Chapter 682: Simple Construction Mode.1
Taking advantage of the lunch break for the construction crews, the helicopter transport team in the rear base has also completed several round-trips one after another, transporting the main construction tools and materials for the dam construction.
In addition to a large number of finished special cement that has been mixed, there is also a special blow-filling device, which is also a machine designed by Zhao's company for this construction.
It is similar to the principle of the island land reclamation tools used by Huaxia in the southern seas, but the sediment from the seabed is blown there, and the material used here is a further special cement.
Naturally, this kind of blowing and filling tool cannot be used directly on the dam, because the cement is in a semi-liquid state, and the construction personnel present need to set up a mold.
It is like the molds used in the forging of many metal tools such as pots, bowls, scoops, basins, knives, and swords, but the molds of this kind of dam are not so delicate, and what is important is a heavy and durable.
Therefore, for the area in front of us, which has thousands of skilled technical construction personnel, and even the engineering arms of the military region that are more proficient in various construction energies.
The mold needed for this dam is nothing more than a little bigger, a little taller, but if it really wants to compare with the high-rise buildings in the city, it is far from qualified!
So, this kind of work is not difficult for them at all.
After more than an hour of work, the fine scaffolding required for this special mold has been built.
Immediately after that, a tool designed by the Zhao Group appeared.
It's an inflatable block mat that is connected to each other with a loop and padlock for a seamless fit!
After all, the scaffolding in front of me is just scaffolding, and it is still a lot short of a mold.
Therefore, in the design of Zhinao Xiaohu, this kind of inflatable cushion dedicated to Zhao's special cement came into being.
Although it is still plastic, it is tough and durable, full of toughness, and can reach half a meter thick under extreme inflation.
By attaching the inflatable mats to the inside of the scaffolding, and connecting the inflatable mattresses to each other, a simple dam model is ready for use.
However, many of the construction workers present were not at ease.
After checking back and forth several times to confirm that there was no difference with the design procedure, the cement blowing work began with suspicion.
"Buzz~!"
The humming of machines sounded in the silence of the mountains.
Thousands of mountains and snow, thousands of paths disappear, this was originally a vast beauty worthy of praise, which is full of far-reaching artistic conception, but also a gift from nature.
The so-called, Ruixue mega year.
However, when this gift unfortunately came too much and too often, it turned into a disaster.
The goose-feathered snowflakes still kept falling, almost obscuring all the sight around them, connecting the heavens and the earth into a snow-white patch.
The personnel responsible for maintaining the curtain above their heads had climbed up and down more than a dozen times in a row.
As time passed, the originally silvery white earth began to slowly darken, thick clouds blocked the sun, and the weather began to become overcast and cold.
More than four hours have passed, and the filling work is over!
According to the previous engineering design and arrangement, their task was over after the cement blowing was completed.
In other words, the construction of the entire dam has now come to an end.
According to the previous arrangement, they can already return to the base!
But for the experienced construction workers in front of them, no matter how you look at it, this plan feels a little unreliable.
The previous new tools are just that, after all, the effect is more intuitive, and the operation can be seen, and the efficiency is really not said!
But now these cements and dikes ~
According to what the Great Elder said before, this is the cornerstone of the rise of the entire Chinese nation, and there is no room for sloppiness.
So, after going through the whole construction process.
Several responsible persons and the highest-ranking soldiers in the military industrial team here also got together to discuss.
Finally, I looked at the food reserves they had brought with them when they came, and the tents they had used to shelter from the cold and wind, so I made an impromptu decision.
Let most of the construction team go back first, leaving a hundred or dozens of people to temporarily settle down in a nearby sheltered area.
In order to respond to the strategy~!
"Anyway, according to Zhao's statement, this kind of cement only needs a day to completely solidify, we only need to guard here now, and wait until tomorrow, everything will be clear!"
With this suspicion and responsibility, the last hundred or so soldiers remained in this wilderness.
It's not cold, after all, it's still snowing a lot, and it's not time to melt the snow, and the tent provided by the Zhao family is really good~
And more than 100 soldiers gathered together, there was naturally no problem in safety, and there was no shortage of food, and finally a lively night, everyone also had a party, the fire was sky-high, and the laughter was endless!
There are actually not many people who have the same idea as the team of fighters in front of them.
In other words, after a day of joint construction, the construction of 100 dams in the first phase of the previous state has basically been completed.
However, due to this efficiency, it is really a bit scary, especially when it is placed on projects such as dams, which makes many construction site managers and leaders uneasy.
As a result, in almost all of the 100 construction projects, there were special personnel who were finally retained to guard and witness the project!
Early the next morning.
More than 100 soldiers were urged by the wake-up signal to quickly complete the wake-up and personal hygiene problems, and quickly assembled.
At this time, the heads of several construction teams, as well as the leading commander, actually couldn't wait to go to the dam to inspect it at dawn.
The result was really surprising to them.
After a night of anxious waiting, the dam that they blew out yesterday had indeed solidified.
At least when they stand on the dam, they don't feel any collapse, collapse, or fragility like the tofu scum project!
An engineering mind who does not believe in evil even specially holds a sledgehammer that comes with it, shouts slogans, swings vigorously, and smashes it into the surface of the dam body.
As a result, one of his arms was almost swung into a sieve by the force of the rebound.
The concrete dam that he had hammered was just a hair-thin mark.
This result almost didn't make the eyes of the crowd pop out!
This is also because the solidification time of these special cements is not enough, resulting in a slight "softness" of the dam body.
As an expert in the construction industry, the person who picks the sledgehammer can naturally judge the degree of solidification of these cements by virtue of his rich experience, and what stage it has probably reached.
For him, this efficiency is nothing short of miraculous!
"It's incredible! Is this special cement developed by Zhao really as they say, it can be completely solidified in one day!?"
"I'm afraid this will have a big impact on the construction and building materials industry!"
"Not only that, according to the reports we have seen before, the strength and service life of this cement are at least eight or nine times higher than the best cement on the market today!"
"I've also read this report, I thought Zhao was blowing the atmosphere before, but now look at our dam project, there shouldn't be much water mixed in it!"
"I'm afraid there is still less to say in other people's reports!"
……
After discussing excitedly for a while, several people hurriedly returned to the camp.
The commander of the unit woke up the sleeping soldiers, and after a quick tidy-up, everyone returned to the dam construction site to complete the final finishing touches.
For example, remove scaffolding and air mattresses, remove curtains covering heads, check the quality of work, and so on.
After completing this, everyone braved the heavier and heavier wind and snow, packed up some of the engineering equipment that they had not taken with them yesterday, as well as various daily necessities, and waited for the transport personnel who came to pick them up.
The same happened at almost 99 other dam construction sites.
The heads of the various construction teams, after completing their work, almost unanimously reported their situation to the personnel in the rear base.
Under the construction of these elite talents in the construction industry, there were almost no human errors and mistakes in the 100 dam projects of the first phase of the rush construction project, and the construction work was completed with quality and quantity!
When this information of the various construction teams was unified into the hands of the Great Elder and others waiting in the rear, it was undoubtedly injected into their hearts!
While sighing at the reliability of the Zhao Group, they have also become full of confidence, because according to this efficiency and progress, it is really a drama to complete this disaster relief task in one winter!