Chapter 804: A Miracle of Architectural History
Early the next morning, Captain Liu had already led people to clean up the entire site, and the pay-off work had been done perfectly.
Although the area of this place is large, it does not take too long for the foundation to be laid out.
The positioning has been completed, and James and Xu Kexin came to the scene to find it.
It was not only James and Xu Kexin who came to the scene, but also many media. Originally, Lin Ze signed a contract with Tommar Company with a price of 400 million yuan, which had caused an uproar, and everyone knew that this was a loss-making deal.
But what I didn't expect was that yesterday the driver who had a good thing took a video of the excavator, which caused a sensation on the entire network.
It took one day to dig 40,000 cubic meters of foundation.
No, half a day, to be exact.
This speed is incredible, and it has even been called a miracle in the history of world architecture by some media.
So early in the morning, almost the entire city's media came to witness it. I want to see what kind of miracle Lin Ze can create.
And after hearing about Lin Ze's feat last night, he even sent an undercover agent to peep.
This undercover agent is none other than Li Muhua.
Li Muhua put on a little makeup and a hat, and then blended into the crowd.
For him, what happened yesterday really made him feel incredible. So Li Muhua also wanted to see Lin Ze in person, he was really not as invincible as the rumors said.
Lin Ze was very happy when he saw that so many reporters poured in. This is the best opportunity to promote them, the Tang Group's construction this time.
But Lin Ze didn't expect that among this group of reporters, there was one person who was relatively unique.
This man is Devin Carlson, the editor-in-chief of the World Architecture Magazine, and he is the authority of the entire architectural world.
Originally, he came to China to attend an important meeting, but he found such a strange thing in the news.
How is it possible to excavate 40,000 cubic meters of earthwork in half a day?
Devin Carlsen himself couldn't believe it, so today he also bought a plane ticket and flew overnight to the southwest city of Linze.
He wanted to see for himself whether it was true or not, and if it was, Devin Carlsen would have to get first-hand information.
Devin Carlsen was incredulous, but he also knew that if this was true, it would be a miracle in the history of world construction.
So early in the morning, Devin Carlson put on makeup and blended in with the reporters and the crowd of onlookers.
At this time, there were already reporters rushing to James's side.
"Mr. James, I heard that you were here yesterday, whether this is true or not. "Journalists know Mr. James, but as an international architect, he must not lie, and he will never tell any lies.
So what everyone believed James said, it must be true.
James also sighed and said in a deep tone, "My friends, although I don't want to admit the truth of this matter, it is indeed true. ”
As soon as James said this, there was an uproar.
Even such an international master architect said so, which can only show that this matter is absolutely real.
For everyone, they have only one evaluation, that is, against the sky.
Captain Liu already had a thorough admiration for Lin Ze, so he completely implemented Lin Ze's order today.
A full fleet of 800 concrete tankers, each with a cubic meter of 12 cubic meters, is on standby.
800 cars is nearly 1,000 cubic meters.
Although Party A has already prepared the formwork and steel bars and other tools, how can Liu Qi believe that they can complete the pouring volume of 1,000 cubic meters today?
This is simply impossible, and all the reinforcing and carpentry under his command together cannot complete such a large amount of work.
Even the amount of work for weaving could not be completed, let alone pouring concrete.
So the current Captain Liu's heart is also very bottomless. He didn't know if Lin Ze would succeed this time.
Although the last time the amount of excavation was already amazing, the amount of excavation is a mechanical behavior after all, and this time the weaving of steel bars and support formwork is a human behavior.
The behavior of machines can be controlled by the power system, but how can human behavior be controlled?
"Prepare the materials, the crane is ready. After Lin Ze commanded below, he climbed directly onto the crane.
This time he was ready to operate the crane himself.
At this time, the workers at the bottom were ready, and Lin Ze only prepared 15 workers.
Fifteen people were enough for him.
Lin Ze ordered these 15 people to be in groups of five people. Implement a one-hour shift system.
And Lin Ze has already prepared all the engineering materials.
The fat man connects the entire powertrain, which is his middle console.
Lin Ze knew that as long as the control console was connected, the steel bars and wooden boards could be automatically guaranteed, which was completely free of manpower, and the 15 people were just the ones who served as proofs. ”
After making all the preparations, the fat man scanned the drawings, scanned the drawings, and the result was that the drawings were completely in accordance with the design regulations.
Next, Lin Ze turned on the device of the power system.
The whole power system immediately started running, this is Lin Ze's crane, under the control of the power system, began to hand over the materials to the required position one by one.
The center console, controlled by the power system, begins to automatically bind the rebar.
Lin Ze does not use robots, but simple cranes and loaders. But even so, except for the extremely delicate work, there is no need for human operation at all.
The rebar workers and carpenters were going crazy, because they felt that they were overwhelmed, and the speed of the machinery was simply extremely fast.
They only need to follow up with fine-tuning and lashing, and the work will be done with ease.
"It's cool, it's so cool!" a rebar worker shouted with a smile.
The other had a hesitant expression on his face.
"If we continue like this, we're all going to lose our jobs. ”
Another rebar worker pouted and said to him, "What do you know? The boss has already said that we will work from 9 to 5, and the salary every day is ten times that of the previous one, and the boss said that no matter who we treat badly, we workers cannot be treated badly." ”
This sentence was indeed said by Lin Ze in front of many workers yesterday.
After hearing this, these people were moved to go crazy, and for them to make money is the most important thing.
So one by one, they were all full of motivation immediately, and they didn't even need to be replaced, and 15 people worked together, and the speed was more than doubled.
The reporters on the stage and the concrete drivers were already dumbfounded. This tmd is also too fast.
James immediately filmed out his supervisors to systematically inspect the rebar and format of the ties.
However, the results of the inspection found that there was no error at all, and it was absolutely accurate.
Even the spacing between each rebar, the size of the rebar and the height of the rebar. Including lap and weld lengths.
All reached a point of perfection.
When the supervisor nodded, Lin Ze waved his hand.
"Now it's pouring!"
As soon as Lin Ze's order was issued, one pouring truck after another began to pour in.
At this time, the fat man started another power system, and the scorching sensation of the power system control began, and the oscillating rod controlled by the other power system began to oscillate with extreme regularity and scale.