Chapter 450: Half a Year Later...... (b)

These county-level departments are: the county party committee office, the county government office, the county development and reform bureau, the county tourism bureau, the county SASAC, the county finance bureau, the county forestry bureau, the county land bureau, the county water conservancy bureau, the county housing and urban-rural development bureau, the county planning bureau, the county commerce bureau, the county culture, radio and new bureau, the county agriculture bureau, the county transportation bureau, the county safety supervision bureau, the county environmental protection bureau, the county power company, as well as mobile, telecommunications, Unicom, postal services, etc. Pen @ fun @ pavilion wWw. biqUgE怂 ļ½‰ļ½Žļ½†ļ½

At the consultation meeting, the experts of the planning unit first introduced the overall planning and regulatory detailed planning of the Chenxi Dazhai Tourism Area in Huolongping. There are 15 chapters in the plan.

Chapter 1 is the General Principles of Planning. The content of the general provisions includes the background, nature, scope, duration, basis, guiding ideology, planning principles and technical route of the plan.

Chapter 2 is fundamental analysis. Including basic overview, resource analysis, market analysis, and SWOT analysis.

In the basic overview, the location, natural environment, history and humanities, social economy and tourism status are briefly introduced.

In the resource analysis, the types of tourism resources are introduced, and the Chenxi Dazhai tourist area, Baijia bamboo forest, Longhe, Sanwan waterfall pillar and the rhododendron forest and jar hole on the four sets of the single evaluation score, because the Chenxi Dazhai maintains the ancient style and the original building, there is no man-made destruction, there is no modern cement house, and the national culture has a far-reaching origin, it has more than 90 points, and it is set as a five-level tourism resource. Baijia Bamboo Forest, Longhe River, Sanwan Waterfall Pillar and Rhododendron Forest are designated as fourth-level tourism resources, and Tanzidong is designated as third-level tourism resources. In the resource competition analysis, the homogeneous resources and peripheral resources were analyzed in the form of tables. At the same time, the resource development orientation has been clarified, and the development direction of ecological tourism, leisure and vacation, rural folk customs, adventure experience, sports and entertainment has been initially established.

In the market analysis, it is analyzed from three aspects: the change trend of the tourism market, the analysis of the potential source market, and the analysis of the segmented source market. A SWOT analysis is all about analyzing strengths, weaknesses, opportunities, and challenges. The plan clearly points out that the biggest disadvantage of Chenxi Dazhai Tourism Area is location and transportation.

Chapter 3 is the development strategy and development positioning. In terms of development strategy, the strategies of ecological introduction, key breakthroughs, cultural shaping, and industrial linkage are clarified, and in terms of development goals, the overall goals and phased goals are clarified. The overall goal is to be an eco-sightseeing folk leisure and vacation destination. Staging targets are divided into short-term, medium-term, and long-term. The short-term goal is very clear: to build a national 4A-level scenic spot, in terms of market positioning, the target market has been established, and the market has been predicted. In terms of the theme image, the preferred image was drawn up: the mystery of the morning stream, the dream scenery. Alternate image: The mountains dance with fire dragons, and the morning stream is like a dream. At the same time, many tourism slogans have been drawn up: travel all over the river and the north and south, it is better to come back to the morning stream, the millennium morning stream village, a folk sketch and so on.

Chapter 4 is the spatial layout. In terms of space, from the aspects of entry, guidance, connectivity and functional zoning linkage, five groups have been clarified, namely, Chenxi Dazhai to Baijia Bamboo Forest Group, Baijia Bamboo Forest to Shangsitai Group, Rhododendron Forest to Tanzidong Group, Sanwan Waterfall Pillar Group, and Longhe Group. The Sanwan Waterfall Pillar and the Dragon River are a single group. At the same time, it is also divided into several groups from the area, namely five groups: eye-catching sightseeing, forest health preservation, culture and leisure, green food, and adventure and recreation.

Chapter 5 is the tourism development project. According to the phased goals, engine projects, key projects, and general projects were established. The engine project is Chenxi Dazhai, and the key projects are Chenxi Dazhai, Baijia Bamboo Forest, Rhododendron Forest, and Sanwan Waterfall Pillar, and the general project is Tanzidong and Longhe.

Chapter 6 is the tourism product system. The product development ideas and product pedigree have been drawn up, the key tourism products have been clarified, and the regional and internal tourism routes have been designed.

Chapter 7 is Marketing. Marketing objectives and diversified marketing strategies were drawn up, as well as image construction and festival activity rendering. Diversified marketing strategies include product strategy, price strategy, channel strategy and promotion strategy.

