Chapter 842: When construction is underway

The neighborhood around Friedrichstrasse is bustling with activity.

In front of the convoy of Behemoth Industries is a clearing that has been isolated by a white construction wall. Now Berlin city health workers are dismantling this part of the wall.

The old building has been demolished and removed, leaving behind some rubble and reinforced concrete piles buried in the ground. According to the normal procedure, if you want to build a new building on this land, you must first clean up the original concrete pile foundation structure, and then re-drive the pile foundation or concrete frame according to the construction drawings of the new building.

This step alone will take seven days at the earliest.

The street is now crowded with pedestrians, and on the opposite side of Friedrichstrasse, the café on the street, or a place to relax for guests, has been reserved by curious citizens.

While greeting their acquaintances, they teased about the possible next performance of Behemoth Industries.

Even these media reporters threw away their interview cars one by one, ran to the window position on the second and third floors of the opposite street, set up their camera equipment, and leisurely drank coffee while waiting for the performance of the giant beast industry.

"Hey man, do you reporters believe that this company from Huaxia can build a flagship store in one day?"

"Even stupid monkeys won't believe it. ”

"Then you still have so many interview equipment......"

"Satisfy the curiosity of the citizens who can't catch up with the excitement. ”

The reporter was sipping coffee comfortably, and across the window, the convoy of Monster Industries had already driven into the construction site, but it seemed that the employees of Monster Industries were not in a hurry at all.

They ordered hundreds of steaming cups of takeaway coffee from four coffee shops opposite, and the workers in orange and yellow uniforms each received a cup of coffee and drank it with a smile before moving a pile of plastic crash boxes out of the luggage compartment of the bus.

Most of the equipment and instruments contained in the plastic boxes are unknown to them, but according to the operation of these employees, these instruments should be detection and detection.

They used instruments to measure back and forth on the land belonging to the Behemoth industry, and there were several technicians sitting at folding tables full of laptops, occasionally issuing orders to the inspectors through the intercom.

Little by little, time passed.

Two hours have passed since the people who watched from the sidelines have developed from the initial mentality of watching jokes to the current mentality that they feel bored and bored and might as well go back to work.

In the past two hours, the group of Chinese people on the opposite construction site have been testing.

With the instrument, every inch of the thousands of square meters of land was tested, and even with the help of a small rotary drilling machine, several slender metal probes were used to test the depths of the ground. They don't understand why, isn't it just a three-story flagship store?

It's not about building skyscrapers, or subways.

If a reporter or a citizen can approach the data terminal of these detection instruments, they will find that on the computer screen of the folding table, there is already a detailed three-dimensional model, clearly marking every pile foundation, every pipe, and every piece of gravel under this land.

This very advanced and fast means of geological exploration seems very boring to people who do not understand the inside story.

So much so that two hours later, two-thirds of the onlookers in the vicinity dispersed, and only a lot of people were still watching from the coffee shop on the opposite street.

They didn't wait in vain, a cup of coffee was not enough, and the big scene they were expecting finally appeared.

The on-site staff opened the container of the first Mercedes-Benz heavy truck and installed inclined tracks on the container. Then, in the anticipatory gaze of many people who stood up, a wheeled, somewhat like a giant god type construction machinery roared down from the container.

The first sight of this mechanical car made many onlookers raise their mobile phones and keep taking pictures of it.

It is not Titan-I, and Titan-I is also present in small numbers in Europe. At the same time, in Germany, which can be called the kingdom of machinery, the construction machinery with a double robotic arm structure of the Titan I type will not attract too strong attention from the public.

It is designed and produced by Behemoth Industries for the construction of energy service centers.

The construction of energy service centers has now reached the fourth phase, and there are more than 2,000 energy service centers across the country. In order to be able to build this uniform standard building across the country more quickly, the monsters were limited by the limitations of the Titan-I being too large to be suitable for indoor construction.

The size of the Titans I was made smaller, from a hybrid to a pure electric generator, and two additional sets of robotic arms were added.

