Chapter 859: Teaching
The phrase "the strength of the people" is sometimes very true, the site was leveled and cleaned in less than two days, and then it was necessary to fill up the huge field to a height of 30 centimeters, so that the overall elevation of the site reached the standard, so the most spectacular scene appeared, 30 trucks day and night to transport the soil in the dirt yard a kilometer away, all the best soil, and then three rollers on the huge field back and forth, a week later, the site has been formed.
At this time, the site leveling has come to an end, of course, other departments have not been idle during this time, the power bureau began to set up poles from the nearby power supply stations, and lead to this side in sections, and the capacity is not enough to expand the capacity and add transformers, and the telephone bureau is the same, that is, the poles and cables.
The most workload is the Mining Bureau, they are responsible for building buildings, even if the current buildings are brick and concrete structures, but the concrete prefabricated slabs must be done, in order to catch up with the schedule, they pour concrete on the gangue mountain, and use the heat emitted by the gangue stone to speed up the condensation speed of the prefabricated slabs, which originally took more than ten days to reinforce to 100% of the concrete to reach the standard in less than five days, which is a small trick summed up by construction workers in their usual work.
Liu Lang spent the first few years after graduating from university in his previous life on the construction site, when the buildings were all frame high-rise, the integrity was very good, and the construction was relatively simple, a twenty or thirty-story building all the construction workers together did not have a hundred people, generally speaking, one floor can be raised in three or four days, and if the speed is fast, the twenty-story building can be completed in half a year.
Of course, the technology of this era is not as good as 20 years later, but fortunately, the height of the building is 20 meters, and the construction workers are as many as 400 people, they work in shifts every 200 people, and they work in shifts during the day during the day, and the searchlights are connected around in the dark, which is even brighter than the daytime.
The workers worked hard, and Song Lifeng went to the construction site every once in a while to "supervise the battle" The main building is increasing at a visible rate, a month later, the shape of the five-story building appears in the open space, the surrounding roads have also begun to be built, the blazing asphalt continues to pour on the ground, the roller rolls back and forth, and an asphalt road from the main road in the city has begun to take shape, according to this rate, in another month, the office building of the North Industries Group will be built, and the huge factory area covering an area of 500 acres will also become the third largest factory in Fucheng, second only to the open-pit mine and the Fucheng power plant.
Of course, this is not over, there will be a construction of a wall about three kilometers long, this is also a "oil and water" work, Liu Lang gave a cost of one million, which attracted the urban construction bureau and the mining bureau to continue to be filthy, and finally for the sake of fairness, a family to repair 1,500 meters, no one is more and no one is less.
This is the result of no bidding, in fact, in the capital of Shanghai such a metropolis, bidding projects have gradually become the mainstream, many urban construction companies have set up their own construction team, with the corresponding qualifications, but in Fucheng independent construction team has not, only the urban construction bureau and the mining bureau each have a team of "people" responsible for construction, generally called the infrastructure team or infrastructure department, their division of labor is very fine, there are bricklayers, rebar workers, cement workers, fitters, welders, etc., relatively speaking, it is also very professional.
In another year or two, as urban construction begins to accelerate, this infrastructure team will gradually become an independent department, with the right to develop and build independently, which is the predecessor of the real estate company.
In the previous life, the first batch of real estate developers in Fucheng were originally the leaders of the infrastructure team of the Mining Bureau or the Urban Construction Bureau, and after the business loss of the enterprise, the infrastructure team was contracted to enter the market to develop the project, and then it became a certain construction development company, and finally privatized, then it became a certain real estate company, which is the past and present life of the first generation of real estate companies.
Liu Lang paid for the construction of the other party's infrastructure team, in fact, this is the market behavior, but the other party still doesn't understand the truth, of course, there may be people who understand some, such as a captain named Hu Changshun of the infrastructure team of the Mining Bureau, this person is one of the four major developers in Fucheng after 20 years, and now he is only a young man about 30 years old.
Although Liu Lang doesn't like the other party's appearance of "tending to be inflammatory", I have to say that these people understand the charm of money faster than ordinary people, and in order to get wealth, they will do everything they can, and it is not unreasonable for them to become rich in the end, even if Liu Lang sneers at their character.
In the month after the construction began, Liu Lang still went to the site every week to take a look, he is a construction engineer himself, the construction level of the other party can be seen at a glance, obviously their construction is not a problem at all, after confirming this, he will no longer care, he has more important things to do.
In the warehouse of the railway station, Liu Lang began his own "teaching" work, his teaching work was "simple and rude", and there was a machine tool in the front, which was one of the one that Liu Lang bought back from the United States, but now it has been dismantled, as small as a screw cap, as large as a spindle more than a meter long scattered all over the place, dismantled into this way, Professor Xiong can not restore.
However, this is not a problem for Liu Lang at all, his head is equivalent to a camera and a computer, as long as these parts are not damaged, he can restore them as they are.
Of course, dismantling is not the goal, just the means, what he has to do is to tell everyone the performance and function of all the parts of this machine tool.
At this time, there were more than 50 of his students, Chen Wei came to Fucheng with the core team of Huaxia Industrial Technology, which was more than 30 people, plus more than a dozen young workers found by Professor Xiong through training in Fucheng before, these people are the core team of Liu Lang's future Huaxia Industry.
Of course, these people are far from enough, they are the first generation of disciples of Liu Lang, they must continue to train the next generation after they learn, otherwise, how many people can be taught by Liu Lang's energy alone? Besides, even if Liu Lang can say what he has learned in the most simple and easy-to-understand words, there are very few who can understand it, such as those young workers in Fucheng, most of them can't understand it, so they can only write it down first and then gradually explore it in practice.
The warehouse was very quiet, only Liu Lang was talking in front of the blackboard, more than 40 people, including Professor Xiong, sat on the stool like a primary school student and kept remembering, these knowledge is invaluable to them, and there is no need to do experiments to analyze it! Liu Lang directly told you the results, their treatment is no different from the training of those professional mechanical institutions in the United States, and even much stronger, because Liu Lang is no longer teaching the machine tool as an individual, but from the smelting of the material of the machine tool, processing, performance, A complete set of systems such as data analysis and inspection.