Chapter 204: Pointing the Fingers
Not only did Anna, the incomparably beautiful blue-eyed beauty, shock the villagers, but also the big guy Lars! The villagers of Linjiang Village have never seen such a tall and strong person as Lars in their lives! So they all wondered what these foreigners were here for.
Looking at the car that slowly stopped, the heart of Huang Yuanfu, the village party secretary, jumped. He had already received a notice from the township, saying that the boss who came to buy the land last time was going to come to see the land again, and he was immediately busy, making the village a burst of chickens and dogs. Who knows, this preparation has not been completed, and the car has arrived.
Seeing several other village cadres standing beside him in a daze, looking at those foreigners, Huang Yuanfu was angry, turned his head and scolded in a low voice: "Are you stunned to find death?" Don't hurry up and prepare. ”
Seeing their virtue one by one, Huang Yuanfu, the village party secretary, scolded in his heart, these guys usually jump like donkeys, but when they encounter a big scene, they are all wilted like Wang Ba, and it is useless. However, he himself is actually in a panic now, and he doesn't know how to receive this big boss, especially a few foreigners.
Getting out of the car, Anna and Lars looked curiously at the surrounding Qiē, including the villagers.
In fact, Huang Yuanfu has been quite conflicted about the construction of a concrete mixing plant on the land, it stands to reason that if the land is occupied, not only will the village get a large amount of money, but each household can also get compensation, and the people in the village can go to work nearby, and the income will definitely be good, especially the village cadres. But he also heard that the concrete batching plant is very polluting to the surrounding environment, and the ash can float hundreds of meters away.
However, this is not something he can decide, the township attaches great importance to this project, and I heard that the township chief secretary will come today, just because there is a meeting. It was a little late, so Huang Yuanfu greeted him warmly, and then said, "Mr. Li, are you here to see the land?" ”
"yes. Today, we invited technical experts from foreign concrete machinery suppliers to plan and design the concrete batching plant, and soon a modern concrete plant will be erected on the riverside. Li Ruoyu said with a smile.
Huang Yuanfu hurriedly said: "Ah, there are experts from foreign countries, and we are not prepared for this!" ”
Li Ruoyu smiled: "Huang Zhishu." It doesn't matter, they just have to go to the field and take a look, and then leave. ”
Huang Yuanfu rubbed his hands and said, "How can this be done?" The visitors are guests, not to mention foreign guests from afar, so they have to eat with us, and we are all ready. Today, the secretary of the township and the head of the township are also coming. ”
Li Ruoyu thought for a while and said, "Okay, let's trouble Huang Zhishu to take a look with us." ”
Huang Yuanfu nodded, and then took Li Ruoyu and them to walk to the riverside.
Now it's still the same place, it's a wasteland at all, Anna said in surprise, "Lee." Are you sure to build a concrete batching plant here? It looks like a barren land now! It seems that the river is also made of alluvial sediment, which should be very soft. ”
A technician took over and said, "Yes, if you have this kind of soft soil, you have to do a lot of replacement work. It is necessary to remove the surface plants and floating soil, and then pave dozens of centimeters of gravel after replacing the filling, and roll it with a road roller, so that the construction period is relatively longer. ”
Li Ruoyu smiled: "Not bad. The biggest advantage here is that it is far from residential areas, and the construction of a wharf on the riverside can reduce the cost of transporting raw materials. In addition to one wharf, the entire mixing plant site also covers an area of 60 acres. Each concrete production line needs five 200-ton powder tanks, four aggregate silos, and of course, reservoirs, machine repair rooms, staff dormitories, office buildings, and test buildings are also planned. My plan is that all the sand and gravel silos should be closed, so that the pollution to the surrounding environment will be minimized, and the quality of the concrete will be easier to control. ”
After listening to this, the technician said: "According to the field situation, we expect that it will take more than 100 days to complete the construction of the entire mixing plant, of course, the civil construction takes up the vast majority of the time, and our concrete mixing plant and related equipment are installed." It only takes thirty days at most. ”
Li Ruoyu said with a smile: "Of course, I will not ask you to rush the construction period, quality first." The first stage is the site planning that we are going to do now, and my plan is to complete the topographic survey, site planning and construction lofting of the entire site in 10 days. ”
After a pause, Li Ruoyu continued: "The second stage is the civil construction stage. We have conducted a tender and selected a reliable construction company to take care of it. The construction period is controlled in about 60 days, and the next step is the installation of your equipment, which is planned for 30 days, and finally the commissioning, which can be completed in 5 days. Of course, office buildings and dormitory buildings will take a little longer, which does not count. ”
Bai Yurou nodded and said: "Our office building must be designed in a grand way, we are a modern concrete company, and the image project is also very important." ”
Li Ruoyu smiled: "Sister Rou is right! Nowadays, many concrete batching plants don't pay much attention to this piece, but we can't be like them! I think we have to build a four-story building with an area of at least 2,000 square meters. By the way, the electricity here can be brought from the nearby substation, and the transformer should choose a large capacity as much as possible, leaving a large surplus. In addition, the diesel generator for emergency use also needs to be equipped with high-power to ensure that both production lines can operate normally in the event of a power outage. ”
The technician said, "I built Mr. Li to use our company's mature sewage treatment technology. This sewage treatment is also very simple, the sewage is mainly the sewage generated by cleaning the concrete mixer truck and the mixer, you can use the secondary or tertiary sedimentation tank, the sewage generated in the mixing station is collected to the No. 1 sedimentation tank through the drainage system, and flows into the No. 2 pool after filtering out the oil and large particle size of the sand and gravel, at this time, the water of the No. 2 pool can be reused to clean the equipment and site, and then the water of the No. 3 sedimentation tank can also be discharged. ”
Li Ruoyu nodded, he knew that the relevant departments are not very high for the sewage discharge requirements of the concrete batching plant, so it is also feasible to use the sedimentation tank. Of course, in the future, the policy requirements will be high, and it will not be too late to transform it into wastewater recycling to produce concrete water.
In fact, it is indeed a difficult thing for a concrete batching plant to achieve zero emission, even in the first decade, only a very few concrete batching plants can do it, which is called a green concrete batching plant, that is, a concrete batching plant that does not pollute the environment. (To be continued.) )