It's a crab-like high-tech machine with four robotic arms......

The traditional Titans I is equipped with a diesel generator set with a dead weight of nearly two tons, a large fuel tank, and a rear removable tool table. None of these components are now present on Titans II. It is mainly constructed indoors and relies on wired cables for power supply.

Two additional robotic arms were added to the rear workbench, which was technically easier than building a Titan.

Of course, it is also much more difficult to operate, requiring two operators to operate remotely together. The operators who were responsible for the construction of the energy service center had been practicing for half a month before they ran in with each other to the point where they could enter the construction site.

It's not like an excavator, people who can drive can go up and learn the basic operation in less than half an hour, and the rest is practice makes perfect and slow exercise.

At the same time, this kind of machinery specially designed for the construction of the giant beast industry, the integrated intelligent construction process preparation, does not have the premise of hot sales in the construction market. When building the energy service center, the Titans II was also mostly built indoors, so few people in the outside world have seen it, let alone Europe, thousands of miles away.

No matter who you are, the first time you see this guy, you will be adored by its strange appearance.

In particular, the two operators, who had reached the point where practice makes perfect, easily operated the Titans II to go down to the construction site, and unfolded its four robotic arms that were more flexible than crab claws, and when they opened their teeth and claws in mid-air, the people who originally felt bored were even more excited.

One by one, they can't wait to put their mobile phones on the glass, and if they can't take pictures, they turn them into videos.

The crab-like Titan II was used to clean up the site, and four different tools were installed at the end of its four robotic arms. There are breakers, hydraulic shears, flat shovel heads, and rammers that can reciprocate. Connected to the power supply, its four robotic arms wave back and forth on the construction site covered with dirt and concrete debris.

For a time, the dust on this construction site of thousands of square meters was flying and roaring like thunder.

Outside the construction site, two city sanitation trucks are parked here. While the staff turned on the water mist cannon machine to suppress the dust, they also grinned like the water outlet of the fog cannon machine.

The charm of complex machinery is often greater than the attraction of stars.

When someone was a child, he saw an excavator loaded with a hammer for the first time, and he could stand by and watch all morning when he was demolishing the building with "knock~knock~knock~". For the first time, someone saw all kinds of strange large machinery in the mining area, and they could run around the entire mining area with relish.

This is the mentality of these Germans who are now looking at Titans Type II, and the bored populace is gathering more and more.

Some of them drank coffee, some of them stamped their feet in the cold wind, but their eyes never left the construction site, constantly waving the mechanical arm of the Titan II.

It seems that ten excavators in front of it can't compare to its efficiency.

Its robotic arm swings as quickly as a construction worker, and in less than an hour, thousands of square meters of construction site have been transformed into a flat and neat open space.

The dirt has been hammered like a brick floor by a pneumatic rammer with an instantaneous impact force of ten tons.

The exposed concrete pile foundation was also heavily trimmed by the Titans II, and now it is at the same level as the hard earth.

It's three o'clock in the afternoon local time in Europe, and there is still one day and sixteen hours left before the launch of the second-generation Phantom Crystal mobile phone of Behemoth Industries.

Now, the floors of the opposite Friedrichstrasse are crowded with people, and at this moment I don't know how many cameras are focused on the land.

It took an unbelievable hour for the giant beast industry to level the vacant land, and although the old pile foundations that had been repaired were not removed, its existence just provided a solid support platform for the new flagship store to be built.

That's what the populace thinks, but the Behemoths don't.

Another piece of mechanical equipment, which was driven out of the container by the staff.

It's a bit like a water tanker, but it's much smaller, with only the body supporting the tank and no cab machinery.

The staff from Huaxia unhurriedly adjusted the device, and then the crab-like Titan II also came over to join in the fun, fixing a hose on the device and holding it half-up in the air.

When the automatic valve opened, a milky white, somewhat creamy semi-solid liquid sprayed out of the hose and fell freely onto the leveled ground.

Remember the mobile version URL: