Chapter 1: The Mess
The makeshift simple shed was filled with smoke, and the workers were squatting there one by one, dressed in shabby clothes, and everyone's face was solemn.
I pinched my leg hard, and a sharp pain came.
Geng Daming knew that he could not be said to be a pure rebirth, he should have been reincarnated in a person who was also named Geng Daming. Geng Daming has never been married, and he has almost put all his energy into research, although he is not outstanding in all aspects, but he belongs to the kind of person who is a panacea, what kind of knowledge is at a medium level, and when he is old, he has entered the National Science and Technology Museum to work, and he has never believed in ghosts and gods.
The original owner of the body was a college student, and his father secretly did speculative business before the reform and opening up, and later saved some money, and took advantage of the speech of the southern tour, he began to do a lot of work, and I don't know how, he borrowed a large amount of money to invest in the construction of the highway.
Geng Daming now knows some of the situation, the country is carrying out five vertical and seven horizontal highway construction, there is a bid section of five kilometers of the project was actually taken by the father of the body, a large amount of money was loaned out, originally wanted to do a big job, only to find out in the construction of this section of the geological situation is very special, the collapse situation is very serious, the use of a variety of means can not solve the problem, under the rush to attack the heart of the heart of the go, there is no one in the family who can get the idea, everyone can only call Geng Daming back, what I didn't expect is that Geng Daming heard that his father owed a lot of money to the bank, frightened fainted, which is the rebirth of its own.
This becomes the boss?
Geng Daming also had a sense of unreality.
"Little boss, what should I do now?"
While Geng Daming was pondering, the voice of inquiry pulled his consciousness back.
Looking at these miscellaneous soldiers again, Geng Daming adjusted his mood and asked, "If you don't do it now, what kind of situation will it be?"
"Daming, your father has borrowed two million from the bank, if you can't pay it back......" One of the people from the village said worriedly.
"Yes, some of the mechanical equipment of the project has almost spent all the money, and now those equipment will not be sold at a high price. ”
All of a sudden, everyone started talking about each word.
"Let's go to the construction site and have a look!" Geng Daming stood up and walked outside the house.
Geng Daming's heart was a little confused, and he really didn't know what to do for a while. Geng Daming knew that the south had become a hot land, and it was the era of great work and fast development, and he had a lot to do, but as an old intellectual, Geng Daming couldn't bear to see the helpless expressions of these people.
As soon as he walked outside, Geng Daming suddenly felt that the sun was shining on his body, and the weather was extremely hot. The thatched grass was overgrown everywhere, and their construction team was in this difficult place, and a large row of linoleum houses became everyone's camp.
Sitting on the liberation car, the dirt road stretched to the front, and after a while, I came to the construction site.
"Daming, people from the General Bureau!" accompanied Geng Daming was a fellow villager named Geng Wei, and he pointed to a group of people in front of him and said.
In this era, there is no such thing as a company, and most of them are the name of a certain bureau.
The car stopped in front of the people, and when Geng Daming got out of the car, he found that the people on the other side had all looked over.
"Mr. Zhou, this is our little boss Geng Daming. Geng Wei introduced.
His eyes fell on Geng Daming's body, and the middle-aged man named Mr. Zhou looked at Geng Daming's body with some scrutinizing eyes, and then said: "I almost know the situation of your construction team, although your father is dead, the project can't be delayed, just right, while you are here, Captain Ning is also there, I will ask, if you can't do it, if you can't do it, Captain Ning and their construction team will take over." ”
"Yes, Xiao Geng, your father and I are also acquaintances, and I am also saddened by his death, but this road construction matter is related to the overall strategic situation of the country, and I feel that with your ability, it is impossible to continue to do it now, otherwise, your Uncle Ning will take over this work?"
Without Geng Wei's introduction, Geng Daming could see at a glance that this Captain Ning wanted to win this bid and squeeze his engineering team away.
