Chapter 0221 Commencement of Construction (2)
Because Tao Li really didn't know much about construction, most of the time, he listened to Tian Huang and Liu Ping. Tao Li just asked some questions at the right time, and then the two of them would answer them.
The first school. According to Tao Li's suggestion, it was built for the Angel Orphanage. Because the number of orphanages there is small, the school built does not need to be very large, after all, it is the first time to try, Tao Li thinks it is better to be safe. Moreover, it is located in the suburbs of Jinling City, and the matter of land is relatively easy to solve. Unlike the city center, where every inch of land is expensive, even if you want to spend money to buy it, you may not be able to buy it.
"I haven't drawn the specific two-dimensional and three-dimensional design drawings of the house yet, so we will go to the field in the afternoon to investigate, and then a specific design will come out, and then the rest is the construction thing. ”
Liu Ping sat opposite Tao Li and said with a smile.
"Everyone can rest assured, as long as there are design drawings, I can truthfully restore Liu Gong's design intentions. Tian Huang also patted his chest and said. He only needs to coordinate the overall work, and as for the rest of the work, he will leave it to the construction team.
"Okay, let's go to the orphanage together in the afternoon to have a look, it's hard work. Tao Li said with a bow. Ren Yan can call them, that's because he is the boss and pays them a salary, but he is just an outsider, although he has a good relationship with Ren Yan, but this is not a reason for him to show off his might, when he should be thanked, he still has to say a word of thanks.
"I'll go with you in the afternoon. The two of you undertake this project, I am naturally relieved, but I said ugly things in the front, when you used to undertake the project, I turned a blind eye to the slight cutting corners and embezzling the project money, as long as it did not affect the quality of the house. But this time is different, this is the first time I have been involved in education charity, if you let me know that you even dare to make up your mind for this kind of thing, which leads to the quality problems of the schools that have been built, then don't blame me for being ruthless. ”
When the two of them got up, Ren Yan warned directly to their faces. For a company as big as Ren's Group, every construction project is too big, and although the project money is supervised, it is impossible to cover everything, and it is not easy to detect the lack of more than 100 million yuan for projects that are more than 100 million yuan. And Ren Yan also knows the truth that when the water is clear, there is no fish, as long as it is not too much, he will not care too much, he can't get any oil and water, who is willing to do things for you.
"Mr. Ren, don't worry, we still know the severity, and we promise that we won't be out of the way. ”
"Yes, yes, yes, absolutely. ”
Liu Ping and Tian Huang's hearts tightened, they didn't expect that Ren Yan knew all the things they were doing behind their backs. But fortunately, Ren Yan had no intention of continuing to investigate, and the two of them hurriedly said.
In the afternoon, the group rode to the place where the Angel Orphanage was located. Because it is located in the suburbs, there is a lot of vacant land around the orphanage, and after Ren Yan negotiated with the local government, he bought a piece of land at half the market price, which is considered a school jointly funded by him and the government. After the school is completed, the government will pay for the remaining recruitment of teachers and teachers' salaries.
The purchased land is large enough, and Ren Yan's plan is to cover it from kindergarten to the sixth grade of primary school, in addition to normal classrooms, canteens, basketball courts, running tracks, art rooms, music rooms and other equipment will be built slowly. However, the cycle of these equipment is relatively long, and the top priority is to build the classroom as soon as possible, start the class first, and slowly build the rest of the facilities later.
In addition to Tao Li, the person in charge of the orphanage, Sister Wu, and the relevant leaders of the Education Bureau also came. There are also many reporters who have heard the news, and they are also taking pictures non-stop, after all, a big man like Ren Yan, it is no problem for any piece of news to be popular.
"Mr. Ren, according to the situation we just inspected, I think that this area will be used as a teaching area to build classrooms, and at the back of the classroom, this piece can be used as a stadium, basketball court and running track or something, and as for the canteen, I think it is very suitable in this area. ”
After about 30 minutes of investigation, after returning to the orphanage, Liu Ping took out a piece of paper and roughly scratched his plan.
"You can see how to implement it yourself, I just need to complete the work with quality and quantity in the end. "Since becoming the CEO, Ren Yan has rarely consulted on engineering matters.
"Okay, we must keep an eye on the project, and after the project is completed, Mr. Ren just needs to come to inspect it. Tian Huangte hurriedly said.
"Sister Wu, I don't know if you have any other requirements for school construction, as long as you put it forward, we will try our best to meet it. Ren Yan looked at Sister Wu on the side and said.
"No, no, we are already very satisfied that you can fund us to build a school, and I am so grateful to the bosses. Sister Wu hurriedly waved her hand. Even if she hasn't seen Ren Yan on TV, but seeing that several people in the Education Bureau are respectful to Ren Yan, Sister Wu also knows that he is definitely not a small role.
"Don't thank me! If you want to thank Brother Tao, I also helped because of him. Ren Yan said with a smile.
"There's no need to thank you and thank you, it's all for the children. Tao Li grabbed Sister Wu, who wanted to bend down and bow, and said.
"If there is no problem, then starting tomorrow, according to this line of thinking, the ground can be started. At that time, I hope that the leaders can participate in the groundbreaking ceremony. Ren Yan looked at the two leaders of the Education Bureau and said.
"That's natural, we'll be on time when the time comes. The two leaders of the Education Bureau also replied with a smile.
The next day, according to the arrangement of that night, more than a dozen large trucks dragged sand, cement, steel bars and other building materials, and drove towards the Angel Orphanage. These building materials companies are all downstream companies of Ren's Group, so it is very convenient to mobilize materials.
In the afternoon, under Tian Huang's arrangement, the construction team began to station on the construction site, cleaning the obstacles around the construction site and preparing for the official foundation laying. All kinds of related construction tools were also transported one by one in the afternoon, such as pile drivers, cement mixers, cranes, etc., all available.
With the completion of these preparations, the groundbreaking ceremony was also held as scheduled, and Ren Yan, the relevant leaders of the Education Bureau and Tao Li were all present to officially complete the groundbreaking ceremony for this groundbreaking construction.
On the afternoon after the groundbreaking ceremony, the construction of the first orphanage counterpart school that Tao Li had been striving for was finally started.