Chapter 332: The Joint Cycle

Southwest Motive's willingness to develop industrial gas turbines is good news, but then another piece of news makes Mr. Wu Zhonghua not know what to say.

"Changing Qingcheng into such a small gas turbine, are you sure there will be a market, I feel very difficult!"

Some people doubt that there will be a market, so whether this is feasible or not, Wang Zhengguo will immediately give an order.

"We have now successfully obtained the intention to order, mainly for the 624 high-altitude platform project supporting power stations, their demand for electricity is huge, if only from the local grid to use it is certainly not enough, so we decided to purchase a set of light gas turbine distributed generation system, so as to meet the huge electricity demand of the institute. ”

The high-altitude platform equipment of the 604 Institute requires a large amount of water, electricity and gas, but fortunately, the institute is built near the natural gas mine, and the cheap enough natural gas can be used casually.

The relationship between Southwest Motor and the Gas Turbine Research Institute is good, and both sides happen to have the same idea, so they pull on the Dongfang Power Station Complete Equipment Company, Dongdian Equipment will provide power generation equipment other than gas turbines, and the three parties will jointly establish a scientific research project consortium, and the three parties have even gradually started the preliminary work.

"Liu Daxiang's side? It's not surprising that they have this idea, so there are project start-up users, which sounds slightly more reliable than the Navy's procurement of domestic gas turbine projects, and it has also circumvented the state's ban on the development of gas turbine power stations using petroleum fuels, and the natural gas reserves in the entire Sichuan-Shu region are not low, right?"

Not only is it not low, the natural gas reserves and production of the Sichuan and Shu Provincial Party Committees have always ranked among the top three provinces in the Republic, and a large part of the West-East Gas Transmission Project is to extract natural gas from Sichuan and Shu.

"That's right, our natural gas reserves here in Sichuan and Shu are very rich, but it has always been a big province with a shortage of electricity, and we are now developing distributed gas turbine power generation technology, which seems to be to meet the huge electricity demand of 624 institutes, but it is also exploring ways to solve the current problem of power shortage in the province. ”

After 2000, the problem of electricity consumption in Sichuan and Shu was completely solved, because the Three Gorges Power Station was successfully connected to the grid for power generation, but it is not possible now, and the distant water will never quench the thirst of the near.

I heard that Southwest Motive Company is actually engaged in natural gas power generation projects, which is indeed a gas turbine application field with great development potential, which is completely feasible!

"In this way, not long ago, the central government commissioned me to study the clean energy power generation equipment project after retiring from the research institute, which can be combined with your project to see, even if I was more optimistic about the overall coal gasification combined cycle power generation, but this project is still inseparable from the gas turbine. ”

The central government commissioned Wu Lao to study clean energy power generation projects, which made Wang Zhengguo feel very excited, clean energy, yes!

Natural gas of course belongs to the category of clean energy, and then think of the increasingly serious environmental protection problems in China after 2010, thermal power generation will eventually be phased out, natural gas power generation will be a cake with great potential, and now it is just right to launch the water in advance.

However, there is still a question, Wang Zhengguo is the first time to hear that Wu Lao has retired from the Institute of Thermophysics, does this mean .....

"Wu Lao, our current power generation project is a tripartite alliance, but they are all at the same level as each other, and we can't find a person with high moral standing to preside over the overall situation, just now you are stepping down from there, and you are also entrusted by the state to engage in clean energy power generation research, and the general person in charge of this project is none other than you!"

Wang Zhengguo just didn't say this, Wu Lao also had to weigh it carefully, just in terms of the importance of this project, since he knew it, there was no reason to put it aside and not give support, and it was also related to his own research project.

"Okay, I'll listen to you, go back to the project team to inspect and study, and then immediately report to the central government, and strive to get a certain amount of project support. ”

Determined to stay here and continue to work, Wu Zhonghua immediately put forward relevant suggestions, for these three units to get out of the so-called gas turbine generator sets, he still has a lot of opinions, if only the gas turbine power generation of about 30% of the thermal efficiency, this kind of thing in the field of power generation equipment is really a bit too ugly.

"You may not know that in 84 years I was hired as an energy technical consultant for the Daqing Petroleum Administration and the Liaohe Oilfield Management Bureau, and at that time I proposed to them to promote gas turbines and combined cycle total energy systems, but because the domestic technology is not enough to develop related equipment, I can only give up!"

As for the oilfield energy cascade development plan proposed by me back then, now that I think about it, it can be combined with this distributed natural gas power generation project, which will more directly expand the use of Qingcheng Airlines' refueling engine, and it will also be easier to obtain the recognition and support of the central government.

The so-called combined cycle energy system for oil exploitation is actually to use the associated oilfield gas at the oil development site to drive the gas turbine to generate electricity, and connect the waste heat boiler to the gas turbine exhaust port, so as to maximize the thermal efficiency, from about 30% of the power generation of a single gas turbine to more than 50% of the combined cycle, which is the best use of natural gas and LPG.

The old man revealed his identity as an oilfield energy technology consultant, which immediately made Wang Zhengguo interested, if this matter is reliable.....

"Daqing Petroleum Bureau and Liaohe Petroleum Bureau are so rich, we can develop engineering prototypes for this project, and then invite these two units to observe, and it is best to get the project subscription funds from them. ”

The development of engineering prototypes, whether it is a waste heat boiler or a steam turbine that uses hot steam to drive power generation, these are not really any problems.

"R & D and production of boilers and steam turbines, Dongfang Power Station Complete Equipment Company has Dongfang Boiler Factory, Dongfang Steam Turbine Factory, they should be able to complete the entire project of the equipment matching, it is said that the central government has always had the idea to integrate these large energy equipment plants, this time you can take this opportunity to ask relevant questions to the above, and jointly form a large energy group, including Southwest Motor Company, as long as we do not suffer, the same can also be incorporated. ”

With the gradual maturity of Qingcheng engine, Southwest Motor has become a giant in the development and production of first-line aero engines in the Republic, and it is impossible for the government and the military not to notice that the Southwest Motor has been marked with a certain state-owned mark, which is the inevitable result, and only in this way can everyone rest assured.

In the 80s, if we wanted to completely create a large-scale military industrial unit that was not affected by government capital, and it was also related to the power system of the country's most advanced military fighter plane, and it involved national defense and security issues, even if the government and the army were at ease, Wang Zhengguo himself was not at ease.