Volume 17 Pretty Branches Section 61 The Contradictions Brought about by Development

"Secretary Lu, good news!" Qin Baohua's voice on the phone seemed to be a little excited and changed tone.

When Lu Weimin received the call, he was still inspecting the Nancheng New District.

After several years of construction, Nancheng New Area has begun to take shape, from the original comprehensive construction of the first ring road to the current second ring road has started construction, including Lingbei Avenue has taken the lead in the Nancheng New District to start.

Although it is nominally the second ring road, this second ring road is not irregular, mainly the bottleneck of the river crossing line.

The first ring road was borrowed from Binjiang Avenue for renovation and completion, but now the second ring road has expanded a lot to the east, west and south, but it cannot be expanded in the north, because further north is the problem of crossing the river, but how to cross the river?

At present, there is only one bridge across the river in Songzhou, which is a dual-purpose bridge of railway and highway, the Changzhou-Anhui railway is connected here with Suqiao and Anhui Province, the second bridge of the Yangtze River in Songzhou, which is now commonly known as the Songzhou Yangtze River Highway Bridge, was officially launched in December last year, and the construction period is expected to be three years, and it is estimated that it will be completed and opened to traffic by the end of 2006.

Therefore, at present, the second ring road can only take into account the Binjiang line, considering that once the second ring road is also connected to Binjiang Avenue, then it is equivalent to the superposition of the traffic flow of the first and second ring roads, and Binjiang Avenue will definitely be overwhelmed, so after combining the overall urban center of gravity to move southward, the Songzhou Municipal Construction Committee will re-plan the second ring road.

The northern section of the Second Ring Road directly crosses Luxi, Shazhou and Songcheng from west to east, including the old city of Shazhou and Songcheng, and completely opens up the original Beacon Hill Road, Tongming Road, Tianma Road, Yuma Street, and Baofosi Street. To meet the needs of the second ring road standard, these roads need to be widened and opened, especially at several intersections in the main urban area, new underpasses or overpasses are also needed, and the amount of demolition and engineering involved is very large.

But the road had to be built again.

If the first ring road is really connecting the old city of Songzhou with the new city. According to the plan, the northern section of the second ring road is almost a cross section from the old city from west to east, and the completion of this section of the road will greatly alleviate the traffic pressure in the old city.

At the same time, the western section of the Second Ring Road will completely cover the Meihuaping-Wayaoba area of Luxi District's next development, which will play a great role in promoting the urban economic development of Luxi District.

Similarly, the eastern section of the Second Ring Road connects the eastern plate of Songcheng District with the economic development zone of the southeast region, and connects the southern section of the Second Ring Road that extends to the northern foot of Dongling, so that the entire Second Ring Road realizes the interconnection of the old city and the new urban area, and at the same time provides a link support for the next step of the city's southward development.

It should be said that in the planning of the second ring road. After Lu Weimin took over as secretary of the municipal party committee in Songzhou, he still agreed with this planning concept, but made higher requirements in terms of progress.

Originally, the idea of the Second Ring Road was to start the relatively easy northern section of the Second Ring Road, namely Lingbei Avenue, in the first half of 2004, and then choose the opportunity to start the western and eastern sections of the Second Ring Road in the second half of 2004, and then consider the northern section of the second ring road in 2005, which is the most complicated, with the largest amount of demolition and the most contradictions.

But Lu Weimin vetoed the idea.

Lu Weimin knows very well that the more this kind of project is delayed, the more problems there will be. The greater the pressure, the more obvious the negative effect will be, there are no problems in the southern section, but there are some problems in the eastern and western sections. But in general, it's not very important, it's the northern section.

The more difficult the problem, the more important it is to start first, unlike other jobs, the easy first and then the difficult will only make the difficult problem more difficult in the end, and it will be dragged down because of the difficulty. It will also greatly affect the utility of this loop.

Therefore, Lu Weimin demanded that the southern, eastern, and western sections be started at the same time, and that the construction of these three sections must be fully started before December 2003, and the demolition of the northern section should also be started at the same time. The demolition of the northern section must be completed by the end of June 2004, the construction will be fully rolled out on July 1, and the second ring road will be opened to traffic before May 1, 2006.

This progress is more than a year and a half ahead of the opinions of the previous municipal party committee and municipal government, and it has also greatly increased the workload in 2004.

The reason why Lu Weimin did not hesitate to ask for speeding up the progress was also his own consideration.

When he left Songzhou four years ago, Nancheng New Area was still only a prototype, but now the northern part of Nancheng New Area has basically become a new central urban area, with Xinlushan Building, Meijia Building, Shangri-La Hotel, Fengyun Building and other landmark buildings have become the coordinates of the new center of Songzhou City, around this area, the city is still expanding to the south, and will soon arrive at the foot of Luoziling, so it is imperative that Lingbei Avenue, as the northern section of the Second Ring Road, take the lead in starting construction.

