Chapter 353: Everything is ready
Several workers next to him also found that there seemed to be an abnormality, stopped what they were doing, and looked at it one after another, and some people couldn't help but ask, "Xiao He, what's wrong?"
"You... Look at this terminal. ”
Xiao He picked up the terminal that fell on the ground, put it in the palm of his hand, and showed it to everyone. The ground is covered with rubber pads, and the terminal ends are fine if they fall on the ground, and there are no defects such as bumps.
Everyone's eyes are all focused on the terminal in Xiao He's hand, hey, this terminal seems to be a little wrong, so familiar!
These days, the terminals that everyone uses seem to be far less beautiful, not so delicate, and somewhat rough. Such a beautiful and delicate terminal head, not seen in months.
"This seems to be the terminal made by Jiuzhou Industry!"
Someone immediately shouted in surprise, and someone walked to the small cart next to him, and then a louder exclamation sounded.
"Come and see, it's all the terminals of Jiuzhou Industry!"
Hearing such an exclamation, everyone gathered around the side of the cart, looking at the delicate and beautiful terminals on the cart, and suddenly they were extremely happy.
Some people speculated: "Jiuzhou Industry has fully resumed production in the previous period of time, and it seems that some spare parts have been sent to our factory one after another." ”
"Great, we can finally use the spare parts of Jiuzhou Industry again, those previous terminals are simply shoddy, we have had enough. ”
Not only the terminals, but also some other spare parts, such as internal plates and various motors, have arrived at the Hongxing factory one after another, and then are distributed to the assembly stations.
The original half-dead Shaoshan series of electric locomotives were assembled much more smoothly and gradually became normal. The DJ4 electric locomotive, which has been completely shut down, also has some workers who are busy and carrying out various assemblies.
The spare parts of Jiuzhou Industry have arrived one after another, and it is gradually no longer a secret, and many workers know about it. Something really interesting happened as well.
For example, some workers ask for spare parts produced by Jiuzhou Industrial Group by name, while spare parts from other suppliers, they resist using them.
"Mr. Xie, the situation is gradually improving, with the arrival of spare parts of Jiuzhou Industry one after another, whether it is the Shaoshan series of electric locomotives, or our DJ4 electric locomotives, all gradually eased up and began to enter the assembly stage. ”
"Well, I already know. Xie Zhenhua nodded happily.
Just now, he went to the production site of the assembly workshop, and saw the Shaoshan series, DJ4 electric locomotives, and began to resume normal assembly, it is estimated that in a few days, there will be Shaoshan series electric locomotives can be delivered, and even DJ4 electric locomotives will be dropped.
There are also some bold workers who asked Xie Zhenhua if he could purchase the spare parts of Jiuzhou Industry in full, because the quality of Jiuzhou Industry's things is too good, and they are satisfied with it.
……
Jiuzhou Industrial Group.
At the traction motor production site, the traction motor of the Shaoshan series took the lead in completing the production and manufacturing, and the first car, a total of six large traction motors, is being loaded.
Two large trucks, each equipped with three motors, will be transported to the Red Star Factory after installation.
In addition, the traction motor of the DJ4 electric locomotive is being manufactured, and it should take less than two days, and the first set of the traction motor system of the DJ4 electric locomotive will also be shipped to the Red Star Factory.
The situation is encouraging.
Tang Fei took a look at the production sites in the morning, and he was satisfied and relieved. When the system released the task, it was required to restore the full supply of spare parts for the electric locomotive of the Red Star Factory within 20 days, and Tang Fei still felt a trace of pressure.
It's too short!
Now it seems that there is no problem in completing this task on time. The foundation of Jiuzhou industry is there, and it has been manufacturing various spare parts for the electric locomotive of the Red Star Factory, which stopped for a few months halfway, and then started in full swing, and gradually got on the right track, and various spare parts were produced one after another.
Tang Fei, who was relieved, simply went to the Hexi factory in the afternoon.
It is located in the largest and most powerful subway manufacturing plant in China. The first phase of the project has been basically completed, and the plants have entered the stage of installation and commissioning of production equipment.
In the afternoon, Tang Fei drove his Hummer and arrived at the gate of the Hexi factory. The magnificent factory gate has been completely completed, and at the gate, there are already security guards standing guard, and there are already security guards patrolling the factory area.
Here, it seems, everything is going to look like it.
Looking inside from the outside of the gate, a huge modern factory area has been displayed in front of you. Outside the factory gate is a straight main road, and there are many people and cars coming and going.
Anyone who passes by here will stop and take a look at this big factory, and some outsiders will even think in their hearts, what kind of factory is this, it looks very big and very good.
