Chapter 129 The production line was successfully transformed

"Drop, PS1.0 system is on 1%, 2%, 3%...... 99%、100%。 Pen, fun, pavilion www. biquge。 info drop,PS1.0 system is officially opened,Now the status is level 5,Unlock new functional transformations,I hope the host will continue to work hard,Become the greatest repairer in the universe as soon as possible。 An electronic prompt suddenly sounded in Tian Ze's mind, and Tian Ze's right hand holding the spatula couldn't help but pause.

Great, the PS system has finally been upgraded.

A hint of joy appeared on Tian Ze's face.

"It's not good, my omelette ......" The so-called happiness is sad, this meal, the omelette in the pot is burnt, and there is a strong smell of burning, Tianze hurriedly cleaned up the mess.

By the time the omelette comes out of the pan, it has turned into a black egg.

"Alright! You can still eat it. ”

Tianze comforted himself.

Drinking milk and eating a burnt omelette, Tian Ze asked at the PS system.

"System, can you explain the new features?"

"Drop, the transformation function can transform everything, and as the level continues to improve, the transformation function will become more and more powerful. For example, the level 5 transformation function can only transform the machinery; Level 6 can modify creatures, and Level 7 can modify creatures, and Level 7 can ......" The PS system replied with its characteristic mechanical voice.

The function is similar to what Tianze conjectures, is it only level 6 that can transform creatures?

Damn, it seems that I still think too much.

Originally, Tianze thought that as long as the transformation function was turned on, he could give people beauty, such as changing his face shape, changing his body or something. In fact, what Tianze wants most is to transform himself and change his shuttlecock meat to play, but unfortunately it is impossible for the time being, so he can only put the lazy man's dream first.

"System, are there any limitations to the retrofit function?" Tian Ze hurriedly asked.

But it was Tianze who remembered the deduction function.

I am afraid that there will be many restrictions on the transformation function, and the transformation plan of the bearing factory will be in vain.

"Drip, no other restrictions."

Fortunately, the PS system did not joke with Tianze.

In a good mood, the omelette is not so unpalatable.

……

After quickly finishing breakfast and brushing the plates, Tian Ze picked up the car keys and went out.

I rushed all the way to the bearing machinery factory in the LH area.

Li Yuanfang was not at the construction site, Tianze chatted with Cai Yu, the vice president of Longxing Construction, and roughly understood the progress of the project, so he entered the No. 1 factory alone and locked the door.

"System, load into this production line." Tianze said while standing in front of a bearing production line.

This is the first time that Tianze has loaded so many devices, and it is inevitable that he will be a little apprehensive.

"Drop! Start onboarding. Fortunately, the PS system did not disappoint Tianze, and in a burst of electronic sound, there was an extra hologram in the blue stereoscopic space of the PS system.

It is a complete bearing production line, including cold rolling machine, automatic ball bearing internal cylindrical grinder, quenching line, etc., not to mention dozens of equipment.

"Turn on scanning."

Tian Ze ordered.

This time, it took nearly ten minutes for the PS system to complete the scanning, and the electronic voice sounded again, "Drop!" The scanning was completed, and the target was the mechanical production line, and the loss rate of the mechanical production line was 0.8%, and the main loss position was the base, and the other damage ......"

"Turn on perspective."

Tian Ze continued.

"Drop! Perspective function is on. "Wow! With the sound of electronics, the hologram of the bearing production line began to fade, and the internal structure was revealed in front of Tianze's eyes little by little.

Whew, Tian Ze took a deep breath, and then opened his mouth again and ordered, "System, turn on the deduction function, and aim to improve the accuracy of the bearing; Reduce vibration, noise and abnormal sound of bearings; Improve bearing life and reliability; and increase the DmN value of the bearing. ”

Tian Ze said a lot of requirements at once.

Needless to say, the accuracy of the bearing, the vibration, noise and abnormal sound of the bearing, which is an important indicator to measure the high-end bearing. Bearing life and reliability are also becoming more and more important, as for the DmN value of the bearing, it is the measurement standard of the bearing speed, and the high-speed index of the spindle.