In addition to the rapid formation of the Nancheng New Area, Luxi in the west has also been increasingly integrated into the main urban area, and has even become the most active part of the entire Songzhou urban area.

Now the people of Songzhou know that if they want to be lively, they have to go to the Luxi side, whether it is a small commodity city, or a large number of small and medium-sized enterprises all over this area, it has become the best place for foreign merchants to purchase and foreign migrant workers to find jobs, and Songzhou City and even the largest labor market in the whole Changbei, southeast Hubei and southwest Anhui - Songzhou Jincheng human resources market is also located here.

As many as more than 100 employment agencies are located here, but also regularly and irregularly hold large-scale job fairs, an average of more than 2,000 people come here every day to find jobs, since the seventh day of the first month, there has been very lively, and around the completion of Songzhou Jincheng human resources market, close to the human resources market Cuihe Street, and the main small and medium-sized clothing, shoes, hats and accessories production enterprises are located in the Shatuoba, Zhuangyuan Bridge This area also gathered hundreds of small hotels, small restaurants, but also become the place where the dirt is hidden.

Luxi District also needs to be completed in the western section of the Second Ring Road, which can further improve the traffic situation of this block, provide a more convenient environment for enterprise land, and further enhance the competitiveness of this area as a warehousing and logistics industry.

Similarly, this year, the Economic and Technological Development Zone is also facing a momentum of rapid development, and the completion of the eastern section of the Second Ring Road can further enhance the transportation advantages of the Economic and Technological Development Zone, and even play a role in radiating and pulling the adjacent Yehe.

Of course, once the Lingbei Avenue is completed, it will also make Lu Weimin's idea of turning the entire Luoziling National Forest Park into the green lung and heart of Songzhou city center many years ago an important step.

Lu Weimin has never relaxed his attention to the construction and development of Songzhou City, but Lu Weimin is also very clear that in order to support the development of the entire city, the key is to have a solid industrial foundation to support.

Therefore, after he served as the secretary of the Songzhou Municipal Party Committee, although he was also very concerned about the urban construction of Songzhou, he still put more attention on the industrial development of Songzhou.

This time I came to inspect the urban construction of Songzhou, and Huang Xinlin temporarily came to take a look after inspecting the reconstruction and expansion site of Songzhou Yuantou Airport on the spot.

On the construction site of Wayaoba, more than a dozen excavators, loaders and bulldozers are scattered on hundreds of acres of mud land, the black smoke spewed out almost blackened the entire sky, the roaring engine sound comes and goes, a hill of dirt is bulldozed, and then a line of heavy dump trucks staggers into the field, waiting for the loader to unload the soil into the dump box.

Wayaoba-Meihuaping line is the key development area of Luxi District, the west section of the second ring road is named Longteng Avenue, the whole Longteng Avenue is 8.5 kilometers long, divided into four sections, along the Wayaoba line, all the way to Meihuaping.

The land resources of Luxi are still relatively abundant, especially in the suburbs, but once the second ring road is completed, then this suburb is really no longer a suburb, Wayaoba and Meihuaping will be included in the urban area, and this area will also become an important trade and logistics area.

The south end of the western section of the Second Ring Road can directly reach the Shazhou Wharf area of Songzhou Port, and an extension section directly leads to the wharf, while the Jiangzhou Avenue under construction in full swing has become an intersection with the northern extension of the Second Ring Road, which can be constructed into a complete grid system.

It should be said that every inspection can bring some new feelings to Lu Weimin, and these new feelings will also make him have more thoughts in his heart, for him, Songzhou is like a child of his own, how to dress up this child beautifully, so that this child can grow up better and healthier, is what he, a parent, needs to consider in the long term and in the near future.

The direction of urban construction in Songzhou is good, but there are still many unsatisfactory places in the specific operation, and there are many contradictions at the two levels of the urban area in the planning and construction and the land consolidation issues brought about, and similarly, these groups that have been demolished also have strange conflicts and contradictions with the government's planning, and the disputes over interests are more like a fire trigger, which may ignite these contradictions at any time and make them quickly burn and intensify.

But Lu Weimin also knows that in the process of construction and development of every city, it is inevitable to face these problems, to avoid or fantasize about what perfect solutions to make all parties reach an agreement and achieve a win-win situation, which is itself an unrealistic fantasy, and to really solve these problems, then there must be one or even more parties who will make compromises on specific issues at a specific time, or a certain sacrifice.

The final request for votes, of course, is also for the next month's guaranteed vote after twelve o'clock, and I am still in the code word, striving for twelve o'clock to write out! (to be continued......)