Chapter 1057: Longteng Heavy Industries

"Another point is that the pipe gallery module itself can also be modularized. If needed in the future, it can be disassembled and expanded......"

Finally, the introducer said seriously. Animations also appeared on the big screen.

The Justice module is also modular construction. It is directly assembled with multiple modules. If needed in the future, the modules can be disassembled.

When the time comes, it doesn't matter if it's bigger, or smaller, or if it's a change in functionality, even if you add a new layer of pipes.

The most important thing is standardization. Standardized components. If that piece is damaged, just remove it and replace it.

At the same time, it can be recycled. In the future, if there are new changes in the city, then these modules can be recycled and reused.

After listening to the explanation, the officials of Gui Province were very satisfied. Such a module is in line with the development of Gui Province.

Although such a module is a little more expensive than a reinforced concrete one. However, the service life and safety and convenience are much better than that of reinforced concrete modules.

At the same time, the construction speed is much faster than that kind of module. Most of the reinforced concrete modules are poured on site.

It takes a lot of time to build. But this is not the case with the modules of the Longteng Group. The whole is broken down into small pieces.

Then you have to assemble it like building blocks. The whole module is trapezoidal, and after the foundation is made, it can be directly hoisted on it. Then the surrounding area is sealed.

Efficient, modularity is the biggest advantage. Assemble next to the construction site. Then use large equipment to directly lift the module and put it down.

Now Huaxia's large-scale equipment is very good. The speed at which the land is excavated is very fast. In this day and age, speed is everything.

Officials in Gui Province are satisfied, and so are the investors. Although the module is more expensive than the concrete module, it is cheaper than the concrete module in general.

Because of the short construction period of this thing, the wages of the workers alone can save a lot. In addition to these, build well as soon as possible and return the funds as soon as possible.

For investors, if they can recover their funds as soon as possible, they would rather make less money.

"Guys, in addition to our module samples today. Our Longteng Heavy Industries also brought some equipment. Please come with me to the back and we'll show you how. ”

The narrator said with a smile, and everyone immediately became interested when they heard this.

Longteng Heavy Industry, a heavy industry group under Longteng. It was only three years since its establishment, although it has been established for a short time, but Longteng Heavy Industry has developed rapidly.

No way, people have money. As soon as it was established, a very powerful heavy industry group in Huaxia was annexed.

In addition to the annexation of domestic heavy industry groups, Longteng Heavy Industries has launched a global acquisition journey in recent years.

Germany, the United States, Japan and other national heavy industry enterprises were acquired by Longteng Heavy Industries six of them. We have also developed a wide range of technologies.

In just three years, Longteng Heavy Industry has become the world's top heavy industry group. However, this heavy industry group is not profitable, and instead of making a profit, it still owes a lot of debt.

But even so, Zhang Fan still continues to invest in this heavy industry group. In fact, the performance of the global heavy industry group in recent years has not been very good.

But Zhang Fan doesn't care, Zhang Fan can afford to pay for this money. Under this attitude of burning money, the technology of Longteng Heavy Industry has risen like a rocket.

The entire expedition was taken into the experimental base, which was very large.

After entering the experimental base, everyone saw a large equipment.

This device is too conspicuous and too big. It's like a Big Mac.

"This is a bridge erector?"

Some knowledgeable people couldn't help but ask. This thing is a bit of a bridge erector. Generally, it is easiest to see when building high-speed rail.

"Yes, but this is a ...... specially erected comprehensive pipe gallery"

The narrator said with a smile and took everyone directly to the experimental base.

Inside the experimental base, there is a road with a length of one hundred meters. This 100-meter road is a two-way, eight-lane road.

Counting the central and two side barriers, the width is 30 meters. And this road is also of a high standard, and it is built according to the standards of the city's main roads.

"Ladies and gentlemen, we will show you the specific process of our Longteng Construction Group to build an urban comprehensive pipe gallery in the city. ”

The narrator said with a smile that this immediately made everyone interested. Everyone stood there and watched curiously.

"Walkthrough Start ......"

With an order, the drill officially began. The whole proving ground was busy. Trucks drove in.

The trucks are full of various assembly modules. Workers began to get busy, stacking the modules at the front of the road where they began to assemble at a very fast pace.

While they were assembling, the engineering vehicles here also began to get busy. Two vehicles drove in. The vehicle enters the road, and the equipment behind the vehicle starts to get busy.

Road breaker, accompanied by the sound of crushing. The road breaker began to move forward. By the time the road breaker had walked by, the brand new road behind it had been shattered into pieces.

The forklift truck behind directly followed, scooping up the pieces and pulling them away in the muck truck.

The efficiency of the two crushers is very fast, with a crushing width of 3.5 meters at a time. During the crushing process, speeds of up to five kilometers per hour can be reached.

The crushing distance of up to 84 meters per minute is very fast. Hundreds of meters of road, a little more than a minute to the end.

In just five or six minutes, the two crushers crushed the entire road surface for hundreds of meters. Looking at this shattering speed, those who know how to swallow their saliva.

This efficiency is too high, much faster than the average road crusher. The technology behind this is very powerful.

It is necessary to have a strong technology not only for the material of the crushing device, but also for the technology of the crushing process.

When the crusher is finished, the forklift has basically finished removing the debris from the road. The subgrade soil layer is directly exposed.

Just when everyone was curious, four excavators entered the site. These four excavators are different from the ones you usually see.

It's not the hydraulic stunt, it's the wheel that plays the stunt. The front digging blade is a disc type. This kind of excavator is generally used on super-large excavators, and is generally used in mines.

But these four excavators seem to be of a smaller model. And above the excavator, there is also a dirt conveyor belt.

At first glance, it looks like a combine harvester. Four excavators entered the site, and the front runner began to turn. When the runner rotates, the soil is directly transported out of the conveyor belt.

The muck truck was already ready to move with the excavator. The huge wheel is like a giant roller. The width is a little wider than the track width of the excavator. As the excavator moved forward, everyone's eyes widened.