Chapter 149: Change of Construction Company
Volume 1: Monster Rises!Chapter 149: Changing Construction Companies
Next chapter
The factory building built by the old factory is the kind of standard steel structure multi-span single-storey structure.
This type of plant is quick to build because the foundation does not have to be too deep, and the construction is very fast. If a higher-cost steel structure is used, the construction period will be faster.
Ye Jiangning said that this construction company is not lazy in its work. But the construction materials that were purchased were a little greasy, and the style of doing things made him dislike.
Ye Jiangning is Party A, and Party B's construction company is responsible for the construction of the factory.
Because there is a design institute that specializes in designing drawings, and there is also a supervisor who is responsible for quality supervision. In addition, the construction company has to send the samples to the quality inspection station and the material testing center for testing.
Ye Jiangning didn't worry too much about the materials. After all, if you don't have a way, it is much more expensive to buy from the market than the construction company, and it is easy to buy fakes.
As a result, the materials ordered on the site, steel and concrete, were no problem. However, there are some places that are easy to ignore, and the problem is not small.
For example, the new plant is ready to launch the corundum wear-resistant floor, which is first popular in developed countries and then introduced to China. Now the newly built industrial plants in China also prefer to use this kind of floor, which has the characteristics of being solid and wear-resistant, and not easy to dust.
The construction party played a hidden trick in this area, using counterfeit products to pretend to be large manufacturers, although they can also be used. But at the price of Master Hua Kang, he bought Kang Shuaifu, who would be happy about this?
If the construction company dares to play like this, it will naturally have a way to circumvent the supervision and quality inspection station.
First of all, his steel and concrete are qualified products without problems, with quality and quantity, and the overall acceptance of the plant can be 100%.
The layer of corundum curing layer on the floor, after it is done, its various indicators are within the qualified line.
The index is nothing more than particle size, Mohs hardness. As for whether these floors will crack and dust after a few years of use, because the adhesive is not up to standard, what does the ghost know?
Unless the inspector can have the skills of the Industrial and Commercial Bureau, to investigate the manufacturer of these materials, it is actually a counterfeit manufacturer.
Ye Jiangning learned that this was purely accidental, and the factory is now expanding to many employees, including one who has spent several years in the factory that produces emery. When the construction company made the first emery floor, it used the factory brand that the employee had stayed in.
The employee immediately discovered that the emery was crushed and polished from minerals, and although the outer packaging was exactly the same as the factory where he had been staying, he was sure that there was something wrong with the materials inside.
He called his former colleague again to ask clearly, and after confirming that these were counterfeit products, he quietly told Ye Jiangning about it.
If it's just the same, maybe the construction company can explain that they were also deceived.
But after the construction company of the first factory was built in two shifts, when arranging pipes, lighting equipment, and cables, Ye Jiangning, who was suspicious, found out that there was a problem.
The same method, and they are all products of high imitation big brands, and even those workers recruited by Ye Jiangning who have been engaged in these industries dare not draw conclusions.
It was these workers who had been engaged in related production who made several phone calls, turned left and right to inquire with their original acquaintances, and only then did they ask about the market inside.
Ye Jiangning asked the construction company to deal with the matter, and the construction company was wronged, saying that they were also victims and were deceived by these products that were almost no different from the original factory.
They said they would replace it immediately, but the latter offer should be mentioned above.
That's the pricing in the contract, but they didn't expect to be cheated out of fakes. Subsequently, the construction party listed a series of similar situations. For example, when they used to make pipes for a water company, they were originally filled with sand, but when they encountered soft soil, they had to use concrete to reinforce them.
This is an extra-contractual change in price and is reasonable.
Rao is Ye Jiangning has a good temper, and he was almost angry with this construction company.
Of course, Ye Jiangning decided to change the construction party even if the construction period was delayed a little, and asked them to claim compensation in accordance with the contract.
After hanging up the phone, Ye Qing thought about it in his mind, but he didn't expect that there was an acquaintance who was engaged in a construction company.
At the beginning, the Longxitan factory was completely built by the monsters themselves. It turned out that there were fences and dilapidated factories, but everything that could be demolished was demolished and sold for scrap metal. Ye Qing directly asked the monster to pull the tall courtyard wall, and the factory building was reinforced and renovated, and two more were built.
When the factory was transferred, Ye Qing went to the Urban Construction Bureau to get a quasi-construction permit. The director of the Urban Renewal Bureau is an old acquaintance with him, and the lady Tu Kerb makes him look like a showman. Longxi Beach has been built on the basis of renovation, as long as it is not built on other people's ground, Ye Qing will not have a problem even if he builds ten.
The giant laborers here want to build a mechanical giant, and there is no way to pull away to help build a factory there, and it is not enough for a dozen laborers to go.
I didn't know anyone, Ye Qing thought of Doudou first, and called her to ask if she had any relatives who ran a construction company, and he had a project to talk about.
This question is also a coincidence, Doudou said that her cousin's family is a construction company, but the scale is not large, and it turns out that it is contracted to build one or two residential buildings in the community. In the past few years, the real estate has been sluggish, and his cousin's company has been very difficult to maintain, because the project money has not been returned.
If you can build a residential building in a community, you can build a factory. Ye Qing asked Doudou to ask her cousin first, there is a factory project that can not be accepted.
"Brother Ye, my cousin's construction company is very small, will it not be able to do well?" Hearing that Ye Qing was going to come to help her relatives introduce business again, she was overjoyed and moved, and she was also very worried about whether her relatives were not capable enough to complete Ye Qing's project.
Although Ye Qing didn't say the price of the project, he didn't need to ask, he knew that it would not be an ordinary small project.
"The difficulty of a standard factory building is much lower than that of a residential building in a residential area. Ye Qing knew what she was worried about, but there was no need to worry about it.
"The factory building is mainly manpower input, and the machinery is not enough, and there are too many construction machinery waiting to be rented on the market. In terms of manpower, many construction companies have worked with familiar construction teams, after all, there are very few companies that can raise large construction teams. Most of them are after receiving the project, and then cooperate with the familiar construction team who are looking for work everywhere.
"I'll wait and send you the previous electronic version of the bidding book to your QQ mailbox, you go and ask, the project is done to anyone, it's better to give it to your own people. ”
Ye Qing's words of her own people made Doudou's heart feel happy, and said that she would ask now.
After the tender was passed, it was necessary to read it before replying, and Ye Qing continued to be busy with the comfort improvement and transformation of the prototype.
Ye Qing plans to register a patent after this prototype is improved, and then apply for a production license for engineering vehicles, which can be sold as a product.
Of course, after the improvement, it will be sent to the construction site of the old factory first, so that it can participate in the construction of the factory, so that it can also thoroughly verify the various performance of this equipment.
The first to be made was a wearable operating device, which was built according to the normal human body.
This thing is cool, after improvement, it is the same as the skeleton of the Iron Man armor, of course, it only has the upper body at the moment, and it can't move autonomously, but it controls the machinery of zhì more than the armor.
The operating equipment is all made of light alloy, and the sensors and circuits are hidden inside.
Where it fits the waist and shoulders, memory foam is also used as a cushion, which is not awkward at all.
After connecting with the cockpit, Ye Qing deliberately started the machinery and drove outside for a few laps.
Perfect!
The problem was solved once and for all.
Relying on the strength of his waist, when Ye Qing manipulated the mechanical giant god, he couldn't feel too much weight on his hands at all, and it was more convenient to operate. The button for switching between tools is also integrated.
The phone rang, and it was an unfamiliar number.