Chapter 138: Land Use Planning

Seeing Director Zhang's surprised expression, Fan Yang's vanity was greatly satisfied.

For Director Zhang, there is still a little bit of kindness.

If it weren't for a traffic jam at the beginning, it would have been just a crossing in Hanzhong.

My own development will definitely lag behind by a year or two.

The industrial zone has provided itself with too many conveniences, like this persimmon processing factory, there are many problems in the first place.

The processing time of persimmons is only two or three months, and they are picked in October every year, and the persimmons will be taken off the shelves in December.

In other words, this food factory only works for three or four months a year, and it is the sky.

A large number of temporary workers are required.

Hiring on your own is certainly not possible.

But Hanzhong is definitely fine.

On the other hand, in terms of machinery and equipment, Fan Yang only plans to purchase about ten peeling machines.

This kind of simple machinery can be done by domestic equipment manufacturers.

There are dozens of ready-made fruit processing plants in the two canned fruit factories in the industrial zone.

If you can't do it, you can also outsource the process of peeling to these food processing factories.

What Fan Yang needs to do is very simple, level the land and build a two-meter-high shade shed.

The initial 200,000 yuan is enough to complete the infrastructure.

Fan Yang likes this stupid way of starting a business, not to mention the high profits, but also has no technical content.

In the first two years, it was processed purely manually.

When you make enough money, you can build a cold warehouse and introduce the mechanical processing method of Korean persimmons.

It's perfect.

After lunch, Fan Yang proposed to go and see the land he had been granted.

This was finalized on the last trip to Hanzhong.

Right behind the industrial zone.

Director Liu helped a lot and sorted out the foundation for Fanyang according to the standards of the industrial park.

Power cables were also laid, and a large 20 cm wide water supply pipe was pre-laid.

And all of this is actually free.

I am still very grateful to Director Zhang.

It is still very necessary to have a good relationship.

He complimented Director Zhang a few words, and also gave the same gift as Director Liu, the watch of the Omega Constellation series.

Seeing that it was a watch, Director Zhang also smiled.

"Then let's go, I'm going to eat today, where are I going to eat?" Fan Yang said with a smile.

"You're looking down on my brother. Director Liu said angrily.

Xiao Zhang also said: "Manager Fan, we have already arranged it, or Shuntong Restaurant." ”

With the addition of two cars, the style of travel is different.

Director Zhang and Director Liu, who also have special car drivers, slipped five cars, drove out of the toll booth, and drove towards Shuntong Restaurant.

Walking to the place, the manager of the restaurant was smiling and had been waiting downstairs for a long time.

Seeing Director Liu's car in front of him, he was still quite calm, but when he saw Fan Yang's Audi, he suddenly panicked.

Quickly bypass Santana and head straight for the Audi, ready to open the car door attentively.

As a result, a little old man who cowered: "Thank you." ”

Fan Yang also raised his feet and stepped down.

The restaurant manager was momentarily confused.

"What are you doing in a daze, Mr. Fan, Mr. Zhao. Director Liu said angrily.

"Oh, Mr. Zhao is good, Mr. Fan is good, please ...... inside"

The restaurant manager made a big red face and smiled all the way.

Shuntong Restaurant is a municipal unit, accustomed to the reception of leaders, and the quality of employees is very high.

Hospitable all the way.

Zhao Guangming has always been excluded, Fan Yang's activities before, did not take him, he lived for most of his life, made a windfall, but never received such a courteous reception, before he walked to the place, someone pulled out a chair, handed a towel, sent water and tea, a mouthful of Mr. Zhao, thank you in his mouth and said non-stop.

And Shuangshuang and Liu Dingxin look much better, both of them are dressed in professional clothes, carrying leather bags, and carrying all kinds of materials prepared.

Now the two of them have a deep belief in what Fan Yang said that they have huge connections in Han.

On the table, push the cup and change the lamp, and get along well.

After eating, Director Liu proposed to go to Fan Yang's construction site to have a look.

Five cars drove towards the industrial park again.

Fan Yang's Audi took the lead, and the doorman in the park, like the restaurant manager, also thought that the direct leader came to inspect the work, so he was startled and hurriedly asked someone to notify the director of the office in the park.

Fan Yang and the others got out of the car, and before they could go far, they caught up with a group of people from behind.

Hugging back and forth, they walked to the construction site.

From a distance, I saw a few mixers on my ten acres of land, piled up with river sand and cement next to them, and a foreman with a hard hat was directing dozens of hydropower workers to lay pipelines for Fanyang's land.

Next to him stood an architect wearing a hard hat and holding a folder.

"How about it, brother, the water and electricity are laid in place for you, and there is a sewage pipe behind it, you don't have any pollution, you do it in accordance with the process of the park, are you satisfied?"

"Satisfied, I owe you a favor, brother. ”

"If you owe anything, I'll help here, and you have to bear the rest. ”

The engineer who directed the pipeline, and the architect in a hard hat, walked over.

Director Liu introduced: "This is Wang Gong of the State Administration of Water and Electricity, and this is President Fan. ”

"Fan is always good. ”

"Hello Wang Gong, it's been hard work. ”

Director Liu pointed to the other architect and introduced: "This is Mr. Fan, this is Liu Gong of the second construction of the city, the second-level architect, your project is not complicated, you will communicate later, and the project cost and later requirements will also be said, and this matter will be handed over to Lao Liu, you can rest assured." ”

"Fan is always good. ”

Fan Yang looked at a middle-aged man in his forties and stretched out his hand: "Hello Liu Gong, hard work." ”

"I haven't helped yet. Liu Gong smiled innocently.

Fan Yang's favor increased greatly.

10 acres of land, the size of 15 basketball courts, all built into factories, is already a big project.

But it doesn't have to be that complicated.

Fan Yang asked for ten acres of land, which was to be expanded in the future.

After all, such cheap land is not easy to find.

"I'm very simple, first plan the use of 5 acres of land, the rest is temporarily empty, first of all, a circle of two meters high wall, a width of four meters, three meters high factory gate, to facilitate the entry of trucks, build a two-story office building, not too complicated, concrete piles, prefabricated slabs and red brick structure on it, 6 to 10 rooms on each floor, each floor to have a separate bathroom, the first floor to take a kitchen, a canteen, the rest to use as a warehouse, the second floor as a staff dormitory, two offices on it, others, all into a 10 cm thick cement floor, flattened on the line, and then the surface built a 2-meter-high dry room, I'm mainly doing manual work, just build densely, and I don't know much about construction, so I bothered Liu Gong. ”

Liu Gong thought for a while: "This is indeed quite simple, just an office building is a little more complicated, you have to lay the foundation, the cement dam is simple, and what is the matter with the dry house?"

"This is simple, just use red bricks to build it out, I'll draw you a simple drawing when I go back, just come out according to this, and you estimate that this office building, and the cement dam are all leveled out, plus the toilet sewage, how much does the project cost. ”

"It's hard to say, to go back to the project budget, 5 acres of land, concrete to add steel bars, leveling the site we contract labor and materials in about 20 yuan a flat, about 50,000 or 60,000 it, the office building to lay a three-meter foundation, the floor is not high, it should be 50,000 or 60,000 yuan, the total cost, estimated two or three hundred thousand yuan, have to finalize the plan to report the standard. ”

"Two or three hundred thousand?"

Liu Gong nodded: "I don't count what I said, probably." ”

Fan Yang looked at Director Liu: "Brother, it's over-standard, the money for this base is all on my head, you might as well find me a factory in the park." ”

:。 :