Volume 001 Two Two and Five Days

◆ Me: For us, harmony is: one purchase, one purchase, one production, one production, one purchase, one production, and one cross-strait. The points are: the division of light and heavy, the division of urgency, the division of urgency, the division of internal and external, the division of upper and lower, and the distinction between standard and non-standard

Me: As commanders, the most important thing is not what we are doing and how we are doing it, but what we are doing and how we are doing it. The effectiveness of each operational unit is far more important than our own performance. Last week, we talked about 'and', and this week we talked about 'points', these two words are the 'two taels' that we use to dial the weight of the 'thousand catties' on the scene.

◆ Me: Place an order one day earlier than the pre-time, schedule one day earlier than the start date, complete one day earlier than the outside time, arrive at the factory one day earlier than the online time, and complete the order one day earlier than the pre-delivery date.

Me: Calculate and calculate, rush and urge, our focus is nothing more than calculating time. Procurement outsourcing is planning the future, and production management is planning the present, and the common basis is the orders received in the past. As long as we do these five days well, it will be the day we succeed.

◆ Relax a little, so that you can enjoy the work as leisure.

◆ Me: Around: I have to report this to you, it was brought up by Beach, and I arranged it after reporting it to Cheap. In order to facilitate the merger and dispatch workers to identify the status, we will start today, and the orders that are cut in the requirements will also be picked first and then put into production. This only changes the order of accounting, and does not change the way materials are supplied. The advantage is that it is convenient to detect the lack of material earlier, and it also makes the logistics in line with the sequence of accounting. We also communicated with the site and property management before making changes. Today is the first day, and they still take the order from the outside area to pick up the material, that is, the production in the factory is completed, and then they come to send the order to pick up the material, and change the soup but not the medicine. However, we can't be harsh, let them get used to it.

Drive: Do I have a duplicate order?

Me: I didn't find it

Drive: Associate discovery

Me: You put it on this table, there is no heavy order!

Drive: The associate said there are five strokes, help me confirm it

Me: The assistant said yes, then there must be! The information sheet you gave is not good, then I should pull the information myself and find it, don't worry, it won't take more than five minutes

Me: Wow! The assistant is really good, saying that there are heavy orders, and there are really them! Saying that there are five strokes, it is a test for you! Help you find out ten strokes! You have to thank the assistant manager, otherwise you will lose a lot. It's the 10 orders of the Key on August 2nd, and the duplicate of the Key on July 14th, I didn't say it, hurry up and cancel it!

Drive: It's because he placed an order on the 7th/14th ~ and then canceled it again ~ on the 8th/2nd again, playing me to death

Drive: This kind of difficult task is still troublesome brother to come~ The little brother can't do anything

Me: It's yours to make the change

Drive: I'll leave it to you, you can just help me move it to the back

Me: I can't move it, it's all unproduced, and it must be canceled by you! The order number is given to you, and the blue 10 strokes are all. Find a little sister and set the July 14th to 0

Drive: I'll leave it to you~ brother

Me: Give your little sister a chance

★.

Drive: Brother, this is the hwfkwv information that you can help me find, does this have a customer product number? I need to compare, now I want to place 35 kinds of a total of 163 samples

Me: Okay, I'll take a look. No problem, give me two minutes

Me: You can do it yourself, right?

Drive: 555, it's still hard to get right, it doesn't necessarily get right for half a day. 555!

Me: I can't stand you, so it's 5 minutes, and I have to re-transfer the information and try to get it as much as possible

Me: Alright.

Drive: Thank you, brother~ You are so powerful~ Hahahaha

Drive: It's all, and I can't put into words what I adore you......

Me: It doesn't have to be like this, it's better to respect each other than to go on a blind date. It is necessary to move this number one customer. We want orders, not air freight, and ask them to place quick release orders for us.

◆ Purchase, production and marketing can be reflected everywhere, with my strength, a few minutes can solve the problem that he may not be able to solve in half a day, this is the way to work together. You are moved by me like this, and you can also be moved by the purchase of the right place in this way, of course, I will always assist you to infect them, and superimpose them again and again, without the coldness that cannot be melted.

★.

Me: Team leader, Xiangli is asking about this order, and the account is stuck with you.

Team Leader: The account is with me, but I haven't come back in kind

Me: I will arrange to redo it immediately, and this order will be delivered to the outsourced manufacturer in the afternoon, especially urgent!

Me: Team leader, please arrange a night shift turning, I have to do it tomorrow morning.

Me: These 14 haven't been turned yet! No, an all-nighter, enough time, have you encountered any problems?

