Chapter 525: Stealing Teachers to Learn Arts

"The largest bridge project we have done so far is the Yongning Yongjiang Bridge, with a total investment of 60 million.

The bridge structure is an SRC medium-bearing reinforced concrete arch bridge, with a main span of 312 meters and a bridge width of 12.4 meters, which is the largest bridge of its kind.

Won the second prize of the National Science and Technology Progress Award!" Although I don't know the intention of Yu Qingyang's questioning, it does not prevent Mr. Liang from boasting about his company's performance.

"Not bad!" Yu Qingyang nodded, did not continue the topic, and picked up the wine glass and touched it with Mr. Liang.

Yu Qingyang's performance made Mr. Liang a little confused, and it was difficult to ask what the question just now meant.

After the opening banquet, Yu Qingyang returned to the company.

The tourist road project said that he was the project manager, but in fact, it was more of a nominal name.

Nowadays, the scale of Huayu's investment and development is getting bigger and bigger, and there are a lot of documents just to sign him every day, how can there be so much energy to stare at the construction site.

It's more about showing an attitude.

Comparative Tourism Road is the first first-class highway invested by Huayu Investment Group Company.

It is the first investment in the field of road and bridge infrastructure, and Yu Qingyang shows his importance in this way.

To this end, Yu Qingyang specially transferred Wang Yiming, the chief engineer of Huayu Second Construction, to the project management company as the chief engineer.

And the general contracting will be handed over to the strongest Huayu Erjian.

At the opening banquet at noon, Yu Qingyang didn't drink much.

A total of two glasses of wine were drunk.

This is the privilege of elevating status at the wine table.

As a leader, you have the privilege of not drinking alcohol and drinking less.

Except for the first glass of wine at the beginning, Yu Qingyang drank it dry with everyone, and the second glass of wine, Yu Qingyang served it until the end.

Duan Gang followed Yu Qingyang into the office and helped him make tea before handing him the documents that needed to be signed.

"Mr. Yu, this is the fund application from Huayu Real Estate!"

"Hmm!" Yu Qingyang nodded.

Huayu Real Estate is not bad for money now, but it does not mean that these money Huayu Real Estate can spend it casually.

You must know that when the subsidiaries were first established, Yu Qingyang castrated all the subsidiaries.

The most important personnel and finances have been castrated.

Although the following subsidiaries are independent legal entities with separate accounts, all accounts are under the control of the group company.

The incoming and outgoing accounts are through the finance department of Huayu Investment Group.

Large-scale capital expenditures such as acquiring land and allocating project funds all require Yu Qingyang's signature.

Yu Qingyang opened the fund application and took a look.

Xing Xiang's actions are very fast, and he has completed the registration of more than a dozen second-tier city branches such as Jinmen, Ludao, Jinling, Lin'an, Gusu, Rongcheng, Qindao, Zhujiang, Yongcheng, Wenzhou, etc.

And signed a letter of intent with the local government on the development of Huayu Century City CBD project.

Now these second-tier cities, the new first-tier cities in the future are developing, and it is relatively simple to get land.

In particular, this kind of large-scale CBD project is more popular with local governments.

The plots of land in each city are not small, with a land area of more than five million square meters.

And there is no need to put up for auction at all, it can be done directly in the form of agreement transfer.

Note: The Provisions on the Transfer of State-owned Land Use Rights by Bidding, Auction and Listing were only implemented in 2002.

Therefore, it is not illegal to acquire land by way of agreement transfer now.

Except for first-tier cities such as Beijing that need to be listed for auction because of fierce competition, other second-tier and third-tier cities do not need it at all.

Xing Xiang's actions were fast, and the speed of spending money was also fast, 35 billion plus the previous 4.5 billion, close to 40 billion, and he spent it all.

Of course, although more than a dozen branches in second-tier cities have been registered and have office locations, they are basically empty shells.

Only a few administrative clerks were holding up there.

Within two years, it will basically not be developed.

At present, Huayu Real Estate's main focus is still on the development of four first-tier cities.

Yu Qingyang read it and signed it.

Give it to Duan Gang.

"This is the capital plan reported by the Ministry of Finance......"

"This is the performance appraisal ......of each unit and the project department last month reported by the Audit and Supervision Department."

"This is the work report of the summer recruitment submitted by the Ministry of Personnel......"

Yu Qingyang followed Duan Gang's prompts, browsed them roughly, and then signed his opinions on them one by one.

Seeing the summer recruitment report of the Ministry of Personnel, Yu Qingyang took a closer look.

This summer's recruitment situation is not bad, with more than 150 new undergraduate graduates, more than 300 junior college graduates, and 67 technical secondary school graduates.

