Chapter 26 Preparing for Molting

"You even know about the ancestors?"

Seeing Li Huayong behaving like this, Lu Yuquan's eyes flashed with a hint of brilliance. He stared at Li Huayong for a long time and then sighed: "There are not many people in the mainland who can still remember their ancestors. ”

Li Huayong said: "Yes, I may not know much now, but I believe that if someone compiles the history of modern architecture in China in the future, then Mr. Lu will definitely occupy a very important place." ”

Lu Yuquan's face was pensive, his expression was complicated, and after a long while, he seemed unwilling to continue the topic. He changed his expression, and the topic turned to Li Huayong again, he waved his hand and said to Li Huayong with a smile:

"Originally, I have always been very curious about Li Sheng, it is said that with your age, there is no reason to understand so much, but you are a good guy, not only do things in a down-to-earth manner, but also be shrewd when you should be shrewd, experienced when you should be sophisticated, that is, principled, and flexible, this is completely a little fox, don't you say?"

"Hahahaha. ”

Hearing Lao Lu comment on Li Huayong, several people from the project department laughed as if they were cooperating. Of course, the only one who didn't laugh was Lin Wei. In fact, Director Lin also laughed at first, but when Li Huayong's gaze swept over her face, she glanced at Li Huayong, and then quickly restrained her smile.

Lu Yuquan waved his hand again, he pointed to the total station and continued:

"Originally, I have always wondered, where did this demon come from? But seeing Li Sheng's performance just now, seeing that he can learn the operation of the total station in just one time, I am not surprised at all now, after all, there are still geniuses in this world, and there are always some people in this world who are different. ”

"Hey, you've won the prize. ”

Although Li Huayong was humble in his mouth, he was happy in his heart. Why did Li Huayong show his hand just now? Of course, it wasn't that he really wanted to pretend to be a showman, but his real purpose was actually to wait for such an evaluation from others.

Traveling to the present, Li Huayong has shown too much unusualness. Li Huayong is not the kind of young man who does not understand the world, is such an "unusual" a good thing? No matter what others think, Li Huayong himself thinks that it is not a good thing.

With the performance just now, Li Huayong can give a reasonable explanation for his "demon".

Say:

"Why does this guy Li Huayong know everything? This doesn't look like an 18-year-old peasant contract worker at all, where did this guy learn his skills?"

"According to himself, he learned all his knowledge from that set of textbooks. ”

However, with such a simple set of teaching materials, can he practice such a high level of skill? You must know that many people say that with Li Huayong's level, it is beyond the reach of many ordinary engineers. ”

"This... Although there is a lot of advanced knowledge in architecture, you must know that more than 90% of the specific problems encountered in construction are the most basic things, and if he really gets through that set of teaching materials, it is not surprising that he has such a performance. ”

"There seems to be a little truth in what you say, but there is another problem: although the content of that set of textbooks is shallow, it is better than a large amount, covering almost all types of work in construction, I heard that he only studied for a few months, and he can learn all these things in a few months?"

"You're such a fool, haven't you heard that guy has the ability to remember? Others may not be able to learn, but Li Huayong is not a problem, not to mention that he is so studious and so hard-working, I am not surprised that he has such a ability. ”

"Never forget! Really?"

"Hehe, you don't know, come on, let me tell you, when Li Huayong was learning the total station... You know it again.,Li Huayong only watched it once and learned it all.。。。 ”

The above is what Li Huayong wants to achieve.

Li Huayong showed such a hand just now, of course, his purpose was not purely to pretend to be forced, but to save the trouble he might encounter in the future. The best thing is that this method also has an advantage, Li Huayong has not studied psychology, but he also knows a basic common sense of human psychology.

What do human beings believe the most? It is not what others say, and no matter how reasonable and reasonable others say, human beings may not believe it. So what do humans believe in the most? Psychologists will tell you;

What humans believe most is what their brains make up.

After solving such a problem, then the next thing to borrow the instrument is logical. At this time, even if Lin Wei is unwilling to borrow, it seems that it is no longer possible, not to mention that she is not unwilling, just now she was just posturing to make a petty temperament, in fact, everyone understands her mentality.

