Chapter 109 Contracted Cattle Farm Construction

Seeing Qin Shi Huang coming in, Xiao Xing hurriedly stood up and said to Qin Shi Huang: "Boss, this is the cattle boss, that is, he wants to build a cattle farm." ”

"Hello Mr. Niu. ”

"Hello Mr. Qin. ”

The two shook hands, and Qin Shi Huang turned back to Xiao Xing and said, "You go and get busy, just leave it to me here." ”

"Good boss. ”

Of course, Xiao Xing is not called the cattle boss because he built a cattle farm, but the surname of the family is Niu, and the cattle boss raises cattle, which can be said in any way, and it is okay to say that he is a cattle boss.

Qin Shi Huang invited Boss Niu to sit down, and then personally poured him a cup of tea, then sat down and asked, "Boss Niu, I don't know where your cattle farm is built?"

"Over there in Huluhe Village. ”

"Huluhe Village?" Qin Shi Huang frowned, because he had no impression of this place at all, but also, the imperial capital was so big, especially in the suburbs, it was even bigger, and the name of a village, of course Qin Shi Huang could not know.

"It's right next to Xiaotangshan Town, next to Shunsha Road. ”

As soon as Boss Niu said this, Qin Shi Huang had a little impression, Shunsha Road, as the name suggests, is a road from Yishun District to Shahe, that road Qin Shi Huang has walked many times, although he still doesn't know where Huluhe Village is, but the general location has been known.

"I don't know how big this cattle farm is?"

"Sixty acres of land, plus a cement road leading to the cattle farm, about two kilometers away. ”

Sixty acres of cattle farm, this is already very large, one acre of land is 667 square meters, sixty acres of land is about 40,000 square meters, such a large cattle farm, how many cattle to raise, but this seems to have nothing to do with yourself.

Although this has nothing to do with Qin Shi Huang, but to build such a large cattle farm, it takes a lot of money, not to mention the cattle farm, just the two-kilometer cement road, it is estimated that there are not millions of people who can't get down.

"Mr. Niu, you used to run a cattle farm?"

"Yes, my previous cattle farm was on the Qinghe side, but the land rent over there has arrived, so I have to move to Huluhe Village. ”

As soon as Boss Niu said this, Qin Shihuang understood a little, too, what is the price of the land on the Qinghe side, it is estimated that there is no 100,000 yuan a year for an acre of land, don't even think about it, and the land on the side of Xiaotangshan, it is estimated that 10,000 yuan a year of an acre of land cannot be used.

Even if it costs 10 million to build this cattle farm, it is only two years' rent on the Qinghe side, or even less than two years' rent, and renting 60 acres of land on the Xiaotangshan side will be four or five hundred thousand yuan a year, which is too much difference.

Besides, a cattle farm is built in the same place, built on the side of the Qinghe, in addition to being closer to the city, many places are not as good as Xiaotangshan, at least here is close to the countryside, and it is good to buy good luck with feed or something.

"Mr. Niu, do you have any drawings for the cattle farm? Let me see it. ”

"Yes, I brought them all. "Boss Niu has a paper tube in the countryside, opens one end, takes out a few pieces of paper from it and hands it to Qin Shi Huang.

Qin Shi Huang took it and took a look, the drawing is very simple, it is a row of factories, of course, there are some differences with the factory, too, how can the place where cattle are raised be at a glance with the factory, but it is almost the same.

The other is the yard, according to the drawings, the yard is to be paved with cement pavement.

"Mr. Niu, do you still have a big car here?" I saw that the concrete road should be built six meters wide, and it is said that it does not need to be so wide at all, unless it is too large.

"Yes, my cattle farm, at most, has two or three thousand cows, and the daily feed is an astronomical amount, of course, through large carts, and in addition, there are carts pulling milk in and out every day. ”

"Well, I see. ”

"Mr. Qin, I don't know how much it will cost me to build this cattle farm?"

"Mr. Niu, your cement road is two kilometers long, that is, two kilometers, according to six meters wide, that is, 12,000 square meters, and you have to pass a big car here, a cement road with a thickness of 20 centimeters is not good at all, at least 30 centimeters thick, otherwise after a period of time, the road may be finished. ”

"Yes, yes, I know that. ”

"In addition, looking at the drawings, this was originally a dirt road, which means that there is no old foundation, so in this case, the foundation must be filled with sand and stones, and at least 50 centimeters thick, which is also a sum of money. ”

"Mr. Qin, you don't need to tell me about this, just say how much it costs to build this place. ”

"No, no, Mr. Niu, you must also know this, otherwise you may say that I want you too high, the road will not be said, talk about the factory, if all the cement is paved, although it is not as thick as the road paving, but it can not be too thin, the place where the car is paved with a layer of bricks, and the top is paved with ten centimeters, but the place of the car, the bricks are paved below, and three centimeters are enough to be paved above. ”

"Well, that's it, it's all on these drawings. ”

"Yes, it's all on the drawings. Qin Shi Huang nodded.

"How much do you count?"

"Mr. Niu, contractor or contractor or contractor?"

"Of course, it's all-inclusive, my cattle farm here is busy, I don't have time to purchase, besides, many things are not purchased first, but also need to be used and bought now, so I will hand over all the projects to you. ”

"Well, in that case, I'll give you the price. ”

The price of concrete on one side is 45 square meters in the imperial capital, the road is 6 meters wide, and it takes almost two sides to repair one meter, so it is calculated according to two sides, two thousand meters, which is 4,000 square meters, which is 1.8 million.

Or is it half a meter thick sand and gravel below, on average, according to one hundred per side, six meters wide, it takes three parties to repair one meter, and two thousand meters is six thousand square meters, that is, 600,000.

These are just the cost, and labor, although Qin Shi Huang is using a machine, but one side according to the labor of fifty yuan is not much, you must know that you have to dig, but also compact, but also to pave the road, in this way, six meters wide and two kilometers long, is 12,000 square meters, 600,000 labor.

If calculated in this way, the light path will cost three million.

In addition, in the factory, the cattle factory does not need to be built like a house, the space is relatively high, and a lot of steel is needed, so although the price is not as expensive as building a house, it is not much different.

How can a square meter cost 600 yuan, he built a total of 20,000 square meters of factory buildings, which is 12 million, the other half of the area does not build houses, but paves the ground with cement, so calculated, it is normal to pay 100 yuan per square meter, 20,000 square meters, is 2 million.

In addition, there is the courtyard wall, the courtyard wall is 800 meters long, of course, the wall of the cattle farm can not be built too thin, otherwise the cow roof will collapse, no matter what, it will also have 49 walls, in this way, one square meter is 256 bricks.

。。。。。。

PS: Asking for a recommendation ticket, thank you.