273 nuclear power plant starts!
The total power of turning, milling, boring, planing, drilling, grinding, drawing, cutting, welding, quenching, forging, smelting, and casting equipment in the industrial park is 82,000 kilowatts, and the total power of the system reward equipment is not high, but also 45,000 kilowatts!
The total is 127,000 kW, which is simply not enough if you use the power supply of the local power company, and the power supply in the whole city of Kismayo is not that much, only 100,000 kilowatts. Pen Fun Pavilion wWw. biquge。 info
Therefore, to operate the industrial park, the nuclear power plant is the absolute first priority, Li Wei came to the power plant and instructed the system to collect the nuclear power unit and install it in the foundation pit.
Random Mission 2 Reward: XT-001 nuclear power plant, using controllable fusion fuel rods, the shell is a super safe protective material for the overall structure, a proper black technology!
The power of the nuclear power unit is 500,000 KW, but the total volume is only 300 cubic meters.
The output power of 35kv.14200A requires ten cables with a diameter of 20 centimeters, which are connected to the power distribution system of the nuclear power plant and directly sent to the transmission tower.
The power supply of the factory also has to be transformed, which is divided into: 380V power supply / 220V lighting power supply / 10000V electric melting furnace special high-frequency power supply, with different uses.
Most of it will go to the Somali power grid!
After installing the unit, connecting the power distribution system, and debugging the intelligent control center, you can accurately see the intelligent data and unit simulation data in the monitoring office.
Power/speed/safety/core temperature/output power and voltage current/damage/distribution, as well as environmental radiation monitoring in the power plant, can be clearly displayed.
With a life span of 20 years and 8 fuel rods, it can generate electricity stably during the service life and will not leak nuclear radiation! After Li Wei completed the installation alone, he called the engineer team, Jena Little Black Boy, Yu Hao, Zaev, and others.
Arrange for workers to connect to the substation, and then solemnly admonish Zheng Bo and them: "You are all backbones, so I won't talk nonsense, this power plant is very important, and the technical content is very high, don't take it seriously!"
Everyone also has a hunch that this power plant is definitely not an ordinary power plant, with such a large area, even medium-sized coal-fired power units can't be placed, unless it's a ...
"That's right! It's a small nuclear power plant!"
"Hiss~~" "~~" "Nuclear power plant?"
Everyone was stunned and very shocked, it was really a nuclear power plant!
"Don't get excited, OK, the micro nuclear power plant has been studied as early as the last century, don't be surprised, our one is the most advanced! 500,000 KW power!"
Li Wei introduced it, illustrated and illustrated, vaguely explained the technical principle, confirmed that it was very safe, and asked the power station assembly staff to hurry up and carefully check the loopholes.
Although it is not clear what the principle is, the lines of the nuclear power plant are quickly connected, and the simulation test begins, and the large screen and partition control computer in the power plant control center show that the simulated energization is normal and the unit can be operated!
The power plant control center system consists of a large-size high-definition LCD screen, 20 computers, and electronic indicators to monitor power system data.
The engineer team, the little black boys, and the junior electricians trained by the power plant will all operate and control, and Li Wei will take Zheng Bo and others, Xiao Heizai, Yu Hao, Mayor Zaev and Ling Zhengjun to open the nuclear power unit!
Everyone gathered in the control center, and the chief engineer Zheng Bo led the technical team to start the main program, and the electronic control system drove the unit, and the nuclear power was heated up and operated.
You can clearly feel the slightest vibration on the ground, and the frequency is very high! The mineral water bottle can reflect it--- the water liquid is constantly rippling at a high frequency.
"The start was successful! The unit is running normally!"
"Core temperature 4500 / system safety!"
"The grid is energized! transformers are working..."
"Unit speed: 30 rpm... 50 rpm... The current speed is more than 100 rpm... Constant 200 rpm, the unit runs stably, and the shell temperature is 19.75 degrees. ”
"The power generation capacity is 55,000 kilowatts, 98,000 kilowatts, 194,000 kilowatts, 323,000 kilowatts, 500,000 kilowatts, and it is currently constant at 500,000 kilowatts!" Zheng Bo reported in surprise.
The total power of 500,000 KW is not particularly large, but the unit is so small in size, the power generation is so large, and the scientific and technological content is definitely quite high! Everyone is dumbfounded.
The average power consumption of the plant is 50,000 kilowatts, accounting for one-tenth of the area, and the vast majority of it is connected to the grid to supply Kismayo's electricity needs, which is of great significance.
"Constant output of 35kv.14280A!"
"The unit is working normally, the core is working!"
"The power grid is normal, the transformer is working..."
"Very good! It seems that there is no problem, the quality of the nuclear power plant should be quite good, very stable~" Li Wei nodded with a satisfied smile and praised it, chatting with everyone.
Ling Zhengjun, Yu Hao, Zaev, and the old squad leader all expressed their support in a daze, and this is simply against the sky! The power generation power of 500,000 kilowatts is more than enough for the factory.
More importantly, it is intelligent! The nuclear power plant does not require too much manual maintenance, monitoring, early warning, is very safe, and has a stable supply of several lines, and will not be broken in 20 years.
The power plant began to generate electricity, and the adjacent machinery factory, casting factory, and electronics factory were also ready to start! All the equipment was put into production, and the melting furnace began to melt metal.
For example, the 9.5mm sniper rifle can now be manufactured in large quantities, and the automatic super industrial machine that produces its own alloy and uses the system to advance the reward, can easily manufacture parts and components, and then assemble them manually.
Of course, this project is a small problem, and the bigger business project is [new machine tool project], which is designed according to the system of the industrial machine tool, and the performance is very good!
With the six-axis basic structure, high-precision components, precision stable structure, and advanced control programs, it can exceed the performance of the nine-axis linkage machine tool, turning, milling, boring, drilling, grinding, etc.
After confirming that the nuclear power unit is normal, everyone studied the relevant models, drawings and materials, and then went to the substation and distribution site to visit and inspect, and instructed the electrician to be on duty.
Now that the power plant is energized, safety must be taken care of!
Four large oil-cooled transformers regulate the high-voltage power supply of the power plant to 10,000V/380V/220V DC and AC power supply of different standards, and transmit them out.
The branch line of the town is a 380-volt three-phase four-wire ordinary power supply line, which is convenient for residents to use, and the power supply of the factory, including 220V lighting/380V power/10000V high-frequency DC source [for furnace special], has been connected.
The town's power grid and the power plant in the industrial park have repaired cement poles and connected them through a grid-connected system, and the power output of the power plant is about 3,000 kW!
Fees are settled according to the grid connection count.
After being connected to the grid, residents immediately found that the voltage rose a lot in an instant, 220 volts were stable, and the brightness of the bulb increased a lot, at least between 15-25%.
The residents of Garasley are the same, they find that the household appliances are running smoothly and the voltage is very stable, and they have heard that the power plant has been repaired in the town of Bitley, and the power will not be cut off in the future!
[Sorry for the delay yesterday]