This educational structure made Yu Qingyang more satisfied. The new graduates of the company have not yet been assigned to various departments and are undergoing pre-job training.

"You inform the personnel department that after the pre-job training, all the new graduates of the company will go to the construction site and work on the front line for three months. ”

"What about technical school graduates?"

"According to the original regulations, after the training, I signed a contract with Huayu Labor Service Company first, and then sent Aji Jilia to it!

After working in Ajigeria for three years, I will return to the company to sign a formal labor contract!"

"Yes, I'll notify the Personnel Department!" Duan Gang was ordered to go out and issue a notice.

As time went on, Yu Qingyang became less and less worried that someone would not be able to stand the hardships of leaving the construction site.

Graduates who can't stand loneliness and can't stand the hardships of the construction site, no matter how high their academic qualifications are, they are not the dishes invested by Huayu.

Yu Qingyang is ready to use this trick to sweep the sand and screen the new graduates again.

This is also a common routine used by those large-scale engineering construction enterprises in later generations.

Whether you are an administrative or technical graduate, come to the company and experience life on the construction site first.

In later generations, many central enterprises recruited, and the conditions were very lenient, as long as there were graduates equivalent to full-time college degrees.

However, joining the company is not to sign a contract with the company, but to sign a contract with the labor company, and then assign to work in a project department.

If you can persevere and be recognized by the leaders of the project department, you can become a regular member and sign a labor contract with the company.

It's a pity that most people can't persevere.

Of course, it's not all the graduates' fault, the policy that was originally very good has slowly changed its flavor in the following companies.

Many fresh graduates leave their jobs, not because they can't endure hardships or loneliness, but because they can't see hope.

......

After the opening meeting.

Then there is the pile handover meeting, and the drawings will be reviewed.

In this process, Nanjiang Road and Bridge began to build the project department in accordance with the standards of the bidding documents.

Without waiting for the project department of Nanjiang Road and Bridge to be built, the construction team began to enter the site one after another.

The first to go to the field is naturally the pile foundation team.

Underneath the muddy bridge is a huge ravine, which is the ravine that the mountain flood has washed out after a long time.

This ditch connects to the muddy reservoir and is one of the main sources of water for the muddy reservoir.

During the rainy season, the mountain springs and torrents flow down this ravine into the muddy water reservoir.

In October, it is the dry season, most of the mountain springs are not coming out of the water, and the flow in the valley has been cut off.

It happens to be the best season for construction.

Yu Qingyang heard that the pile foundation team had entered the site, so he went to the scene to take a look.

The pile driver used in the pile foundation of Nanjiang Road and Bridge is a reverse circulation drilling rig.

It's a very bulky type of drilling rig.

However, the geological conditions of the muddy bridge, the bedrock underneath, the efficiency of making bored piles on the bedrock, or reverse circulation drilling rig, is relatively high.

"The equipment came in very quickly?" asked Yu Qingyang with a smile.

"Enter the site in advance, overhaul the machinery first, and get ready to start work!" Mr. Liang replied with a smile.

"Well, yes, you should have prepared it in advance! Is your steel processing plant ready?"

"I just finished beating concrete yesterday!

"Hmm! Is the rebar plan reported?"

"It's been submitted to the materials department!" replied Wang Yuepeng, the project manager of Huayu Second Construction.

"When will you be able to arrive? Mr. Liang's drilling rig has already arrived, and it can't be caused by the steel bar!" Yu Qingyang reminded with a smile.

For the road and bridge in southern Xinjiang, the steel and concrete are all supplied by A.

"You can be there within a week! It won't delay Mr. Liang's use!" Wang Yuepeng responded.

"Well, Mr. Liang, what other difficulties do you have on your side?" Yu Qingyang asked again.

"Mr. Yu, someone came to me yesterday and wanted to take over the ......," Mr. Liang hesitated and said.

"Mr. Wang, do you know this?"

"Mr. Yu, it's from the Mushuiquan Village Committee, I talked to them!

Don't let them interfere with the bridge, if you want to work, give them a little on the way back!" Wang Yuepeng hurriedly explained.

"Well, according to our rules, if you want to do machinery, let him find a mechanical service company to sign a contract, and if you want to do labor, let him find a labor company to sign a contract!

Mr. Liang, you don't have to deal with them here!

If someone is looking for trouble with you, you can find Mr. Wang or call me directly!" Yu Qingyang said very strongly.

Yu Qingyang had the confidence to say this.

The tourist road is not far from Huayu Century City, that is, across the street, and the little ruffians in this neighborhood really don't dare to find trouble with Huayu investment.