Mr. Zhou frowned and looked at the collapsed area, and did not participate in the conversation. As the person in charge, he and the chief engineer below have also come to this place many times to study the solution, but there has been no good solution, which is also something that makes him uneasy.
Captain Ning looked at Mr. Zhou, and then looked at Geng Daming and said: "Xiao Geng, doing engineering is not a simple thing, if your father is here, you may be able to do it, you don't understand anything, it's better for your Uncle Ning to take over, you see, the technicians invited by your father have come to me, and you can't find a technician for a while!"
Seeing Captain Ning's smug appearance, and thinking of the fact that his team was really poached by him for a few skilled people, Geng Daming knew that he had already premeditated his behavior.
Geng Daming didn't go to talk to Captain Ning, but walked to Mr. Zhou's side and said, "Mr. Zhou, I want to report to you about the way this slope collapsed." ”
"Hmm. ”
Mr. Zhou looked at Geng Daming curiously.
In fact, in view of the situation of Geng Daming's construction team, the purpose of Mr. Zhou's arrival this time is very clear, that is, he plans to change the construction team, after all, the progress of the construction of this road is related to the progress of the entire project. As for how to deal with the construction problem here, they also have a new idea, that is, to modify the construction plan, and if it doesn't work, they will increase the cost and flatten the entire mountain.
Pointing to the place of collapse, Geng Daming said: "Mr. Zhou, please see, the situation of this section is complicated, I know that the means to deal with the collapse of the slope are nothing more than slope cutting and unloading, slope footing, slope protection, anti-slide piles, anchors, prestressed anchor cables, anchor holes, drainage, retaining walls, comprehensive reinforcement methods and other methods, but unfortunately because of various reasons, the effect is not too ideal." ”
Mr. Zhou's eyes lit up at this time, thinking that this young man really knew something, and he wanted to hear if he had a way.
Seeing the change in Mr. Zhou's expression, Geng Daming smiled secretly, what he wanted to come up with was much more advanced than some of their current methods.
"Mr. Zhou, it is estimated that the method you want to adopt is nothing more than stripping the slope, if that is the case, not to mention the increased cost, you can know from the situation of the entire mountain here, even if it is completed, there are still many problems in the future, right?"
"What can you do?" Mr. Zhou finally asked.
"Mr. Zhou, I plan to use the prestressed anchor cable method to strengthen the slope. ”
"What?"
Mr. Zhou looked at Geng Daming puzzled, although he was also an expert in this area, he didn't quite understand what Geng Daming said.
"Mr. Zhou, the prestressed anchor cable refers to the cable-like support that adopts the prestressed method to anchor the anchor cable inside the rock mass, and is used to strengthen the slope method, the anchor cable is anchored into the rock body by the anchor head through the hole of the weak structural plane of the rock mass, and the sliding body is connected with the stable rock layer, so as to change the stress state of the slope rock mass and improve the integrity and strength of the unstable rock mass of the slope. Of course, during the construction of prestressed anchor cables, special tensioning devices and tools are required.
The anchor cable structure is generally composed of three parts: the amplitude anchor head, the anchor cable body and the outer anchor head.
The inner anchor head, also known as the anchor section or anchor root, is the anchor cable anchored in the rock body to provide prestressed foundation, according to its structural form is divided into mechanical and cemented two categories, cemented and divided into mortar cementation and resin cementation, mortar is divided into secondary grouting and primary grouting type. The outer anchor head......, also known as the external anchor section, is the part of the anchor cable to provide tension tonnage and locking, and its types include anchor plug type, threaded type, reinforced concrete cylindrical anchor pier type, pier head anchor type and steel frame type, etc.;
As Geng Daming said, while drawing a construction drawing on the ground, Mr. Zhou's eyes lit up more and more at this new construction method, and he knew that this was a new process and an effective way to solve the collapse of the slope.
At this time, Mr. Zhou looked farther and was excited, if he could use this method to construct, would he also be able to win the award?
"Okay, good!" Mr. Zhou even said a few good words, and his eyes lit up when he looked at Geng Daming.