After finalizing the borrowing of instruments, everyone did not leave immediately, because Lin Wei still had to continue to be a teacher. Although Li Huayong "learned" it once, he didn't do it professionally after all. If you want to conduct a comprehensive retest of all pile foundations, it mainly depends on Yang Gong and them, so the next time is for Lin Wei to teach Elder Yang how to use the total station.

When Lin Wei continued to be a teacher, others were not idle, as the owner's representative, Lu Yuquan convened everyone to discuss the next step of the whole project:

"Come on, come on, just Mr. Xia and Minister Deng, you are here, let's talk about the next step. Since the start of construction, the problem of piling has been successfully solved by everyone, as for the problem in the afternoon, I believe that after having this total station, with everyone's efforts, this should not be a problem. But then again, I have other worries right now. ”

Xia Minghuan and Deng Chaoqun looked at each other: "What else is Mr. Lu worried about?"

Lu Yuquan seemed to deliberately want to test Li Huayong, he turned his head to Li Huayong and said:

"Xiao Li, tell me, what do you think I'm most worried about right now?"

Li Huayong was silent for a while, and then said word by word:

"The issue of production capacity. ”

Li Huayong's "production capacity problem" refers to the capacity of the mixing plant to produce concrete. At present, the project has advanced to this stage, and it can be said that it has reached a very critical node. If nothing else is a big problem, the final process of pouring concrete is likely to become the weakest link in the whole project.

Thinking of the old-fashioned mixers in the mixing station, Li Huayong, as a traverser, could only shake his head and smile bitterly. The project has a total of more than 800 pile foundations, and the average pile length is 25 meters, and the concrete required is about 20,000 square meters. It took about 2 months to pour more than 20,000 square meters of concrete, which is a big thing even in later generations, let alone this era.

20,000 square meters in 2 months, 10,000 square meters a month, converted into an average of more than 300 square meters per day, laymen may have no concept of this, but those who have engaged in engineering know that it is necessary to pour so much concrete every day, especially to pour "underwater concrete" such as "cast-in-place pile", which is definitely not an easy thing.

Not to mention anything else, just the production capacity of the mixing plant, if such a project is left in the future, then there is nothing to say, the mixing capacity of the mixing plant must at least ensure that it can supply more than 800 cubic meters of concrete every 24 hours. But what is Li Huayong seeing now: The maximum production capacity of the mixing plant is less than 500 cubic meters per 24 hours.

Speaking of this, some people may ask, you need to pour more than 300 square meters a day, and you can produce more than 500 square meters a day, isn't that enough? Here we need to clarify a concept, the so-called "mixing capacity" usually refers to the highest production capacity. As for the actual production capacity, those who have construction experience know that in the process of pouring concrete, the actual production capacity can reach half of the highest production capacity.

This is because the process of pouring concrete is not only mixed in the background, but also the concrete you mix out has to be transported and passed through the front desk, all of which take time. Don't underestimate these steps, as long as there is a slight problem in these steps, it will directly affect the smooth pouring of concrete.

However, in this kind of pile foundation construction, these steps are also very prone to problems.

Needless to say, just talk about the transportation of concrete, Pengcheng is currently in the rainy season, as long as a rain falls, in this mud crossing, potholes everywhere on the construction site, you can sometimes only look at the mixed concrete to cry without tears, can not be transported to the front desk at all.

Several of the people present are considered to be old construction, so when they heard Li Huayong mention this problem, everyone was grim and silent.

"There's no other way, it's up to you now. Xia Minghuan patted Li Huayong on the shoulder.

Lu Yuquan also looked at Li Huayong: "Yes, in the next month or so, the main thing is to look at Xiao Li." ”

Li Huayong smiled bitterly. He knew that when they said that, they didn't really think he could come up with anything else.

In fact, under such construction conditions, no one can have any other way. And the only feasible way is actually similar to the previous manual digging pile;

The machinery is not enough, and the manual filling is done!

Li Huayong, who manages more than 100 workers, is the key to determining whether the project can be successfully completed.

"I'm ready to shed my skin. Li Huayong thought silently in his heart.