"Drip, start deducing."

As the electronic prompt sounded, it moved, and the production line began to move.

However, it is not a real production line.

Instead, the holograms of the production line moved.

I saw that one bar (tube) was sent into the production line, after a series of processes such as forging, turning, heat treatment, end grinding, etc., and finally was fitted, balled, riveted, cleaned, greased, glanded, and then one by one the bearings were formed.

In the process.

The holograms of the production line are not static, but constantly adjusted.

For example, let's take a cold rolling machine!

As the parts are formed, the size of each part that makes up the cold rolling machine is constantly adjusting, and even the shape is changing, in order to produce more high-precision workpieces. It is not only the cold rolling machine that has changed, but also other quenching lines, annealing furnaces, presses, CNC lathes, etc.

About half an hour passed before the electronic sound sounded again.

"Drip, the first set of transformation plans is formed."

"Drop, continue to deduce."

Then the holograms of the production line moved again.

Again, it's a cyclical process.

Another half hour.

"Drop, the second set of transformation plans is formed."

"Drop, continue to deduce."

……

"Drop, the third set of transformation plans is formed."

"Drop, continue to deduce."

……

"Drip, the fourth set of transformation plans is formed."

"Drop, continue to deduce."

……

"Drop, the fifth set of transformation plans is formed."

"Drop, continue to deduce."

……

"Drop, the sixth set of transformation plans is formed."

"Drop, continue to deduce."

"Drip, due to the limitations of the material and size of the production line, only six sets of transformation plans can be deduced, and the host is also requested to choose according to their own needs." It took three hours before and after the PS system completed all the deductions.

Good guys, six packages.

Or because of the limited materials and size of the production line.

It's really a black technology!

It's awesome.

Looking at the six sets of transformation plans, Tianze carefully selected.

The reason why the PS system has deduced six sets of transformation plans is not the only one. All because under the current conditions, no matter how the bearing production line is transformed, it is impossible to produce the top bearings in all aspects, so it is naturally biased.

For example, the first scheme is biased towards precision, and the vibration, noise and abnormal sound of the bearing are slightly weaker. The second scheme is biased towards bearing life and reliability, and the DmN value of the bearing is slightly lower.

Picking and choosing, Tianze chose the fifth plan.

The reason why Tianze chose the fifth set of schemes is because the accuracy of the fifth set of schemes is the lowest.

That's right, you heard it right, the fifth scheme is the least accurate.

Of course, this low is relative.

Compared with the other five schemes, the fifth scheme produces the lowest bearing accuracy. But compared with the bearings produced by other factories, whether it is domestic or foreign, it is all leverage.

"system, according to the fifth set of plans to start the transformation of the bearing production line." Now that the transformation plan has been chosen, Tianze no longer hesitates, and directly issued an order.

"Drop, the transformation begins, the progress of the transformation of the mechanical production line is 1%, 2%, 3% ......" With the sound of electronic prompts, the bearing production line in front of Tianze began to change little by little.

What is the difference between retrofitting and removing and repairing?

In fact, the biggest difference is that transformation can change the shape of the object, while removal and repair cannot change the shape of the object, no matter how you do it. For example, the transformation function can turn a round watermelon into a square, while removing and repairing can only make the round watermelon smaller or bigger a little bit.

Now, under the transformation of the PS system.

Every equipment in the bearing production line is changing, maybe you can't find any difference between the bearing production line and the previous one at a glance. But as long as you look closely, you can always find a lot of differences, if you take apart the equipment, you will find that the equipment has already changed a lot.

PS: Thank you for the reward ★ of 'Lucky Snow' in May and the Blue Dragon, Mr. Lu, and the 100 starting coins for reading the book, and the 500 starting coins for binicular coal and skywang074.

It will be on the shelves tomorrow at 12 noon, and please support it.