Chapter 464: Ganzhou, Late Spring? (Ask for Recommendation)
Cao Gong received Li Dongwen's notice and rushed to Shuofang Kubu non-stop.
The location company has tasted the sweetness of wind power, which is comparable to hydropower, the cost of power generation is almost none, the cost is equipment maintenance and daily maintenance, and the money is all made by the strong wind, hulaladi.
"This place is too remote, taxis don't come, I came by tractor......" Cao Gong complained as soon as they met.
Li Dongwen looked at this guy with a big waist and a round waist, and said: "Zhongnan * Hai is not biased, let you build a wind power plant? Some of them are good to eat, and they also pick fat and thin ......."
Cao Gong hurriedly smiled and said, "I'll just talk about it...... Let's go up the hill and have a look......"
The road up the mountain had not yet been built, and several people rode into the mountain.
Coming to the high slope, Li Dongwen raised his hand and said, "That's it." ”
"This wind doesn't seem to be enough, right?" Cao Gong was a little puzzled.
Li Dongwen: "If you don't want to do it, we will build a self-provided power plant, a small factory of 100,000 kilowatts, which is enough for us." If we work together and build a Liangzhou scale, it will not be a problem. ”
"This is the border of Mongolian Province, not Gan Province?"
"Is the power plant in Liangzhou on the border of Gan Province?"
That's right. The power plant in Liangzhou, although close to Liangzhou, is also on the boundary of Renjiameng Province.
"This investment, but five or six hundred million, how to do it?"
"It's the same old way. However, the construction speed must be fast, at least the first phase must be completed first, and we are waiting for electricity here. ”
Cao Gong complained again: "It's another big project." I can't be the master alone, I have to report to the company, and the company has to report to the province...... Within the system, things are not as flexible as your private ......"
Li Dongwen: "We can't wait. Either we'll do it ourselves first, and then you can buy it. I'll give you half a month to think about it, is that enough?"
Cao Gong was depressed. For such a large project, with an investment of five or six hundred million yuan, half a month is enough, and the process of project approval cannot be completed at all.
Li Dongwen commanded Cao Gong's army again: "Ganzhou, I told you last year, but you have not replied." Now that we're ready to build our own wind farm, we're not waiting for you. ”
Cao Gong felt depressed again. Geopower is a state-owned enterprise, and large projects have to carry out risk assessment, and the assessment will delay the time.
"I'll go back right away and report back to the company. ”
Cao Gong left in a hurry.
Li Dongwen also left, and he went straight to Ganzhou. Since it is said that Ganzhou wants to build a power plant, it cannot be used to fire empty guns, and this power plant must be built.
March 20th. Equinox.
Li Dongwen came to Ganzhou.
The vernal equinox, theoretically speaking, is the dividing line between spring and summer, and after the vernal equinox, it is summer. However, in Ganzhou, what does not exist, it is still a cold and snowy winter, and there is no meaning of spring at all, let alone summer.
The ten-person team of Chu Dadi has been expanded to 100 people, and they are working together in the iron mine of Anping and Qiao Shan and their mines.
Not long after the iron ore mine was built, Johnson has been staring at the mine, and now it has begun to make money, basically without mineral processing, a truckload of iron ore, directly sold to the nearby steel plant.
Li Dongwen's arrival, Qiao Shan was very happy, and Chu Dadi was even happier.
Qiao Shan is happy because in this place, it is not easy to find a friend who can drink and chat together, he is the boss, and it is inconvenient to get too close to his subordinates, eating and drinking together every day, it is easy to lose his majesty, which is not conducive to management. made Qiao Shan drink and chat with Chu Dadi of Peach Blossom Fairy Company every day.
Chu Dadi is happy because the boss has finally come to pay attention to Ganzhou, which is inspiring. Another reason is that I am finally free, I don't have to drink and chat with Qiao Shan anymore, and there is a boss on top.
