Chapter 30 LV9
Opened the zipper, released the big steel cannon that still insisted, and a clear spring went straight into the toilet, Jiang Lang couldn't cry or laugh, after the attribute was improved, it seemed that he really needed a woman to vent his anger, and fortunately, he had been basically wearing loose pants all along, and if he was tight, he must not expose the fact that he has such a big top?
Open the system, it has been upgraded to LV9, and sure enough, as I guessed, now the amount of money per minute has been increased to 500 yuan, and the experience value needs 500 million to upgrade again, and the rest of the attributes have not changed.
Player's primary industry: Mining (Shuangquan Coal Mine).
Current interest-free loan balance: 80 million (50 million loaned), 5% annual interest loan amount: 2 billion (300 million used).
Sure enough, the loan amount also increased by 500 million for himself again.
Player benefits: Daily idle money brushing is increased to 500 yuan per minute, there is the right to mobilize the amount of money brushing within 9 weeks, more goods are unlocked in the unlimited mall, and players can obtain experience points by spending in-game money or their own money to complete various tasks.
Holiday Crit: During the holidays, players can get 15-20 times the amount of money they can receive.
Task 1: How can a man not have his own property? Please complete the first set of buildings (with a construction area greater than 15,000 square meters) as soon as possible.
Task 2: Luxury cars, yachts, and private jets can be called the standard for men, please get together three means of transportation as soon as possible (the price is more than 80 million yuan), and the system will reward the same amount of money (repeatable) for each piece of ownership that the player has.
The two tasks have also not changed, but the requirements have increased, but this Jiang Lang can only wait slowly, it just so happens that there is no other arrangement today, Jiang Lang plans to buy a good car to play.
Downstairs from the middle of the north wall of the living room to open the door to the parents' yard, walked in directly from the house, turned around and found nothing abnormal, the self who should have cleaned up had already received his own upstairs, furniture, household appliances Jiang Lang did not plan to move.
After locking the door, Jiang Lang drove to the mine, gave the key to Zhang Ying, and asked her to choose a room to live in, and at the same time told her that Jiang Guangjing's five girls would come over today, and the registered capital was increased from the original 3.2 million to 500 million, anyway, there is no need to really pay for it, as long as the account reaches this number within the specified time limit, the original registered capital was too small.
Drove directly to Quandu, killed Ford, usually in the countryside, Jiang Lang still wants an SUV or pickup, he originally wanted to buy F650, but this car can only be hung with a yellow card in China, Jiang Lang only C1 can not drive, simply get up and leave.
To the luxury car exchange, turned around and got down, at a glance fell in love with the Murcielago LP640, this is an orange car, hanging the East China Sea license plate, the luxury car exchange can be used for annual inspection, the price is 6 million, two years unlimited company maintenance and warranty, although the car is low, but the SUV model he didn't see the like, and he wanted to spend money, so he simply bought one.
To Jiang Lang's surprise, he didn't need to pay for the car at all, and the system reminded him that it had been transferred to the dealer's account, Jiang Lang was a little surprised and asked the other party to check it, and sure enough, there was already a sum of 6 million in the account. After getting acquainted with it, Jiang Lang asked the luxury car to drive his Cayenne volcanic ash back for him, and then drove the car that he had just bought and ran more than 700 kilometers onto the highway.
At a high speed of 100 kilometers, the Murcielago LP640 roared and continued to intersperse and got off from Shuangquan in less than 30 minutes, which made Jiang Lang sigh Fortunately, there were still few cameras at this time, otherwise he would not dare to run at all, and the ticket alone was enough to drink a pot of himself.
Entering the road leading to the village, I saw that the construction personnel of the Datong Highway Company had begun to widen the roadbed today, and at the same time, there were some cars carrying fruit trees and fruits to transport outward, and the road was also a little potholed, Jiang Lang had to drive back home slowly and cautiously and parked in the garage.
This car usually can't be driven, mainly because the road is not good, so I can only wait for the road to be repaired next year.
After buying a car, he didn't use his own money, Jiang Lang felt a little unpleasant, so he simply opened the system mall, looked around, and finally spent 10 million to buy a "World Language Proficiency Capsule", only to find that it would take a week for this thing to gradually appear.
On the 12th, Shuangquan Village officially switched the power of Shuangquan Coal Mine, and today, Jiang Lang received an official invitation letter from the Provincial Coal Industry Bureau, inviting Shuangquan Coal Mine to participate in the coal trade fair held in Quandu on October 28-29.
No. 15, Zhang Linxiang and others came again, Jiang Lang and the third uncle, the second uncle read the design drawings, quite satisfied, the office building is designed in accordance with the requirements of Jiang Lang frame structure, eight floors of construction area of 18,860 square meters, in order to be able to see the situation of the freight yard more intuitively, so in the end it is still designed from the south to the north, fortunately, the place is enough, and there is a distance of more than 50 meters from the main mining equipment, and it does not affect.
There is also a three-storey staff dormitory and canteen complex next to it, the entire office area is planned quite beautifully, and there are also many buildings in the freight yard, a large area of tree planting, functional areas divided according to the color of the lane, etc., the design is quite good-looking.
The total quotation is 230 million, excluding the part of road repair and platform freight yard, but it contains its own facilities and machinery, which really makes Jiang Lang admire, originally he still wanted to purchase loaders, but the contract has included 10 20-ton loaders, 10 automatic coal loaders, 10 mobile loaders, which can fully meet the loading of coal to dozens of trucks at the same time.
It is equivalent to that from now on Jiang Lang in addition to recruiting people, the rest does not have to worry about him at all, Jiang Lang's favorite is this, Jiang Lang let the second uncle and the third uncle follow together to learn while working, and at the same time let him arrange 30 people, including Jiang Guangning, to learn loader driving, funded by Shuangquan Coal Mine.
After Jiang Lang officially signed the general contract, he notified the finance to pay 50 million yuan for the start of construction, and invited Mr. Zhang and his entourage to eat a big pot of chicken at noon.
"Director Jiang, you know that the Caozhuang Coal Mine has stopped production, right?"
"Ah, when is it?" At the dinner table, Jiang Lang said with some surprise, he really didn't know, because he hadn't paid attention to the situation of the coal mine in the next city in the past few days.
"Just a few days ago, the Coal Bureau went down to the mine to check, and announced that the coal energy on their side has been depleted, but it has been more than 20 years, and the depletion is normal. Not only them, but all four of their coal mines have stopped, and it can only be said that there are still big discrepancies in the original exploration data. ”
Jiang Lang felt sorry for them on his lips, but he snickered in his heart, isn't it normal for them to dry up, because all their coal has gathered under their feet.
For example, the heads of various departments, etc., suddenly couldn't help but hurriedly say to the second and third uncles: "Third uncle, second uncle, you take the time to go over and recruit back a few department heads who need technical strength, and the talent can't be wasted."
At the beginning of this month, we have gradually become regular, the capital increase of Shuangquan Coal Mine can be completed before the end of this month, and we will give all employees in accordance with national regulations in the future, and the five insurances and one housing fund are also paid, but other people still try to meet the needs of our village first. ”