Chapter 8 is the planning of tourism industry elements. Focus on tourism transportation, accommodation and catering, tourism shopping, leisure and entertainment planning.

In terms of tourism transportation, external transportation, transportation in scenic spots, supporting systems and distribution systems are planned, and in terms of accommodation and catering, hotels, guest houses, inns, cabins, forest houses and special catering and cuisine are clarified. In terms of tourism and shopping, it is clear that the establishment of production enterprises, the development of tourism commodities and the setting and construction of shopping places are clarified. In the leisure and entertainment, live performances, folk displays, agricultural activities, etc. were proposed, and it was boldly proposed to set up an original ecological bar street integrating shopping, leisure, catering and entertainment in Chenxi Dazhai, and set up a folk display, farming culture and entertainment experience corridor on the long distance from the hundred bamboo forests to the top four platforms.

Chapter 9 is the integration of the tourism industry. Focus on planning the integration with the local planting, aquaculture, tourism real estate, commerce and other aspects.

Chapter 10 is the planning of the tourism public service system. The construction of tourist service center, the construction of smart tourism system, the interpretation system of tourism signs, the construction of tourism sanitation facilities, the safety rescue system, and the self-driving tour service system are planned.

Chapter 11 is infrastructure planning. Water supply engineering, drainage engineering, power engineering, logistics services, fire protection engineering, garbage disposal, etc. are planned.

Chapter 12 is environmental protection planning. Two aspects are planned: the protection of the natural environment and the protection of history and culture. The natural environment is mainly the protection of the natural ecological environment and the environmental protection during the construction of scenic spots. Historical and cultural protection is mainly the protection of historical relics and folk culture.

Chapter 13 is the construction of the security system. It was planned from five aspects: institutional mechanism, policies and regulations, human resources, fund utilization, and tourism safety.

Chapter 14 is the plan for immediate action. Planning was carried out from four aspects. The first is the action plan of the government departments in the near future, which has drawn up institutional mechanisms, market operations, start-up publicity, regional cooperation, talent construction and system construction. The second is the action plan for the construction of tourism projects in the near future. The third is the action plan for the recent industrial elements, including transportation, accommodation and catering, commerce, leisure and entertainment, etc., especially the detailed planning of the exit road and regional link road for transportation construction. Fourth, the brand promotion action plan.

Chapter 15 is the evaluation of investment returns. The plan puts forward the overall scale of investment and the step-by-step investment plan, and analyzes the economic, social and environmental benefits of the operation of the scenic spot. Finally, the sequence of the project content of the construction of the scenic spot was arranged.

After the planning team introduced the plan, the heads of each department made active speeches according to their respective functional characteristics. Zhang and Wang, deputy county magistrates of the county government, and senior directors of the organization department of the county party committee also spoke.

After soliciting opinions, the planning team communicated with Jiang Wenwen and Tian Limai to make revisions according to the amendments proposed by various departments. After that, a symposium was organized and held for local so-called "celebrities" and "celebrities" to solicit their opinions. After several round-trips, the plan was finally finalized, and now it is time to submit it to the county and state tourism administrative departments to organize expert review.

When I went to work in the afternoon, the discussion meeting on planning was held on time, and my sister Tian Liyu was not notified to participate, but after my sister Tian Liyu heard about it, she took the initiative to find Tian Limai and asked to participate, she said: "Brother, this is a good learning opportunity, the last few meetings for consultation were held in the county, I did not participate, but today I can no longer miss it." ā€

Tian Limai had no choice but to agree to her sister Tian Liyu's request.

The meeting was presided over by Tian Limai himself, and after he said a few opening remarks, he asked Jiang Wenwen's opinion and said: "Chairman Jiang, let everyone say it first, and you say it first?"

"Mr. Tian, this is a discussion meeting, whoever has a suggestion can say it, and there is no need to divide it into any order. Jiang Wenwen said.

Song Qinqin's eyes were still on Tian Limai's body, this Song Qinqin had been talking to her once since the signing of the contract to go to Shangsi in the middle of the night, Jiang Wenwen talked to her once, because it was an emotional matter, Jiang Wenwen said half seriously and half jokingly: "Song Qinqin," Jiang Wenwen directly called Song Qinqin's name, and did not call him "Song Dongzhu" as he usually discusses work.

