Chapter 104: Trial Operation

When they arrived at the construction site, there was already a huge temporary warehouse nearby, which was prepared for the road construction. Pen ~ fun ~ pavilion www.biquge.info saw that the warehouse was brightly lit, and dozens of people were sitting on chairs waiting quietly. But if someone looks closely, they're sure to see their fingers stuck in a dedicated socket.

Quietly charging.

The vast majority of these terminators are T300 type terminators, and a small number of T400 terminators have performed a lot of tasks in the previous period, and it is understandable to recharge and replenish energy now.

Song Yang and the others quietly looked at the people in front of them and sighed: "Your workers look like soldiers." Always so meticulous. It's very stressful. ”

The prince next to him also nodded in agreement.

Only Si Fan looked at them strangely, his eyes full of weirdness.

"What are you two still doing here, don't you have nothing to do?" asked Si Fan.

The two of them were stunned at the same time.

"We're waiting for you to get to work. Look at your construction. I have never seen such a large machine work, but I have seen a lot of high-end equipment in developed countries. But I haven't really seen much of this large equipment. Song Yang said in praise.

The prince next to him looked at Song Yang with disdain, but he was still nodding.

Si Fan glared at them.

"During the construction, you can only watch from afar, you can't get close, the construction speed is too fast, don't hurt you, a rich second generation, a prince, if it breaks anywhere, I can't afford to pay for it!"

After saying that, he yelled at the terminator opposite, and immediately saw that the terminators all stood up and lined up in an orderly manner to accept Si Fan's review.

"Start to work, according to the previous design blueprint design, plant transplantation is placed at the back, and the previous process is completed at one time!" After Si Fan made the arrangement, he immediately saw the terminators scattered like an army and rushed behind the huge construction machine in front.

The T707 Highway Trailblazer Terminator weighs a full 120 tons, which is so huge in the desert at this time. Si Fan was still apprehensive now, it was no accident that this huge terminator could appear here. This is all the company's working capital, the money from the sale of the entire European garden, plus all the company's funds and their original capital.

Even so, Si Fan still owes 500 million bank loans, which is beyond the limit of everything Si Fan can bear. In order to let this highway fire the first shot. To be the world's only contractor for solar highways.

When the time comes, I'm afraid that there will be no engineering to do? When the time comes, this Big Mac will be an old hen that lays golden eggs.

After Si Fan gave the order, he dragged the two people into the shed just now, and there were more than a dozen large trucks being driven by the Terminator next to him.

"What is this for? Why are they constantly transporting things?" Song Yang asked Si Fan incomprehensibly, this highway is going to be built now, there is no plan that can be seen in front of him, and no one has even completed the roadbed in advance. He had no idea how exaggerated the T707 trailblazer was in front of him.

According to his understanding, a highway is contracted in sections, and even if it is not contracted according to the road section, it is also built according to the road section, but the current situation is different. It seems to be making a fuss about this huge machine.

And what exactly this article is, they are all blinded.

Only Si Fan is a little bitter, and the current start is not an official start, but the trial operation stage of the machine.

When the official start of construction is started, there will be a large number of professionals such as supervision engineers and surveyors...... Visit.

That's right, and they're only going to have to visit. Because the road paving in front of them will definitely break all their conjectures about road construction.

"Now you guys just watch, let's start the construction for half an hour to see how fast the efficiency is, and by the way, give His Royal Highness the prince a reassurance, so that you don't have to be so nervous. Si Fan pointed to the road ahead.

"If you want to build a highway, you must first lay a good roadbed! This roadbed is the foundation of a road, but we are different, all the equipment can be done at one time, including solar power generation equipment, but the installation of this equipment is in a state of secrecy. Tours are prohibited. Si Fan explained.

After just a moment, the prince next to him suddenly said.

"You just said that there is a roadbed on the road, so how do you do it all at once?" asked the prince.

At this moment, I saw a huge equipment like an all-metal pot-bellied truck suddenly stretching out countless heavy tools, and it was as if a storm had passed on the ground.

The entire soft semi-sandstone structure has been turned over and over again, mixed with a large number of other materials, changed its quality, and then completely tamped! There is absolutely no hesitation! And before it is tamped, there is actually an underground pipe directly inserted five meters underground! In the future, it can be connected to cables, optical fibers, and other wires.

This is an exaggerated level of efficiency, and what should have been done one job at a time is now all in one place, with the T707 trailblazer continuing in a zigzag route, with every piece of the road surface being treated.

The prince and Song Yang were stunned. They really don't know what this machine is doing. And when working, it often spews out white gas, and no one knows what this gas is.

But they'll find out soon.

After ten minutes, they looked at the road in disbelief. The road has been completely built, and what remains behind T707 is the road that people usually see, but these roads are a little different, and there are some dense grids on these roads in front of you, as if there is metal inserted under the road.

The road surface is also not as rough as the previous road, and has strong friction. Here a large number of surfaces on the road appear extra smooth and seem to have been specially treated.

The highway is a serious eight-row road, which is relatively normal, but there is a substation box buried deep in the ground on the ground at the beginning of the road.

Nothing else. The simplicity makes you feel as if you're on a unique and creative highway.

However, Si Fan still explained the answer to them.

"Five meters underground, there is a socket for connecting cables, which can be connected directly to the main power supply cable to output electricity. It can also be connected directly to the power reserve module of the solar power plant, so that the power can be cached from the battery pack in the power station, ensuring a 24-hour power supply per day. Si Fan explained. However, for this power station equipment, it will need to be built additionally. The core technology is actually a battery pack with sufficient buffer capacity. Si Fan really doesn't have this thing now!(To be continued.) )