760 is better
This is indeed the most important thing, if this time he asks for qualified, the other floors, we can also make our own decisions, naturally we can finish this building. As for what Zhang Gong said, we don't understand, but squad leader Liu knows some, after all, people have been working on the construction site for a long time.
Able to take us and that Master Li to fix everything as for the frame again, and then Director Liu said that basically there is no problem, let's go down, if he comes to accept, we have to wait, otherwise we can go home now, at this time, I saw a few cars coming in at the door, and some people got off the car, and then Zhang Gong won.
They said something there, and then Zhang Gong led them to this floor, they went around here, and then looked left and right, in fact, they didn't say anything when they were upstairs, they went down, and we followed directly down in the future.
Say they talk, we can't go to the side to listen, because after all, there are some places that are inconvenient for us to know, so they can talk there for about 20 minutes, and then they drove away, Zhang Gang came back and said to squad leader Liu, it seems that some things have to be dealt with like this, as for the framework you made, even if you pass it today, but my brother may also need to arrange it, this is an inevitable phenomenon, and we can't change it.
In fact, according to this calculation, squad leader Liu said that this is the case, let's go back first, you have to hit the concrete tomorrow, maybe we can't come to work, so Xiao Wang, you can rest.
Zhang Gong said that it seems that this is the only way, these workers can't work overtime tonight, if they work overtime, they may be able to beat him in one day tomorrow, but according to the current situation, we can't do this.
Because after all, if you finish beating the concrete tonight and tomorrow, then you can't do the work for the night time period of your frame, and the old squad leader said that if some things appear, we will have to do it, but at this rate, we don't need to work at night, so you just follow the normal plan, and then start tomorrow during the day.
Zhang Gong said that for this bricklayer class, in fact, in fact, their time period tomorrow may be more important.
Squad leader Liu said that is their problem, I don't mean that I don't care about this, in fact, in fact, the foreign teacher class and our carpentry class actually have nothing to do, this relationship, after we finish it, they can do this, that is, it's over, as for the steel class, some things have to rely on you to deal with, we can't talk to them directly, so that Liu squad leader and some of his workers are off work.
Zhang Gong and I went directly back to the position where Master Ma was working, Master Ma said that this flexible work is indeed very laborious, some places are not at all human power, you say that there is no miracle in the construction site now, if there is a small forklift, you say that it is not very convenient to clean up, Zhang Gong said.
If there is a machine, in fact, we are all worry-free, but there are some places that cannot be cleaned by machines at all, so it is necessary to rely on labor, so everyone will be more tired.
The teacher doesn't say that some work is not a question of whether he is affected or not.
As for the materials on the construction site, in fact, in fact.
We didn't plan it when we first rested, and if it had been planned in the position he had specified, then now the workers basically don't have any big work, which is good, do you see that pile of stones? That place has been hinted at now, so this afternoon you see those workers exhausted the stone, the whole thing was pushed by a cart, so for this site is actually still our calculations, not calculated to understand, Zhang Gong said that at that time, in fact, when the main building was not up, the position was not quiet, besides, as for the drawing, we only took the sketch.
In fact, the problem is that they want to contract the project, and they are in a hurry, if a construction site is to do the preparatory work in front, then it is much easier for the workers to work.
Because this boss Zhang was bound to get the project in his hands, he only signed a superficial contract at that time, and he didn't solve the substantive problem, so he sent the workers to the construction site.
Therefore, for his construction site, in fact, the personnel allocation is now insufficient, but the workers here are essentially unable to be transferred, after all, it is a new number.
Therefore, he thinks that both houses are like this, and in this case, for this person, in fact, the degree to which they can do their work is this intensity.
Because now the people led by Master Ma are not only those who drive the mixer, and then those who have made meritorious contributions, but there are not too many people in essence.
There are only about 20 people to do these jobs on such a large construction site, but in fact, it is still far from enough.
For the deployment of personnel, they can't deploy it, so it's the same.
At this time, the bad master came over and said, today is not dry, about to eat, in fact, in fact, everyone knows, it is really about to get off work, Zhang Gong said so, now get off work, early today, tomorrow after you get up to hit the concrete, as for the angle of the concrete on this floor, we have to be perfect, can not be like the next layer of time, and then there are other problems, if there is a problem again, then we will hold who is responsible, last time my brother said it, just not scum, at this time Master Ma asked Zhang Gong said。
As for the young man you brought, is he a relative of your family? Zhang Gang said that if he were my relative, could I arrange for him there? He is the child of a family in our village, and his parents are sick, and his father