182 Reward - Micro Nuclear Power Plant!

Random Mission 2 Reward: XT-001 nuclear power plant, using controllable fusion fuel rod + super shell + super efficient generator set, with a stable power of 500,000 KW!

"Damn, it's a nuclear power plant!" Li Wei looked at the large screen of the system in surprise, and there was an introduction of XT -- 001, a micro nuclear power plant with a power of up to 500,000 KW, but the volume is only a few houses, 300 cubic meters. Pen, fun, pavilion www. biquge。 info

Silver-gray shell, integral structure, containment wraps the entire unit, which needs to be buried underground; Including a full set of power generation and substation systems, maintenance-free for 20 years!

The service life is 20 years, there are 8 fuel rods, and the power is 50W kilowatts, which is enough to supply the entire Kismayo, and there should be a surplus.

Li Wei suddenly reacted that the most lacking thing in the territory now is power supply, not domestic electricity, and various economic development projects in the future will require massive amounts of electricity.

Like factories! robbed the machinery of the Liu family, and all of them were ready to be used to open a machinery factory, produce industrial products, and even produce weapons and guns, both light and heavy industries.

Four electric furnaces with a capacity of 20T, with a single power consumption of up to 10,000kw, consumes a huge amount of power, and are all typical one-furnace dual-purpose intermediate frequency furnaces; It can melt steel, iron, aluminum, copper, aluminum alloy, stainless steel, gold and silver, etc.

The main equipment, including cutting, turning, milling, boring, grinding, drilling, casting, welding, stamping machinery, is like a complete set of industrial production lines, with a total of 88 sets / groups.

If it is turned on at the same time, it consumes 80,000kw, of course, this is not possible, and even if it is fully turned on, there is no problem with the power supply, just a fraction.

I have to admit that the value of this mission package is indeed very high! 500,000 KW power generation, completely solve the problem of electricity consumption in the future, the significance of the same.

Li Wei is very satisfied, this miniature nuclear power plant is particularly convenient to relocate, and it does not take up much space; The performance is also super advanced, voltage/maintenance/management, all aspects do not need to be managed, and the degree of automation is high.

System introduction, this micro nuclear power plant, the voltage can be adjusted at will between 100V and 35kV, a total of five power output interfaces, wires are prepared individually.

Not only wires, but also various metal fixtures, cement poles, switch cabinets, and cables, all of which need to be prepared by Li Wei himself, and the power station only has power station equipment.

These are all trivial, with nuclear power plants, and transmission equipment is a fart? With Bitleytown, a million dollars would have been fine, but that would be a waste!

The power of the nuclear power plant is 500,000 KW, except for the electric tiger of the factory in the future, the power consumption of the town is limited, and I am afraid that the power supply is less than one thousandth, after all, there is no factory.

In the Dakiba tribe, there is a small furniture factory, or the diesel cutting machine used, the cost is high, the price of oil is definitely more expensive than the electricity bill, and the lack of electricity is very troublesome!

Installing the standard of electricity in Somalia, the price of transmission to the grid is about 35kwh / USD, 35 kWh / USD; The price of electricity is five times higher, about 7kwh/USD, which varies greatly across the country, and Kismayo is cheaper.

According to the price of entering the grid, 500,000 KW, the power generation per hour can be sold for 14,500 US dollars, at least 300,000 US dollars per day! Hundreds of millions of dollars a year!

It can be seen that the nuclear power plant is very awesome, and it can make two billion dollars from selling electricity, of course, it cannot be wasted, and it must be connected to the Somali power grid and make some contributions~

In the whole of Somalia, there is a serious power shortage, only the capital is slightly better, including Kismayo, the north, and the northwest are all short of electricity, mainly small thermal power.

For example, there is a power station in Galaslai, a small coal-fired power station, plus photovoltaic wind power, which is barely enough for urban residents, and there are frequent power outages for maintenance.

If in China, there is a power outage once a month, and the power company is also scolded as a stupid fork and dares to have frequent power outages? Each community has several busbars, and the power outage will be notified in advance, otherwise you will wait for the complaint phone to be blown up!

At present, in addition to small power plants in various places, Somalia also buys electricity from neighboring countries, but fortunately, the country's industry is basically paralyzed, and there is not much electricity to use.

Garaslai, with a power generation capacity of 3,500KW, basically meets the electricity consumption of residents, a total of 100,000 people, but even half of the factory's electric furnace cannot be supplied!

Therefore, the problem of power shortage has also seriously affected industrial development, and the lack of water, electricity, gas, transportation, and industrial raw materials has dragged down the Somali economy.

Li Wei's miniature nuclear power plant can effectively promote the economic, industrial and agricultural development of Kismayo, and he can also earn a huge amount of electricity bills, so why not?

Moreover, mastering the energy supply is equivalent to having a greater right to speak, and the officials have to accommodate you, at least the officials of the Galasle region, the attitude must be very good!

As for the specifics, go back and think about it.

Li Wei expressed satisfaction and withdrew from the system; Call the town's road construction team and ask Engineer Bashak to send someone to the vicinity of the training ground to prepare for the repair of the factory.

Nuclear power plant + machinery plant + casting plant + electronics factory four small factories, field-shaped distribution, covering an area of one square kilometer, 1000m×1000m.

The location of the factory, between the territory and the training ground, diagonally opposite the Dakiba tribe, is about eleven kilometers away from the town and the territory; It is about five kilometers away from the training ground and the tribe, and it is the intersection of the zigzag.

This place, the location is the most suitable, the noise does not disturb anyone, it is not far or close, the militia at the training ground can quickly support, and the safety is very guaranteed.

THE CONSTRUCTION OF TWO ROADS, ONE CONNECTING THE GOBI HIGHWAY AND THE OTHER CONNECTING THE TRAINING GROUND, IS ABOUT 7 - 8 KM LONG, AND THE COST IS INCLUDED IN THE FACTORY COST, A TOTAL OF 8.5 MILLION USD DOLLARS.

That's a lot of work! And it is very simple, it is to build steel-concrete ground, houses, ditches, reservoirs, as well as steel-framed iron sheet factory sheds, and install water and electricity pipelines.

Of course, according to Li Wei's needs, it is also necessary to be equipped with various fire-fighting facilities, safety facilities, protective facilities, greening garden trees and flowers, including vine walls.

The system provides a four-kilometer vine fence to surround the entire factory complex, which will be beautiful to look at, and the factory group is named by the system: Sitong Electromechanical Industrial Park.

Four factories, with a shed area of 45,800 square meters and a steel-concrete construction area of 27,000 square meters, have a huge open space, which can be greatly expanded in the future to increase the scale of the factory.

Bashak's team hollowed out the company, all the professionals, all transferred over to rush the work, and the deadline was to complete all the work within a month.

At present, the airport has been completed, with a small apron of 20×50m, a runway with a length of 800m, two blue tin hangars, and five ground support studios.

Oiling, maintenance, towers, ground support ...

The airport has strict requirements, and the pouring thickness is 30CM; The "pit" of the nuclear power unit should be 6 meters, pouring 1. 5m thick, only high-voltage wiring switchgear / control cabinet / terminal remains.

Although the power station is small, there are many power distribution equipment, Li Wei is ready to buy a full set of China's switchgear, towers, high-voltage wires and cables, fixtures, safety equipment, etc.

With such a high voltage and current, it takes several sets of lines, and it requires towers, and the poles may not work, only the cement poles for the small town lines, and the official is responsible for the construction.

According to the grid electricity price of 35kwh a dollar, the power plant is definitely not responsible for the wires, the operation department is responsible, if Li Wei helps build it, the price is different!