It can be seen from here how big the site is, but also, the land here is relatively cheap, and in addition, this place used to be a reed swing, but then there was no water, so it became a muck pit, and after the muck was filled, it looked like a flat land, but in fact, it could not grow crops at all.

Bidding farewell to the uncle who watched the gate, Qin Shi Huang came to the row of houses, it turned out that this was the project department, and put the project department outside, if it was really strange enough, people who didn't know really couldn't find it.

After coming, I didn't see anyone walking here, but there was a car parked outside, the car was a Mercedes-Benz, it should be someone.

Qin Shi Huang looked from room to room, but there was no one, and just when Qin Shi Huang thought that there was really no one, an office door opened, and a middle-aged man asked, "Who are you looking for?"

"Hello, I thought there was no one here! Qin Shi Huang hurriedly handed over a business card.

The middle-aged man took it and looked at it and asked, "Are you doing engineering?"

"Yes, I'm an engineer, my name is Qin Shi Huang. ”

"Hello, I am the person in charge of Party A here, and my surname is Gong. ”

"Hello Mr. Gong. ”

He is talking about the person in charge of Party A, which means that he has not yet found a construction company, but also, the villas built here are not for sale, but for mobile high-rise buildings, that is, they live by themselves.

The mobile side may want to finish the preliminary work, that is, according to their own requirements, first get the place they want, and then find a construction company to build it, no wonder they have to advance money.

"I'm not the boss, I'm just the person in charge here, and I'm overseeing the project of digging the lake and building mountains. ”

Still have to supervise, Qin Shi Huang frowned, originally he was going to take the project next, and then let Qianbian do it, it seems that it is impossible now, because someone is here to supervise.

If this is the case, this project can only be done according to the ordinary project, that is, to do it in a real way, so you know that you have to advance a lot of money, first of all, the engineering equipment, whether it is rented or sold, will be a lot of money.

"Mr. Gong, isn't it just to dig a lake and build a mountain! Why do you need supervision?"

"Come, let's talk inside. While the two of them walked inside, the Gong general manager said: "It doesn't matter if you dig the lake, as long as you follow the drawings, but this orogen is different." ”

"What's different, isn't it just a mound of earth from digging a lake and making a mountain? ”

After the two of them came to the office, the palace chief poured Qin Shi Huang a glass of water from the water dispenser and said: "That's so simple, this is a dirt mountain, in order to prevent landslides or landslides, steel beams will be put in the entire mountain at that time." ”

"It's so troublesome. ”

"Of course, because all the villas are built on the hill, you say you can do it without trouble. ”

"Damn, it's really money to burn, since it's so rich, why do you want to advance money. Qin Shi Huang said in his heart, but he couldn't say this, who knows what people think, besides, if it wasn't for the need to advance funds, this job would not be his turn to do it.

"Mr. Gong, digging a lake and building a mountain, these can be said to be two projects, I don't know if the price is ......"

"Yes, it's two projects, but we've hired professionals for the orogeny, and if you want to do this project, you just need to dig out the lake and transport the soil over. ”

"Mr. Gong, I want to ask, is there also an advance over there?"

"That's not it, it's relatively simple over there, and a few bulldozers to push the soil you transported to where it is needed, and then a few rollers to compaction, and then a professional construction team to play the steel beams, you don't need a few people. ”

"Damn. ”

Ma Dan, according to what the palace general said, in addition to the steel beams, it really doesn't cost much, the most expensive place is slotting, and the most expensive place for slotting is, of course, the freight, this money has to be paid out.

"What? Mr. Qin is interested in this project?"

"I'm interested, but you have a bit of a lot of money to advance. ”

Hearing Qin Shi Huang say this, the palace chief smiled bitterly and said: "No way, before it meets expectations, the top will not allocate money, if you want the top to allocate the money, then you have to come up with a place that satisfies the top, and this mountain-building and digging lake is the place that can satisfy the top." ”

As soon as the palace manager said this, Qin Shi Huang seemed to understand something, and it is estimated that there are different voices at the top of the mobile now, there must be people who think that the environment here is not good, and the geographical location is relatively remote, don't talk about others, even if Qin Shi Huang sees this place, he will not agree.

No way, it's too remote here, the most important thing is the environment, there is nothing around, it can be said that except for the countryside is the countryside, such a place, who would come to live here.

So some people think of digging a lake here to build a mountain, and create a place with beautiful scenery, mountains and rivers by themselves, and at that time, it is estimated that no one will say anything anymore, and the project can be passed, and the money will of course be allocated.

"Mr. Gong, I want to ask, how much do you pay for a cubic meter of slotting?"

"Five bucks. ”

"Five yuan, Mr. Gong, are you kidding, five yuan is enough for something. ”

"Qin, I'll call you Mr. Qin, five yuan is already a lot, that is, you do it in the venue, and you don't go out of the gate, the farthest place is two or three kilometers, five yuan a side, this is the result of many discussions. ”

"Mr. Gong, I understand why no one came to pick up your project, you just think about it, but have you thought about it, the starting price of the car is one hundred, let's calculate it according to one hundred, one car pulls thirty squares, and the freight alone is three yuan and three. ”

Speaking of this, Qin Shi Huang took a sip of water and continued: "There is also the rental of an excavator, an excavator with a five-square bucket, a Taiwanese class is two thousand eight, according to five minutes to load a car, an hour is twelve cars, a Taiwanese class is ninety-six cars, and ninety-six cars are how many square soil, two thousand eight hundred square more, which is equivalent to saying that this square of soil is another dollar." ”

If the vehicle breaks down, or the excavator driver grinds a little, the price may be higher, and there is no money to be made at all! If you remove manpower and material resources, it is likely to lose money, even if you are lucky, everything is particularly smooth, and in the end it is still equal to doing it in vain. ”

Qin Shi Huang shook his head after speaking, indicating that this job could not be done.

Hearing Qin Shi Huang say this, this palace general must be a little confused, he really doesn't know this, the price of five yuan is only heard from others, as for the many arguments he said, he just listened to the statements of a few people.