Volume 3 Chapter 181 The key is speed

Regarding Feng Xiaoting's worries, Li Sheng felt that he couldn't be unguarded. Pen ~ fun ~ pavilion www.biquge.info he thought for a while and made some decisions in his heart. Still, he asked, "And what do you suggest?"

"Let's do some experiments to see how valuable the technology is. The higher the value, the higher the risk of the technique, but the bigger your hole cards. ”

Li Sheng also thought so in his heart, so he nodded, agreeing with Feng Xiaoting's suggestion.

Feng Xiaoting said: "Experiments cannot be left in the laboratory to complete. ”

Li Sheng looked at him and said, "Are you worried about other people?"

"Now I'm worried that you're going to kill someone. Feng Xiaoting said with a smile. But he immediately retracted his smile and said. "Who do you think you can trust about this?"

Li Sheng smiled. This thing may indeed be very profitable, but it is not something he can't give up, and there is no need to do things that may not be in his heart. He asked, "If not in the lab, where?"

"If it's an experiment that you want to test efficiency, it's not complicated, just find a hidden place to store it after you're ready for the experiment. This means let Li Sheng decide for himself.

Li Sheng thought for a moment and said, "In that case, use the cellar under the villa." ”

"Then I'll go back and prepare. I need more material though. "Of course, the material that Feng Xiaoting said is that kind of water.

Li Sheng nodded and said, "You come to pick it up tonight." ”

These words made Feng Xiaoting have some thoughts in his heart. He felt that it might have been deployed by Li Sheng, or that he had accidentally obtained it from somewhere.

As soon as it was dark, Feng Xiaoting came to take the water that Li Sheng took out of the space. The next day he came with some cylinders with a volume of about ten liters, and there were more than twenty of them.

The two sent the cylinder into the cellar, Feng Xiaoting took out a stack of paper and said, "Boss, I won't save the electronic version of this experiment." It is only a record of the experimental conditions in each cylinder. You keep it. ”

Li Sheng took it and took a look, which recorded different air pressures, filled gases, and some recorded what was put in.

He skimmed it and asked, "How long will the experiment take?"

"I don't know. Now there is no data, and I don't know how long these substances in the water can sustain the metabolism of bacteria in the water. ”

Li Sheng nodded. put the material directly in the cellar, and then walked out of the cellar with Feng Xiaoting.

Feng Xiaoting didn't stay long, just said some questions about this experiment and left.

……………………

This year, their project is mainly to build a warehouse with a storage capacity of more than 3 million cubic meters for Silent Farm, and because Almerin's company is not confident enough to meet Li Sheng's requirements for the construction period, the excavation of the artificial river and the construction of a bridge across the artificial river have been abandoned, and Li Sheng finally decided to hand over these two projects to their company.

The warehouse is still a modular building. When the farm was in the rainy season, the company did not leave Brazil, leaving behind many people to make modules in the south of Brazil.

The rainy season is not over yet. But the rain has been much less. The people of this company are starting to build the foundation on the farm.

The warehouse project schedule is very tight. Li Sheng demanded that all the warehouses be completed by the next rainy season. Although they have been cooperating for more than two years, Li Sheng is still not completely assured.

The company's work on the farm has changed its head this year. The current person in charge is one of the directors of the previous project.

The young man, who has been promoted to project manager, has been working at Silent Farm for more than a year, and is basked by the sun here like a black man.

Li Sheng drove a helicopter to the construction site and saw that tunnels had been excavated on the ground, and some pile drivers were also working. And some huge modules are coming in a steady stream.

He found a place to land the plane.

Ning Yanping had received a call from Li Sheng before this, so he had been waiting at the construction site for a long time. Seeing Li Sheng's plane landing, he drove over in a pickup truck.

After picking up Li Sheng to the construction site, the two got out of the car. Ning Yanping said: "Now the project is proceeding according to our scheduled plan. A large number of components are being loaded on the south side. Twelve warehouse load-bearing piles have been laid, and it is expected that the construction of the above-ground buildings will begin in two weeks. ”

Li Sheng saw the long strips stacked on one side, which should not be columns, but more like the support beams used for viaducts. He couldn't help asking, "These components don't seem to be the same as before." ”

Ning Yanping said with a smile: "Because this time the building is larger than the previous one, and there are more floors, the foundation needs to bear more load, so these load-bearing beams are larger than the previous batch." ”

Li Sheng suddenly said: "I thought this was a load-bearing beam on the floor, and I was worried that it would increase the weight." ”

Each of the warehouses to be built on the farm this time will have a floor area of more than 5,000 square meters, and each floor will be four meters high, with a total of 10 floors. The building is built in a modular way, which has the advantage of being fast and fast, but the disadvantage is that the degree of stability is relatively poor. If the weight of the building is too large, he is worried that there will be quality problems.