Team Leader: Shit, I went out last night

Me: I found it, the property management doesn't transfer money, it's still hanging on you, you have been wronged again, the big head team leader.

Me: Section chief, next month's aluminum alloy has exceeded 500,000, so they need to be nervous

Section Manager: Okay

Me: This very anxious order, the day before yesterday to you, is still stuck? will be out on the 9th, tomorrow must be guaranteed

Section Manager: Got it

Me: Section leader, another week and a half has passed, and this resale TW order has not been done yet, what problems have you encountered?

Section Manager: Abnormal single transfer warranty

Me: I want to keep the bottom line, and the section leader should keep the information, and if there is a cost, don't say that it will not be possible at that time. The Secretariat Bureau handles cases based on how many days the materials have been on the scene

Me: The customer did not agree to the extension, there was no problem with the second turning

Section Manager: Well, I'm doing it

Me: This order will be shipped next Monday, and it must be all sold tomorrow morning! Because the electroplating factory does not work overtime on Saturdays and Sundays! I have to catch up with this one on the night shift tonight.

Me: Section Manager, I think that since the right to transfer the documents was handed over, we have become very passive on the spot, and people only look at the transfer time in the system, which lags a lot behind the actual time. For example, the following order was originally completed last night, until I went to find the material after two o'clock this afternoon, and the book was still hanging on CNC. If I hadn't gone looking for it, there would have been more cases of people going out of the station tomorrow.

Me: They don't provide materials, they won't take them to you and transfer them, haven't they been doing accounts for several days? If you lose the documents during the period, check the accounts, most of them are in your unit. There have also been many incidents of missing items.

Me: Can we make a little change, our own people go a few more times, and every once in a while we will send the completed documents to the property management for accounting? We will be more troublesome, but less wronged! What do you think?

◆ The first order: the actual completion date of LHNYF's black body manufacturing was delayed, and the cooperative factory FSGRG had to be closed on the weekend, and there was no guarantee that the order would be completed on time.

The railway HWFKWV and LHNYF are required to be completed simultaneously, and must arrive by the morning of August 25 at the latest. hwfkwv110079 into 8091 on 8/22;8/24 into 5400:8/25 before 10 a.m. into 3500nnpgea owes 9PCS tail number, because there is a back-charge, hwfkwv part is basically in place on time.

For the LHNYF part, after the completion of the LHNYF line, it is necessary to entrust EOLWQO to adjust the quality and then de-phosphating. Due to the limitation of chamfering machine capacity, the maximum output capacity of 5/16+M9 lhnyf per night is only 5000PCS, and the amount of 17000 can be completed in four days.

lhnyf line: 8/21 to complete 10000 + 8/22 to complete 3000 + 8/23 to complete 4000, the third batch is late.?

eolwqo: 8/23 back 12800 + 8/26 back 4200, the second batch is late.

FSGRG: It was only returned to the factory on 8/28, which directly caused the equipment class to be completed and put into the warehouse on 8/28.

(1) The director of the health management office only started to dispatch workers on 8/18, which is a little late. FGHWE was the head of the one-course production management system.

(2) The lhnyf line was also not tightened and could not be completed within the four days of 18, 19, 21 and 22, and the interaction with the production management should be strengthened.

(3) A new factory S0008keoae has been developed to dredge the bottles for phosphating processing.

The second order: This order tries to produce in batches

Because the production progress of the short material of the LHNYF line could not keep up with the progress of the pre-railway HWFKWV, it was actively changed to a batch production method, and a part of the HWFKWV shell was temporarily diverted to the main order assembled with hollow tubes. After lhnyf came out, it was still back to making the order with the delivery date first. This divides the production of the original equipment into two stages.

8/17 into the warehouse 3600, 8/18 into the warehouse 6400, 8/26 into the warehouse 3600, 8/29 into the library 3400

The total amount of HWFKWV to be shipped in the fourth week of August was 96,530, and after the basic completion, there was a little spare to make 10,000 in this order, and then to catch up with the HWFKWV123600 to be shipped in the fifth week, before the end of the month.

During the production period of this single unit, another problem of the front-end LHNYF line was exposed: the LHNYF line usually only has one automatic rolling machine for short material production, and if the demand is concentrated, the LHNYF material used in the former HWFKWV will not be supplied, and the two automatic rolling machines used for long-term material production rarely squeeze out the free time to make short materials.

At present, the solution is to add one person to manually roll the teeth, but the manpower of the lhnyf line has always been very tight, and it is necessary to do a good job of manpower interaction.