Yes, it has long been packed up.

"Okay, thank you, Mr. Yu! We can rest assured with your words!" Mr. Liang smiled from the bottom of his heart.

The most fearful thing about doing projects is that local relations are not easy to handle, and some people will make trouble.

It's a good thing for them to meet a strong Party A now.

"Oh, by the way, reinforcing steelers, carpenters, you have your own team!

If not, you can ask our labor company for someone!"

"Mr. Yu, do you still have a labor company?" Mr. Liang chuckled in his heart.

Xindao himself shouldn't have encountered a black project, right?

The so-called black project does not mean that there are any problems in the project.

Rather, it refers to Party A or the total heart black.

When I signed the contract, everything was good, I was very talkative, and I was very kind.

But after signing the contract, it changed.

Reinforcement and concrete are all supplied by A, which has nothing to say, and has long been noted in the contract.

The key is the construction machinery you need on site, excavators, forklifts and the like are also enthusiastically provided.

And then the workers are all ready for you enthusiastically.

Sounds good, everything is ready, the company just needs to come and manage it.

In fact, otherwise, the construction machinery provided by Party A, the workers are monopolistic, and the price is two or three percent higher than that outside.

In the middle, I will use an excuse to catch up with the schedule and find someone to surprise you.

The high wages are scary.

In the end, I'm afraid that these people are working for nothing, and they can't even earn management salaries.

As for the lawsuit, trouble?

It's useless at all, they don't know each other well, where are they going to make trouble?

If you fight a lawsuit, you can't afford to delay it, you don't have any evidence at all.

All kinds of contracts and you signed are clear, and you can't win a lawsuit.

Now this project is very much in line with the characteristics of that kind of black-hearted project.

"Haha...... Ha!" Seeing that Mr. Liang's face was not good-looking, Yu Qingyang knew what he was thinking, and patted Mr. Liang's shoulder, "Mr. Liang, you don't have to worry that we are a black-hearted company!"

The purpose of our labor company is only to protect the interests of migrant workers!

I'll ask the labor manager of the general contractor to find you, and you can talk about it!

It's definitely more suitable than you bringing people from southern Xinjiang!

Although the rebar workers and carpenters have worked on the bridge every day, they are all good hands on the construction site!

All of them are professionally trained, and they can basically be taught as soon as they are taught!

Plus, even if it's a gig job, it's much cheaper than what you get from the labor market!"

"Hehe! No, I didn't misunderstand! It's just that we have a team that has been cooperating for many years in this part of labor subcontracting!

Of course, if it's really like what Mr. Yu said, then it would be better!" Mr. Liang sneered.

Mr. Liang has already made up his mind in his heart, if he really wants to do what he thinks, he will simply leave.

I'd rather breach the contract than do this black-hearted project.

"It's your freedom to choose how you want!" Yu Qingyang didn't say anything more.

The reason why he asked Nanjiang Road and Bridge to use the workers of his own labor company was also for a purpose.

It's not to pit Nanjiang Road and Bridge, Yu Qingyang is not so tasteless.

is also to steal the teacher, as I said before, the reason why the bridge is subcontracted out is because the company under me has no experience in doing large bridges.

Whether it is a technician, the construction manager has no experience, and the workers have no experience.

Since it is a stealing teacher, it is natural to steal a teacher in an all-round way.

From technicians to constructors, to professional and technical workers, all have to steal teachers.

After finishing the bridge of the tourist road, take a few small bridges to practice and accumulate experience, and the next time you encounter a project like the Yellow River Bridge, you will not dare to take over.

After Yu Qingyang left the construction site, the labor manager of the tourism road project quickly approached Mr. Liang.

"Hello Mr. Liang, I am the representative of Huayu Labor Service Company in the tourism road project, my name is Chen Shulu!"

"Hello Mr. Chen!" Mr. Liang politely shook hands with Chen Shulu.

"Mr. Yu mentioned our labor company to you before, right?

This is the price list of our labor company!

There are contract labor prices and odd job prices on it, Mr. Liang will take a look at it first!" Chen Shulu didn't have anything else to do with Mr. Liang, and directly handed him the labor price list of the labor company.

Mr. Liang took the price list with the intention of looking at the situation first.

After reading it, he was stunned for a moment, and asked in disbelief: "Mr. Chen, is this price real?"

The price list handed to him by Chen Shulu was not only not as high as he thought, but about 10 percent lower than the market price.

Even the price of the commando is clearly written, and the price of the commando is only the same as the price in the labor market.

"Haha, can this be fake? These prices must be written into the labor subcontract!" Chen Shulu said with a smile.