Chapter 1025: Rob Well No. 2 Water Source

"Is the Tarim River really rich?"

Li Feiteng ignored this group of foreign desert experts, since the 60s, the inland has risen to the development plan of the Lop Nur oasis area, chemical plants are opened here, the population reached more than 100,000 people at that time, people blindly increase the water use of cultivated land, blindly build reservoirs to intercept water, blindly dig embankments to divert water, After blindly building a pumping station to pump water, the current Lop Nur became Lop Lake, and people desperately asked for water resources from the Tarim River, and finally turned this oasis, a green forest with 7.5 million acres of poplar trees into a desert bordering the Tarim Desert.

When they came along the way, they were able to see so many abandoned reservoirs that it was maddening.

Before he came, he had seen a map of the history of Lop Nur, and it could be said that it was an oasis of dense forests eighty years ago, but now it has become a sea of death.

If we continue to rely on local water resources for greening, it will undoubtedly cause a greater burden.

Li Feiteng did not take their construction, but returned to Yanjing after some inspection.

As for the problem of the Tarim Desert's strict refining, the most crucial thing is the construction of water conservancy projects, and Li Feiteng has already thought of a way in his heart.

In his heart, he decided to contract a thankless project, even saying that he would make everyone think he was crazy.

South-to-North Water Diversion on the Western Route.

The South-to-North Water Diversion Project is a mega project that everyone knows, but the South-to-North Water Diversion Project on the Western Route is probably not known to many people.

The south is flooded, and the north is dry.

The engineers of the western route diverted water from the upper reaches of the Yangtze River to the Yellow River, and built dams and reservoirs on the upper reaches of the Tongtian River in the upper reaches of the Yangtze River, the Yalong River and the Dadu River, tributaries of the Yangtze River. The elevation of the dam site is 2900-4000 meters. A diversion tunnel is used to divert water into the Yellow River through Bayan Kala Mountain, the watershed of the Yangtze River and the Yellow River. It is a cross-basin water diversion project that diverts water from the main and tributaries of the upper reaches of the Yangtze River to the upper reaches of the Yellow River, which can supplement the shortage of water resources of the Yellow River, solve the drought and water shortage in Northwest China, and promote the management and development of the Yellow River.

This project has been surveyed and explored by the Ministry of Water Resources since 1952, but it has not been started.

Countless people were looking forward to this project, and in 1987, the project began to study a plan, which took about ten years later. In 1996, it entered the planning stage.

By 2001, the way of water delivery, including the idea of the project, had changed, but the detailed planning of the first and second phases of the project had begun, and now the state has actually made all the plans.

However, with a budget of more than 300 billion yuan, or even higher, who will pay for such a large amount of money?

Anyway, it's not just a casual start, it's because of the problem of funds.

All the results of this project. All of them were stranded, and a large pile of materials was placed in the water conservancy project warehouse. For Li Feiteng, what he wants is to try to see if he can rush the start of this project.

For this reason, Li Feiteng went to the Ministry of Water Resources again after returning, and after a week of meeting and discussion, in the end it was still fruitless.

The reason is very simple, such a big project, even if you have the money to get it, it is not so easy.

"Chairman, Rob Well No. 2 is currently the first phase of the water source that can be used as the water source of our Desert New Town. ”

"Okay, I'll check it out right away. ”

After Li Feiteng got the news, he took a helicopter to Luobu Town, where there is a special research institute in Luobu.

Zhang Guomin, the person in charge of the research institute of the local hydrogeology brigade, was very excited when he saw Li Feiteng.

"Mr. Li, I'm really excited to meet you here. ”

"Captain Zhang, let's go see Rob No. 2 Well. ”

Everyone got on the off-road vehicle and went to Rob No. 2 Well.

After arriving at the place, an artificial lake of about 200 square meters appeared in front of them.

After Li Feiteng got out of the car, he walked to the lake, picked up a handful of clear lake water with his hand, washed his face and stood up.

The wind blew him very cool, and the responsible Zhang Guomin in the back walked up.

Zhang Guomin said: "Mr. Li, the Luobu No. 2 well is an artesian water well in 2000 after we drilled down 250 meters, with a daily output of 2,100 cubic meters, and the water quality has reached the standard of industrial water, and it can be used as an excellent desert water source after a little processing." ”

"How many wells have you drilled here at Luobu Lake now?" asked Li Feiteng.

"There are 5 wells, the first is in the Archie Valley, 35 kilometers away from here, the water output is very small, and now it has dried up, and the third well is in the Huluba depression, the well is 100 meters deep, and the daily water output is 732 cubic meters. ”

"How much water can I get here?"

