Chapter 42 Completion of the project

After a more than ten days of absence, he returned to the manor, and the changes in the manor surprised Zhang Yuan. Pen, fun, and www.biquge.info

The black asphalt road has been paved to the river, the bridge has been completed, and now the engineering team is building a cowshed on the other side of the river. A large row of barns, almost finished, with only a few corners being repaired, no wonder Martin called to call him back. At this rate, the project will be completed today and tomorrow at the latest, and the rest of the equipment will be installed by a special company, and the project of the Leers Construction Company is nearing completion.

"I'm a little curious, how the hell did you do that?"

After Lells came over in a suit of overalls, Zhang Yuan asked.

"It's simple."

Lells smiled and wiped the dust from his hands and face, grinning, revealing a mouthful of large white teeth.

"A lot of things are ready-made, but the most troublesome is this road, which took about five days to build. The cowboy apartment uses a light steel structure building, just like a child's building blocks, which can be put together piece by piece. Bridges are also generally in this way, many of the components are prepared a long time ago, there are various models, as long as there is a need, we can also mobilize the materials of the five bridges at any time, as long as the bridge piles are built, the bridge deck can be laid on it. In fact, the main thing is that Mr. Zhang, your requirements are not high, so the construction process is relatively simple. ”

"That's ......"

Zhang Yuan nodded, basically understanding what Lells said. If according to him, it is really not difficult. Moreover, the Leers Construction Company brought a lot of workers, more than 30 workers, opened up several "battlefields" at the same time, and the efficiency was naturally high at the same time.

Next, Zhang Yuan took Martin and Lells to start looking at the parts that had been completed.

The first is the cowboy apartment, a two-storey white building right on the edge of the vineyard and in a straight line with the winemaking and vineyards. Looking at it from afar, the white walls and red roofs look very beautiful.

The three of them didn't drive, just walked on the asphalt path, the road surface was smooth and clean, and they were not pressed or covered with dirt and dust because they had to pass through the engineering truck.

Walking into the apartment, on the left-hand side is a large living room, which is large enough for more than a dozen people to use at the same time. On the right-hand side is the kitchen, which has all the utensils, including the refrigerator and water heater, which have also been installed. The water supply and gas are all connected, and you can move in at any time.

There is also a large games room on the first floor with computers, karaoke, billiards, and a small bar, just like a small bar. Because the estate has a special parking lot, the cowboy apartment is not equipped with a parking lot, and the original location of the parking lot has been converted into a tool room, which is empty, which has to wait for the cowboys to come and equip them with tools according to their needs. This tool room also functions as a stable, and in short, Lears is very thoughtful and able to meet all the needs of the cowboys.

On the second floor is the bedroom, a total of fourteen bedrooms, each of which is not large, with a matching bathroom. The interior decoration is of course much worse than the manor villa, but it is already very good, at least it is much better than the place Zhang Yuan rented before.

After looking at the apartment, the three of them walked along the path towards the small bridge.

The asphalt road passed by the side of the villa, through the winery and the grapes, and through the cowboy apartment, all the way to the river, and the side of the road was planted with trees by Lells, which looked much bigger, and all of them were thick, and obviously cost a lot. Trees shade the asphalt road so that it does not affect the landscape of the entire estate.

Walking to the small bridge, standing on the bridge and looking down, the river water is clear, there are small fish swimming leisurely, and the pebbles on the riverbed are clearly visible.

On the other side of the river, the basic works have been completed. The grazing area is simply fenced off with a wooden fence, and although there is no worry that the cattle will run away, there is still a better protection, which is safer and more beautiful.

In the case of the cowshed, the overall building has been completed, and the white inorganic FRP insulation board is used, and the roof is also of the same material, but it is red, as beautiful as ever. And more importantly, this material is very lightweight, after all, it is not a habit, as long as the cattle are given a shelter from the wind and rain, this material is just right.

Lightweight, cheap, cost-effective, and good thermal insulation performance, Canada's winter is very cold, if you do not do a good job of thermal insulation measures, it is a very serious impact on the herd, and the inorganic FRP material used today, the thermal insulation performance is particularly good, it is suitable for use in this kind of barn.

Of course, this material will also be used by the general engineering team in China to build temporary housing for workers, in short, it is a very good new material.

Zhang Yuan looked down all the way and had a deeper understanding of the level of Lills Construction Company. How to say it, Liles is a very careful person, and he thought of many things that Zhang Yuan didn't expect for him. The quality of the project is also very good, the construction speed is fast, in short, Zhang Yuan can't find any fault.

After looking around, Zhang Yuan called Liles aside, took out a check from his arms and handed it to Liles.

Uncle Hei took it and looked at it, and immediately smiled so hard that the corners of his mouth grinned at his ears, he reached out and patted Zhang Yuan's shoulder, and gave a thumbs up.

There is nothing that makes him happier than Party A's payment on time, the country's economy has not been good in recent years, and all walks of life have been impacted. The biggest fear of these companies in the construction industry is that Party A has no money to pay. If it is really not rich, it is easy to say, I am afraid that someone will take advantage of the financial crisis and be unwilling to give it even though they have money. It's too troublesome to go to court, and if you ask for money and can't get it, that's the most headache.

Lears now has hundreds of thousands of foreign debts to be returned, although he is not just counting on these money to eat, but hundreds of thousands of Canadian dollars in construction money is not a small amount, and he will of course feel distressed if he can't get it back.

To do Zhang Yuan's order, he is also ready to be deducted from the project payment, which is almost already the industry rule, what he didn't expect is that Zhang Yuan actually took out the third project payment so happily, and now there is only tens of thousands of yuan left in the final payment, even if he can't get it back, he has already earned, what can be more happy than this?

Lells was happy, and he worked more seriously, and the project, which had been basically completed, was completed on the day Zhang Yuan came back under his supervision. The next day, a relevant manufacturer came to install the equipment, because it was a contract signed with Lills Construction Company, so Lills followed up the whole process, and it took two days to install the equipment.

Two days later, when the project was completed, Zhang Yuan said that the cooperation was pleasant, and invited Lills to have a Chinese meal in his manor.

The next day, he called Laris and told him that the 2,000 head of cattle were ready to be transported.