"It is precisely because of the increase in the weight per unit area of the building that the weight and volume of some of the floor load-bearing beams will be larger than before. Ning Yanping said with a smile. "Mr. Li, you see, the floor slabs and load-bearing beams that have been delivered over there. ”

As they walked over, Li Sheng found that some of the load-bearing beams were indeed relatively large. But it's more of a little smaller than the previous one. However, the width of the floor module seems to be a little smaller. The previous batch of warehouses should be two meters wide, and these are only about one meter three or four.

He asked the question. Ning Yanping said: "In terms of design, the warehouse capacity of each floor of the warehouse is relatively large, so we redesigned the floor load-bearing system. These small load-bearing beams would span between the two large load-bearing beams at a distance of only one meter and twenty meters, so the width and length of these floor modules were also redesigned. ”

Li Sheng followed him around, and found no problems, so he said to Ning Yanping: "I am very satisfied with the progress here. Now it's inconvenient to take me to the new pier island to have a look?"

Of course, Ning Yanping couldn't refuse. Li Sheng drove the helicopter to the settlement of Sipalu Town, which already has a certain scale. He found a flat place on the edge of the terrace to land, turned off the engine of the helicopter and jumped off the plane, he asked Ning Yanping: "I just saw on the plane that the artificial river has been dug for a long time, how deep has it been dug now?"

"Three kilometers and five hundred meters long have been excavated, with an average of five meters above the ground. However, this depth is very rich in groundwater, and the progress of the project will be much slower. We're figuring out how to speed things up. ”

Nearly five meters have been dug, and this speed is indeed not slow.

The two walked off the stage to the artificial river that was being excavated. Li Sheng saw that the excavated river channel was full of water, and hundreds of excavators were digging on the land on the small islands. But this method can't dig deep.

"I can't use an excavator anymore. Seeing this, Li Sheng couldn't help but be a little worried that the schedule could not keep up.

Ning Yanping nodded and said, "That's true." It's still a percussion plain, and it's the rainy season, and the groundwater is so abundant that excavators can't work in the water. However, we were able to mobilize some boats and excavators. When the boats arrive, we open the downstream openings of the artificial channel and allow the boats to enter the artificial channel for construction. ”

Li Sheng nodded and said, "I hope you don't miss the construction period." ”

"The deadline was really tight, we needed to dig the channel to a depth of 10 metres before the water level dropped in the dry season, and we also had to build piers downstream of the artificial channel. If the deadline is not met, the piers may need to be constructed in the next dry season. ”

Li Sheng shook his head and said, "That's absolutely not good." The artificial river must be completed within this year, and the piers must be completed this year. ”

"Mr. Li can rest assured that our company has mobilized enough forces to come to Silent Farm this month, and the project will definitely be completed on time and with quality. ”

Li Sheng thought for a moment and said, "That's good." ”

"By the way, I would also like to thank you for the help you have given to the residents. If it weren't for the workers' sheds you built, they would definitely be living in worse conditions than they are now. ”

Ning Yanping said with a smile: "Mr. Li is serious. That's just our job. "Li Sheng also has money for those workers' sheds.

Li Sheng smiled and said, "Silent Farm has maintained a cooperative relationship with your company for several years, and I hope that we will still have the opportunity to cooperate in the future." He thinks maybe next year there will be a big project on the farm.

"I hope so. Although Ning Yanping is only a middle-level cadre in the company. But if Li Sheng can continue to cooperate with their company, it will be due to him, because it means that Li Sheng is very satisfied with their work.

Li Sheng nodded, looked at the muddy water in the artificial river channel and said, "Just now, when the plane passed by the construction site of the two factories, I found that ground buildings were already being built there. How long will that take to complete?"

"It's only the first floor, and I think it will take about a month to finish. You know that nowadays all building materials need to be transported by boat. Capacity is still relatively tight. ”

Li Sheng nodded and said, "That's true." But I hope that those two projects can be completed as soon as possible without sacrificing safety and quality. We need those buildings now. ”

The factory he said was actually a Cordyceps breeding factory and a stone frog farm. The scale of both projects is not small.

It took Li Sheng a few days to deal with all the things that needed to be solved in the near future. More and more workers are working and more and more families of workers are relocating to the town of Sipalu. To settle the lives of these people, although Li Sheng does not have to deal with it personally, he also needs to pay a lot.

Then there is the reception of the engineers of the wind power supplier who came to inspect the construction site. On the one hand, it is also necessary to pay attention to the changes in oil prices and operate crude oil futures through Luo Zheng.

For a moment he felt like he was busy with a spinning top.

And that's not all. Thomas told him that someone from the Brazilian Ministry of Agriculture had arrived, and that the person who had come was quite high-level.

The government is coming, and Li Sheng can't be lazy anymore. (To be continued.) )