"At present, three of the five wells can supply an average of 5,000 tonnes of water per day. ”

Li Feiteng stayed in Luobu Town for three days, and after discussing and studying with the local municipal government and the Mining Bureau, he decided to establish a total of industrial water transmission and processing plants in Luobu Lake, with an investment of 30 million yuan, and first use three locally drilled water wells, with the goal of using water from here to the Loulan site of about 86 kilometers within two months.

With an average of 5,000 tons of water per day, the water processing can reach at least 3,000 tons, and at present, the Luobu Lake well can supply 20,000 workers with basic living water, but if you want to truly restore Loulan into an oasis, you really need a greater investment.

After the water source of Loulan New Town was temporarily solved, the construction of the new city began on a large scale.

Huaxia Yigang Group began to manufacture 100 kilometers of water pipelines non-stop, and the 100 kilometers of water pipelines cost 30 million yuan, because the first batch of about 1,000 Indian laborers have arrived in Ruojiang, so the cost of laying pipelines by hand has been reduced, and the laying of one kilometer is about 14,000 yuan, and it will be 1.4 million to 1.8 million yuan after all the laying is completed.

In other places, such a project may be a simple matter, but in the desert no man's land it is very difficult and the cost is very high.

Forklifts, trucks, cranes, sand pushers. as well as the establishment of a maintenance station. Wait a minute. The establishment of the first phase of the water plant for domestic water sources consumed about 200 million yuan of Li Feiteng's budget.

The most important thing is that a qiē is just the beginning.

The construction budget of the water plant is 360 million yuan, and it can be completed.

After the establishment of the water plant, the urban area was also established with the Loulan site as the center.

This time, after consulting with desert experts and companies from the world's most advanced water recycling systems, Li Feiteng chose to use the ground moe method to reduce the flow of water. The ground moe is covered with plastic about 26 to 35 meters underground.

As we all know, plastic is cheap, and more importantly, it is difficult to decompose, and after covering it in the ground, it can prevent the loss of moisture.

Of course, it is not enough to sprout on the ground, but also to build a glass greenhouse within a certain range, and cultivate green plants in a relatively closed space through guò.

In this project, Li Feiteng invested 200 million yuan.

200 million RMB includes the establishment of a glass processing plant in the surrounding area, and there is no shortage of the main materials for making glass in the desert. It can be said that in addition to the problem of energy, other raw materials are inexhaustible.

Water Plant. Glass processing plant, solar power plant, wind power plant, after Li Feiteng threw money, the four projects began to be built together in the desert.

Such a project in the desert was very expensive at the beginning, because the transportation cost of transporting water and materials alone reached a point that was difficult for ordinary people to accept.

But for Li Feiteng, he doesn't care about any of this.

The first to be completed was the power plant, which was the most basic construction for the new city.

About 10 kilometers away from Loulan, the power plant base built with steel keel, each foundation extends down 800 meters to 1,000 meters, the construction of the windbreak wall can resist the attack of wind and sand, in a radius of dozens of acres, all are placed with solar panels imported from magnesium countries, but the extension is unlimited reinforcement, according to Li Feiteng's imagination is to provide at least 1 million kilowatts of total installed power transmission capacity after one year, and increase to 10 million kilowatts in ten years.

If electricity starts in three months, it will be able to provide about 10,000 kilowatts.

The budget for this project is 30 billion yuan.

When Li Feiteng's new city plan was announced, everyone thought he was crazy, a madman.

Because just the major projects he is currently doing will invest more than 10 billion yuan every year, that is, more than 1.2 billion US dollars.

But for Li Feiteng, this is one-tenth of his annual income.

By the time of the National Day in 2006, Loulan New Town officially entered the era of hydropower under the personal command of Li Feiteng.

On the Google satellite map, almost every day this place is changing dramatically, 8,000 workers from India, as well as Huaxia's own workers, a total of 13,000 people are working hard for the construction of Loulan New City.

In addition, Li Feiteng uses all the world's most advanced industrial science and technology, and there are all the machines you can imagine here.

The oil consumption of Loulan New Town is also very large, at least at this stage, gasoline is used to generate electricity, and in Saudi Arabia, Li Feiteng's private island, an investment of 200 million oil wells has become a basic guarantee for the construction of Loulan New Town.

But it's all an industrial change.

In the midst of the construction of Loulan New Town, Li Feiteng led a group of desert experts to a huge dome tent made of glass.

If you look at it from the plane, this glass tent is all transparent, with a radius of 80 meters.

It can be said that this is like a super large glass cover in the desert.

The most surprising thing should be that under the glass cover, there is a dense grassy forest.

This is a 20,000-square-meter desert green area where the world's most survivable plants are grown, and they have grown to this point in just 58 days.

Li Feiteng walked in with everyone, and he could feel a completely different feeling from the outside, although it was also hot, but it was a moist feeling, as if there was a lot of moisture in the air. (To be continued......)