"Song Qinqin, Tian Limai is mine, you have already seen it in his house, the people in their family have recognized me and accepted me, I call Tian Limai's family the same as Tian Limai, he calls him Dad, I also call Dad, we have already made a marriage, so, don't be affectionate to Tian Limai all day long, otherwise, what kind of conditions do you want, what are your requirements? You tell me, I'll pay attention to it again, and take you to introduce!?" Jiang Wenwen said.

But Song Qinqin really seemed to be determined to pursue Tian Limai, she also said with a smile: "Chairman Jiang, you shouldn't stop me, you have to have confidence in Tian Limai, I chase him, this is a test for him, if he agrees to me, it proves that there is no real love between you, Tian Limai's so-called 'love' for you in the past is just perfunctory to you!"

Jiang Wenwen listened to Song Qinqin's words, she was a little annoyed and a little ridiculous, what kind of crooked reasoning did Song Qinqin say?

"Song Qinqin, what kind of theory do you have? According to what you say, I have to thank you for the person you chased me?" Jiang Wenwen said.

"Chairman Jiang, that's not necessary, but we can make some words clear, my pursuit of Tian Limai is my freedom, you can't think that you are my boss, you are the chairman of the board of directors to suppress me to pursue him, this is not right, the rights of our lovers are equal, as long as Tian Limai does not form a legal husband and wife with you, I have the right to pursue him, and this right is also protected by law. So, Chairman Jiang, you can't stop me, and you don't have the right to stop me. Song Qinqin said.

Song Qinqin's words do sound reasonable, but if you think about it, it is suspected of being unreasonable. Jiang Wenwen really had no way to take Song Qinqin, Jiang Wenwen had no choice but to say: "Song Qinqin, I don't care what Tian Limai thinks, but there is one thing you should pay attention to in the future, that is, you can't go against ordinary people's practices and come to some excesses, such as what you did on the fourth stage, I don't think it's advisable, you want to impose your love on others, if you do this, you are not pursuing, let alone love, you are forcing others, you are imposing your so-called 'love' on others, think about it, are you still love." Therefore, I suggest that you treat your so-called 'love' sensibly in the future, in fact, if you adopt this way, it will only make Tian Limai disgusted and disgusted with you!"

Song Qinqin smiled and said, "Chairman Jiang, thank you for the reminder, but everyone has their own way of getting feelings." ā€

Song Qinqin said this, but after that conversation, he really didn't take unconventional methods for Tian Limai, but often expressed his love to Tian Li, intentionally or unintentionally, but Tian Limai still rejected Song Qinqin thousands of miles away, and sometimes didn't even look at Song Qinqin.

After the discussion began at the meeting, Guan Junping spoke first, he said: "I only want to say one point, that is, the safety issue in the planning, I think the Sanwan waterfall pillar should be highlighted. ā€

Tian Limai said with a smile: "General Assistant, this plan is very full of safety issues, are you worried about the safety of the Sanwan Waterfall Pillar during the construction period? ā€

Wang Changcheng also spoke, he said: "I feel that the evaluation of the jar cave in the resource evaluation is not accurate, in addition to the characteristics and characteristics of the karst landform cave itself, the altar cave also has an important point is that it has culture and stories, especially the traces left by those who 'boiled' people, as well as the local legends about the 'evil' nature of the jar cave and so on." I believe that the planning team only took into account the characteristics of karst caves in their evaluation, but did not consider their cultural origins. ā€

Tian Limai listened to Wang Changcheng's speech, nodded, and felt that what Wang Changcheng said was very reasonable.

Next, Song Qinqin, Li Meimei, Yang Cuo, Qin Guozheng all made a speech, especially Song Qinqin's speech is even more wonderful, she said: "This plan, done more comprehensively, also reflects our owner unit, especially the chairman of the board of directors and general manager of Hetian Some ideas and ideas, but I always feel that there are some defects, especially the planning of Chenxi Dazhai seems to be integrated, the repair and transformation of the house building is not clear enough, although also designed several renderings, but I think it is right. The elements of the 'dry-bar' architecture are not used enough and are too Westernized. She also said: "For the construction of 100 bamboo forests, the culture of 'bamboo' is too little, and 100 bamboo forests are in 'bamboo', if the bamboo culture cannot be rendered, then even if the 100 forests are built into scenic spots, it is a failure." ā€

After everyone spoke, her sister Tian Liyu also spoke, she did not speak too much language about the construction of the scenic spot, she focused on the theme image and image slogan to speak, and also made up a few image slogans.

Everyone spoke, and Jiang Wenwen and Tian Limai also expressed their own thoughts. In the end, the two decided to refer some of the issues discussed at today's meeting to the Planning Group for appropriate revisions.