Enclosure (9) Application materials for new power stations
Dear Heads of Water Conservancy Authorities,
Hello!
My name is Yao Xinliang (screen name: Chang Shouyuan) male, Han nationality, 49 years old. He lives in Wuxing Village, Fengyuan Town, Linwei District, Weinan City, Shaanxi Province. Specially appointed technician of Shaanxi Liuweike Industry and Trade Company. Amateur writer and author of the novel <> At present, the book has been published and distributed through >> <
Although I am an amateur writer, I have a wide range of interests and hobbies since childhood, and I am good at innovative research. Often post something online with a unique insight. When the proposal was published online, it immediately attracted the interest of a number of strategic investors. At present, I have contacted a cooperative unit. However, due to the large number of tasks and difficulties since the implementation of the project, there were many difficulties. Therefore, I send a letter to your office to communicate first. It is hoped that the approval and support of the hydropower authorities will be obtained, and the dispatch of personnel to guide the implementation is welcome.
Science and technology rejuvenate Shaanxi, benefit the country and the people. After the implementation of the project, it has a number of superior properties:
1. The project is an energy-saving and environmental protection project, which not only does not have any environmental pollution, but also does not waste a drop of water resources. And it does not affect the water supply needs of city dwellers in any way.
2. Effectively regulate the water storage capacity of the Youhe reservoir to meet the water demand of the people.
3. Effectively regulate power supply demand. Alleviate the pressure on the power sector to regulate and control power stations. (Its performance is much higher than the impact of unstable performance of photovoltaic power plants and wind power plants.) It is easy to connect to the national power station. )
Fourth, the project has a small investment and a large return. The project is initially expected to build a small hydroelectric power station of 500 kW/h. The annual income is about 1 million yuan. It can effectively improve the economic benefits of the people and alleviate the power demand of the people.
Fifth, solve the employment problem of some laid-off workers, help the government lighten some of its burdens, and improve the living standards of the people.
All in all, the project has a promising future. It is indeed a project to benefit future generations. It is expected to become a new force in "rejuvenating Shaanxi through science and technology". We sincerely hope that the relevant departments can give approval and support!
Sincerely
Salute!
Yao Xinliang, Weinan, Shaanxi
April 1, 2019
(Note):
The programme has now attracted the attention of the government and has been initially recognized. Experts and leaders from relevant fields have visited the door in person. At present, the project has been implemented and is expected to be connected to the grid for power generation by the end of this year. For a detailed plan, please refer to the appendix of this book.
(Attached) hydropower station design scheme
Diversion into the stream is especially" water conservancy engineering design grand plan
My home is in Weinan, where is the longevity plateau...... which apples and wheat are abundant there...... whenever I hum a song according to the Northeast two-person turn, self-composed, when I come to Weinan, I will see a majestic, rippling reservoir ------ Youhe River Reservoir in the distance. The reservoir is located at the south gate of Weinan, 5 kilometers southwest of Jiangjia Village, Xiangyang Office, Weinan Urban District. The reservoir was built in the early 50s of the last century, and is a comprehensive water conservancy project that focuses on urban water supply, taking into account flood control and agricultural irrigation. Since its completion, the project has played a great role in urban water supply, farmland irrigation, and urban flood control in Weinan City. It has achieved very rich social and economic benefits. In recent years, with the rapid economic development of Weinan and the continuous development and growth of the city, the demand for urban water supply has gradually become increasingly serious. In addition, the drought and lack of rain in recent times have caused serious waste of water in the production and life of enterprises, resulting in insufficient water storage and seriously affecting the quality of life of the general public. It has become an urgent problem to be solved in the urban area.
The difference is that less than 30 kilometers from the reservoir there is also a Jianyu reservoir. The reservoir is located within the boundary of Gaotang Town, Huazhou District, at the junction of Wei (Linwei District) and Hua (Huazhou District). The reservoir was built in the early 70s of the last century, and it took 10 years to start operation in the early 80s of the last century. Most of the male villagers in our village who are over 60 years old have participated in the construction of the reservoir. The reservoir area has beautiful scenery, beautiful mountains and rivers, and very rich water sources. And the water quality is very clean. In recent years, the reservoir area has not only become a holy place for tourism, but also the largest water supply base in Weinan City. The annual water supply is as high as 22.55 million cubic meters, of which the urban water supply is as high as more than 13 million cubic meters. It accounts for more than 60 percent of all water supply in Weinan City.
The water supply pipeline from Jianyu to Weinan City, built in the early part of this century, is one of them. The project is more than 30 kilometers long, passing through Gaotang Town, Huazhou District, as well as Qiaonan Town, Chongning Town, Linwei District, Xianwang Township (now merged into Chongning Town), Fengyuan Town, Xiangyang Office, Zhannan Office and other areas, and entered the urban area of Weinan. The pipeline supplies more than 6 million cubic meters of water annually. Among them, Beilei Village, Fengyuan Town, is about 5 kilometers away from Xizhang Village, Xiangyang Office, and crosses the majestic and continuous Longwei Slope, with a water level difference of more than 300 meters between the upstream and downstream, which gives birth to very rich kinetic energy. It's a pity that it has not been used.
With the continuous development of reform and opening up, the economic outlook of our Weinan City has shown rapid development and changes. Cities are also growing in size. As cities continue to grow in size, so does the demand for electricity. Especially since the recent interruption, the city has successfully realized the reform of coal power. As a result, the demand for electricity has become even hotter. With the continuous growth of electricity demand, emerging industries such as new energy development, small-scale power generation, and distributed photovoltaic power generation have also become hot topics and have become the object of development and research by people of insight.
In view of the unique favorable conditions of the water supply pipeline from Jianyu to Weinan, I boldly conceived the strategic ambition of "leading the stream into You". After the project is built, it can not only solve the impact of insufficient water supply of the Luhe Reservoir, but also play a role in power generation, water supply, irrigation, water storage and water storage to regulate the water storage volume as one of the benefit projects. After the construction of the water conservancy project, only the following two steps are required:
1. Change the pipeline. In order to build a project that can generate electricity without affecting the city's water supply and irrigation, it is necessary to change the way the downstream pipeline is delivered. Personally, I think it is okay to disconnect the water supply pipeline from the vicinity of the Longweipo garbage disposal site and then introduce the water supply pipe into the Youhe Reservoir. The downstream water supply pipelines can be completed by changing the water supply from the Youhe Reservoir. (Some of the changes may result in a weakening of the water pressure in the downstream waterworks and a deterioration in water quality.) Some of the waterworks pressure equipment needs to be changed. )
2. Construction of power stations. Once the pipeline diversion project is completed, a small hydropower station can be built near the Yuhe reservoir. As for the specific construction plan of the power station, it must wait until the strategic plan of "diverting streams into the country" is approved before it can be designed.
Bringing the stream into the especially, benefiting the people, the merit is in the future. This move can not only effectively solve the situation of insufficient water storage in the You River, but also alleviate the impact of the country's power shortage and drive the high-speed take-off of the industrial economy. It has broad development prospects and a bright future