Chapter 268: Self-built Power Plant (Ask for Recommendation)
Li Dongwen hung up the phone and summoned Zhang Junru's working group. Zhang Junru himself was busy with the listing operation of several companies with his team, and he didn't have time to come to Liangzhou, so he sent a few young people over.
Li Dongwen explained the matter of running the power plant, "You carefully study the laws and policies of the mainland, how can we build the power plant and come up with a plan as soon as possible." ”
A new task was assigned to a major client, and the team immediately took action.
As for the power generation, the government still has some reasoning. For example, self-owned power supply is allowed, large hotels and shopping malls have backup generator sets, diesel burning, the cost is too high, can only be used for emergency use, and no one can afford to use it for a long time.
This type of generator has been marketed and can be sold publicly.
There is also new energy power generation, which is also encouraged by the government, such as wind power, such as solar power generation. It's okay to install a row of solar photovoltaic circuit panels on the roof of your home and generate your own electricity.
Large enterprises and self-supplied power plants used to exist, but now they are gradually rare, mainly because they are uneconomical, costly, and polluting.
Especially for thermal power, the government still has clear requirements, large factories can be built, small thermal power plants are not allowed to be built, and they are gradually banned.
Li Dongwen has not been idle these days, he is busy "rebuilding" the lakes in the two townships.
A heavy snowfall fell, leaving hundreds of lakes, large and small. The smallest is only the size of a basketball court, one meter deep, and you can see the bottom at a glance, and the largest is four or five kilometers in circumference, dozens of meters deep.
Li Dongwen was not very satisfied with the radishes and cabbages planted by Zhang Hongxia, so he collected some seeds of flowers and plants from the cave and sprinkled some in the ground.
On this day, as soon as Li Dongwen came back from the construction site, he saw Xie Anping coming to Wu'an and brought someone with him.
Xie Anping came to Wu'an for the Taohuaxian Company to run a power plant. A few days ago, Li Dongwen was on the phone, and he hung up halfway through his words, which made Xie Anping a little worried.
Although he poured cold water on the Taohuaxian Power Plant, he was still worried that Li Dongwen would not give up and would be reckless, so he ran over in person.
"This is Cao Gong of the Sanqin Provincial Electric Power Company, and he is an expert in running power plants. Xie Anping introduced.
Li Dongwen shook hands with this Cao Gong and said, "Please come in and sit." ”
Cao Gongsi is literate, wearing a pair of gold-wire glasses, and looks very learned.
After entering the house and taking a seat, Xie Anping said: "Cao Gong is the chief engineer of the provincial power company, with two power plants under his jurisdiction, and now he is preparing to build a third one. You build a power plant, and let Cao Gong help you with your staff. ”
Li Dongwen: "Trouble Cao Gong, I thank you in advance." ”
Cao Gong pushed his glasses and said, "You're welcome." I heard Boss Xie say, you want to build a power plant, for your own use, right?"
Li Dongwen nodded.
Cao Gong continued: "It's just for your own use, it's no problem. However, the state has regulations that thermal power plants, units with a single unit of less than 100,000 kilowatts, are no longer approved, and the power plant is required to be at least double units, that is, at least one 200,000 kilowatt power plant must be built. ”
Cao Gong pushed his glasses again, and then said: "The 200,000-kilowatt power plant is enough for the entire Wu'an County, and it can't even be used up." But electricity, unlike other products, can be stored, and the electricity produced by your power plant is difficult to store, and you can't use it yourself, but it is very troublesome to sell. ”
Li Dongwen asked, "What's the troublesome method?"
Cao Gong said: "The current power supply adopts the separation of power plant and grid, and the separation of production and marketing. The electricity produced by our power plant is also sold to the power supply bureau, that is, the power grid, and now the power grid is divided into two, one in the north and one in the south. Almost all the power transmission and transformation line equipment and power supply lines in the country are in the hands of these two companies. ”
"If these two companies don't buy your electricity, your electricity will go to waste. They are monopolies, and the price they give you will be very low, and even we are saving electricity, but we are also being exploited by them, not to mention private power plants. ”
Li Dongwen asked: "They are so domineering, why don't you build your own power grid?"
Cao Gong glanced at Li Dongwen and said, "Building a power grid is not easy to talk about! The cost is too high......
Li Dongwen asked: "Except to sell it to them, is there no solution?"
Cao Gong thought for a while and said: "Unless you have a large electricity user near here, who can consume your surplus electricity, pull a special line and sell it to them cheaper." ”
Li Dongwen asked again: "Which are the big electricity consumers?"
Cao Gong: "As far as I know, there are no big electricity consumers in Liangzhou. Electrolytic aluminum plants, metal smelters, special steel mills, large machinery manufacturing plants, large cement plants, these are all large electricity consumers, but many old enterprises have their own power plants. ”
The hope of spring had just been dreamed of, and it was met with snow and frost.
Li Dongwen's mood at the moment is like making things worse, and it is even colder for a while.
Cao Gong didn't know why, so he added a knife to Li Dongwen's heart, and continued: "It will take at least two to three years to build a 200,000-kilowatt power plant, and if the environmental protection standards are met, the investment will need more than one billion." ”
One billion, money is not a big problem, the key is that it will only be possible to generate electricity after two or three years, and Li Dongwen really can't afford to wait.
It seems that this power plant can only be discussed in the long run, and what needs to be solved at the moment is the power supply problem.
Xie Anping saw Li Dongwen frowning, and quickly changed the topic: "Why don't you come to the three sides to open up the wasteland, there is no shortage of electricity there." ”
Li Dongwen glanced at them and said, "There is really no shortage of electricity, and there is no need for Cao Gong's power company to build a power plant." ”
Cao Gong said: "In recent years, the national economy has continued to improve, and the lack of power supply across the country has gradually emerged, and there are already signs of power shortage, so we have accelerated the construction of power plants." We have received information from the power system, you also have several power plants under construction in Gansu Province, the Chengzhou power plant will be put into operation this year, and the power plant in the provincial capital of Lanzhou has been approved and is raising funds. ”
Li Dongwen suddenly remembered that last year's investment project in the province seemed to have a power plant.
In this way, the power supply is really a problem. Peach Blossom Fairy Company wants to develop, there is no electricity, then it will develop a yarn. Do you want to go back to the past, working at sunrise and resting at sunset?
Cao Gong pushed his glasses again and said to Li Dongwen: "Boss Li, our power company is raising funds, and the company is striving to go public within two years, are you interested in investing some capital and occupying some shares?"
When Li Dongwen heard this, he was happy and said: "Is it popular to go public this year? Our company is operating the listing, and Boss Xie is also operating the listing, and you are also doing this?"
Cao Gong said: "We are a state-owned enterprise, a holding company of the Provincial State-owned Assets Supervision and Administration Commission, of course, we are going to go public, but we are now short of money." ”
Li Dongwen: "If you are short of money, you can find a bank." ”
Cao Gong said: "I have found everything, and the loan amount has long been used up." ”
Li Dongwen: "Don't be in a hurry to invest in this matter, when I have time one day, I will go to your power plant to have a look before deciding." ”
Li Dongwen didn't say anything to death, and left Cao Gong a little thought.
Xie Anping remembered one more thing and said, "Master Li, you are too godly, we dug in the coal mine for two days according to your instructions, and dug out a mountain spring!"