Li Dongwen's reception banquet was a mutton hot pot, with only 5 people, occupying a large private room in the mine's canteen. On the peach blossom fairy side are Li Dongwen, Zhou Daoping and Chu Dadi, Qiao Shan brought a mine manager, one of his cousins, Qiao Hai.
The protagonists are Li Dongwen and Qiao Shan, and the others are foils.
Qiao Shan: "You can be regarded as coming, we can be regarded as seeing our relatives in the motherland......"
Li Dongwen: "Is it such an exaggeration?"
Qiao Shan: "It's not an exaggeration, it's too hard, it's all a bunch of rough old men, you can't even see a girl, you can count it as ......"
Li Dongwen: "Get out of the way...... Let's get down to business, the wind farm is ready to start, have you decided to invest?"
Qiao Shan: "Power plant, of course, we have to invest. However, this cold and snowy land can't start work......"
Li Dongwen: "Ready to start construction, it will be civilized immediately......"
……
Li Dongwen is here, and there will be no suspense.
The temperature in Yu County, Ganzhou rose rapidly, accumulated a winter's ice and snow, melted uproar, the ground soon revealed a blue color, the vegetation recovery speed was amazing, weeds drilled out, wildflowers bloomed, spring in Ganzhou, finally came.
Between the high mountains, many large and small lakes have been formed, overflowing, bubbling and flowing, converging into streams and going downward.
This is a plateau, three or four thousand meters above sea level, and it is not suitable for large-scale cultivation and farming. Chu Dadi decided to plant trees and raise chickens this year, and then consider grazing sheep next year, after all, the vegetation here is still very fragile and can't withstand too many sheep to gnaw.
The lake is really a good thing, and the fish and ducks are all good projects.
Chu Dadi began to recruit troops on a large scale, encircling lakes, building roads, repairing chickens, ducks and geese houses, building simple staff dormitories, planning hotels, buildings, and dormitory buildings......
Xie Anping also rushed over from three sides to prepare for the construction of a wind power plant. In this wind farm, Taohuaxian accounts for half of the shares, but there is no need to pay, and the money is paid by Anping Mining.
The planned power plant is 1 million kilowatt hours, with an investment budget of 5 billion yuan. Xie Anping and Qiao Shan, of course, are playing loans, and with their businesses, many banks are chasing them to lend money.
The richer you are, the more the bank gives you a loan, the less money you have, the more the bank avoids you, no matter how much you want to get a loan.
Xie Anping and Qiao Shan reported that the mine had its own power plant, and it was a wind power plant, which belonged to the clean energy encouraged and supported by the state, and the procedures were quickly approved.
The wind power equipment factory is located in Tongcheng, Gansu Province, and soon completed the project signing and began construction.
When Li Dongwen said that a wind power plant of the same scale would be built in Shuofang soon, the wind power equipment factory said it was very difficult. Our production capacity can't keep up, this year can complete this project, it's already very good, your Shuofang power plant, can you wait until next year?
Next year, the daylilies will be cold.
Can a large vegetable garden of tens of thousands of people, waiting for electricity, wait for you for a year?
Li Dongwen put down his words: If you can't do it, we will find another company, and you are not the only wind power equipment factory in the country?
The wind power equipment factory does not want to lose the big customer of Taohuaxian, so it came up with a compromise plan: Shuofang Power Plant, you are in a hurry to use electricity, we will build it in stages, the first phase is 100,000 kilowatts, we will speed up the speed, and strive to complete it in half a year, so that you can use electricity as soon as possible.
The second phase, which we guarantee to be completed by the end of next year at the latest.
Li Dongwen pondered for a while, the first phase of 100,000 kilowatts, there are no large industrial and mining enterprises, and the electricity consumption of a small county town is enough, so let's do it first.
Li Dongwen was still busy in Ganzhou, and suddenly received a shocking good news!
Reading is exciting, reading is wonderful!
( = )