The locals who are familiar with this area, see this big factory area, and feel extremely proud in their hearts, this is our big factory area in Qingjiang City, which belongs to Jiuzhou Industrial Group.
The security guards standing guard at the gate were very familiar with the Hummer, and immediately opened the electric retractable door at the factory gate, and the car drove into the factory.
Tang Fei drove and slowly walked around the factory area, and saw that the major factories were fully completed, some of the factories were already installing and debugging production equipment, and outside each plant, there were some equipment waiting to be unpacked and installed.
There are domestic and imported ones. There are large milling machines, drilling machines, and large CNC machining centers, among which several large five-axis CNC machining centers are imported from abroad.
Tang Fei's car stopped at the door of one of the large factories, which is a mechanical processing plant with an area of about 10,000 square meters, mainly used for the machining of some key and important spare parts on the subway.
Among them, there are several large CNC milling machines that are more eye-catching, which attracted Tang Fei's attention at once, and the machine tool is being installed, and it can be seen from the English on the machine tool that this is imported equipment.
There is also a lot of domestic equipment in the factory.
Among them, several CNC lathes are neatly placed, and they have obviously been installed and debugged and have reached the state of use.
This is the latest model of CNC lathes produced by Hehai Machine Tool Factory, Zhang Jianxiang learned that Jiuzhou Industry needs CNC lathes, he immediately took the initiative to contact, at a friendly price, half sold and half sent these CNC machine tools.
Now Hohai Machine Tool Factory has developed many models of CNC equipment, machine tool industrial control chips, IGBT and servo motors and other key things are all manufactured by Jiuzhou Industry.
Zhang Jianxiang is grateful to Tang Fei, and has never had the opportunity to repay the few CNC lathes sent over this time, the real friendship price.
Tang Fei walked over, looked at these CNC lathes with professional eyes, and was satisfied, although it is a domestic CNC machine tool, it is already very good, and it is completely enough for processing some spare parts on the subway.
In the production and manufacturing of subways, the largest amount of engineering is all kinds of machining, including cold processing and hot processing, and then the general assembly of subways.
Cold processing includes turning, milling, grinding, etc., hot processing is mainly welding, in Hexi plant, the construction of a professional welding machine workshop, an area of more than 10,000 square meters, mainly used for aluminum alloy welding.
The beams, underframes, car bodies, etc., of the subway are all made of aluminum alloy, which is a little different from the electric locomotive. Such a material, small specific gravity, light weight, good shock absorption performance, with such a material to produce the subway, smooth driving, comfortable, vibration and noise are relatively small.
Tang Fei walked into the welding workshop.
The construction standard of the plant is relatively high, and it can achieve constant temperature and humidity all year round, and the temperature and humidity are controllable. Some of the assembly and welding in the factory are starting to be installed.
In the workshop, there are two locations that are very eye-catching, and the locations have been drawn, where two large welding equipment will be installed, also called welding robots, numerically controlled, with a high degree of automation, and the welding stroke can reach 50 meters.
The welding of some large parts on the subway, such as the subway bottom beam, with a length of 20 or 30 meters, must use such welding equipment.
With such advanced welding equipment, Tang Fei is ready to exchange it from the "god-level industrial master".
The spare parts required by the Red Star Factory have been in full production, and many spare parts have begun to be delivered one after another, and they are just around the corner for full delivery.
After completing this task, you will be rewarded with gold coins, which will be able to be exchanged from the system for some equipment needed to produce and manufacture subways, such as large welding robots.
Almost all afternoon, Tang Fei was in the Hexi factory.
In the whole factory, gradually everything is decent, and the equipment has been installed and commissioned, Tang Fei feels very relieved, and looks forward to the day when the subway is manufactured.
……
The days went by day by day.
A few days have passed, and many people have been happy at the production site of Jiuzhou Industry, and they have worked hard for so long and finally achieved significant results.
Liu Jiang is the deputy general manager of production in the Hedong plant, he is in charge of production, and he knows that the production of the DJ4 traction motor has been completed, and he personally went to the production site.
Looking at the traction motor system in front of him, watching several technicians and quality personnel conducting the final inspection, Liu Jiang thought in his heart that he would know the result immediately.
After about one or twenty minutes, the inspection was finally completed, and the technician in charge came over and said happily: "Mr. Liu, the inspection has been completed, our DJ4 traction motor system is not only qualified, but the quality and performance are very good, and it can be delivered to the Red Star Factory." ”
"Okay, great!"
Liu Jiang was extremely happy all of a sudden, the DJ4 of the Red Star Factory was waiting for the rice to be cooked, and after the production of DJ4 spare parts was resumed, the traction motor system of the first car was finally completed.
Picking up the phone, Liu Jiang personally reported the good news to Tang Fei!
……
Today's three watches, the second one is sent!