMAC Group, including Wang Dazhi, is under great pressure, but it has to be said that Sikorsky's basic design is really very solid, and Viktor and Vladimirovich Kapaya are also worthy of being the former deputy chief designer of the Miri Design Bureau.
Just half a year after the first test flight of the commercial version of the "aerial crane" heavy helicopter, the first two sets of marine version of the RB211 gas turbine were officially delivered to the customer, to be precise, two sets of marine power generation systems with the marine version of the RB211 gas turbine unit as the core, and the users of these two sets of offshore power generation systems for offshore oil drilling platforms are undoubtedly the CNOOC Corporation.
For such a major event, of course, the senior management of COMAC Group attended all of them, and Wang Dazhi and others were all dressed in suits and leather shoes, and their faces were full of red light!
As long as the feedback effect of these two sets of gas turbine generator sets is good, then in the future, not only CNOOC Corporation, but also the orders of the other two oil companies will definitely make COMAC receive soft hands.
In the face of Sun Weiguo, the boss of CNOOC Corporation, Wang Dazhi's attitude was also very polite: "Mr. Sun, this is the first time we have done an offshore gas turbine generator set project, if you find any problems in use, please don't be polite, you must notify us as soon as possible." ”
"Mr. Wang, you are too polite, your gas turbine has proven its strength in the previous sea test, I am now a hundred assured of the quality of your products, I believe that we will have more opportunities for cooperation in the future." ”
Sun Weiguo is also very polite, you know, according to the previous agreement reached between CNOOC and COMAC, in order to ensure the normal use and operation of these two sets of gas turbine power generation systems, COMAC has directly dispatched a technical team to station in this offshore drilling platform, the purpose is to provide technical support to CNOOC at any time, and problems can be solved in the first time.
The operation of the CNOOC is very special, many of their oil production points are at sea, you can also think about it a little bit, it is very difficult to provide power to the offshore derrick that is tens of hundreds of kilometers away from the land, but at the same time, the offshore oil drilling and production system, that is, the offshore drilling platform has a very strong demand for electricity, so for the offshore drilling platform, the power generation system is the top priority.
Prior to this, the power generation systems used in our offshore drilling platforms were outsourced, on the one hand, due to reliability and continuous working time, but on the other hand, there was no high-power gas turbine power generation equipment in China that could meet the power required by offshore drilling platforms.
How eager is the demand for these two sets of gas turbine power generation systems, so eager that these two sets of gas turbine generator sets are not even new, but the two that were previously installed on the test ship for testing, because the performance was good after the experiment, and the CNOOC Corporation really couldn't wait, so after discussing with the CNOOC Corporation, COMAC Group carried out a comprehensive overhaul and maintenance of the two engines, and directly took the two gas turbines as the core to help the CNOOC Corporation build two sets of generator sets—— Of course, the price is also a lot cheaper.