Chapter 280: Trial Production
In the afternoon, he began to openly recruit the remaining workers, and the seven communes of the Beidou, he only enrolled about 170 people in total, plus 50 students. The new field has already enrolled 20 students, and the total number of students has reached 240.
Then he released 30 places to Dahong Commune and 20 places to the Xinchang government. There are still 10 short of the planned 300 workers, and these 10 people will be retained first.
In the evening, he was already standing on the roof to blow the wind, no matter how the rooms were divided below, the roof was open, and the advantage of building a house in winter was that there was no need to worry about rain.
The total area of the roof is more than 600 square meters, which is almost one acre, which is quite large, and how much grain has to be dried.
There are gaps between the floor slabs, which need to be specially treated, covered with wooden boards below, and then filled with mixed cement slurry, which will become a whole after solidification, and the roof also needs to be waterproofed, asphalt will be used to treat the gaps, and finally a layer of mud will be paved. Therefore, there is a reason why the cost of buildings is large, not only in rural areas, but even in urban buildings, and its waterproofing is also a big problem.
As soon as the floor is covered, you can start to plaster the wall, first smeared with a layer of cement slurry, and then plastered with lime, there is also a kind of putty, but the color is very bad, not pure white, but with some gray and black, and it is not a comprehensive color, but a piece of gray and a white, it looks really bad. But this kind of putty is better than lime, the lime wall is easy to fall ash, and when you touch it, it will also be dyed white. Putty doesn't have this problem.
In the end, Fang Dajun still purchased dozens of packs of putty back, and the price was cheap, and the wall could be wiped at night. All you need is lighting.
It's the eighth. Fang Dajun was still on the construction site. He hasn't officially seen all the processes involved in building a house, so it's better to follow along. At the same time, the training work here has also been carried out, learning basic work, such as tying threads and so on.
Because the salary is a piecework system, he is not worried about losing money in terms of wages, but is afraid of delaying the sales period in terms of processing speed, so he urgently added 20 sewing machines. And purchased 200 watts, 300 watts of large bulbs, which will be used for lighting when the time comes. However, there are no energy-saving lamps now, and electricity bills are billed.
The total cost of such equipment is 10,000 yuan, and the total construction cost of the factory is about 15,000, which exceeds the expectation of a full 5,000. The total investment here is 50,000 yuan, which is half of it, and the purchase of a truck is 15,000 yuan, and in the end there is only 10,000 yuan left, and even two months of turnover can't withstand it.
Sales, Fang Dajun felt the huge pressure on sales.
This will be tiling. It's a jelly, pull the line first. Compared with pasting, a tile is only half of the cement, half of the middle is hollow, as for the gap between the tiles, it is also simple, after pasting, use the cement as a whole to wipe the gap, fill the gap, and then use a rag to wipe the tile clean, you must be as soon as possible, otherwise after the cement solidifies, it will not be wiped off.
Many masters stood on the sheep and horse stools to start work, and the appearance of the factory was basically about to come out, and it was extremely conspicuous from a distance. It is estimated that it will become a landmark building for a long time.
At night, the tiles, walls, and roof are already OK, and the next accommodation building can also be laid with a second floor slab. At the same time, the walls on the first floor have also been plastered, and the tiles should be pasted at the end to ensure symmetry up and down.
On the 9th, on this day, the factory was already in the process of finishing, and it was originally expected to be the 10th, but it is estimated that he was staring at the construction site every day, and he actually advanced the time by a day.
On this day, the floor slab on the second floor of the accommodation is also paved, and the accommodation building can be topped out for a maximum of three days. The spare workers in the factory were not idle, and continued to work on the surrounding buildings such as the canteen, bathhouse, and toilet.
Everything was going on in an orderly manner, and when the army arrived at the factory on the 10th, he found that it had changed a lot overnight, and he had worked overtime to clean it last night, but the ground in the house was not completely dry, and he could not settle down for the time being. Wait another day and you can start work.
On this day, the remaining sewing machines were also pulled back, as well as a large number of pre-fabrics and tools, as well as two trucks were also driven back, and after more than ten days of work, the place was completely new, from farmland to high-end factory building area.
But it wasn't time to set off firecrackers, because the first garment hadn't been put into production yet.
As for the Jiaoshan Commune, it is basically working day and night, and finally has a finished product, although the stupid method consumes time, but it can also use time to make up for the shortcomings, Chen Dalong with the current increase to 35 people, and has lived up to the high expectations of everyone, has produced more than a dozen finished products, each style has also determined the large, medium and small size, the data has come out, and also arranged people to try on, he selected a lot of "part-time" models, and finally sorted out by the students, registered into a booklet, and then printed out a number of copies.
Now that it has been handed over to Zhang Cuiping, Fang Dajun urgently recruited 30 workers directly, and this time took care of the employees of the cement factory, selected from the employees' families. The total number of workers in the garment factory reached 320, of which only 35 were in the commune of Jiaoshan, and the remaining 285 would be placed in the new field.
The training continued, but everyone was impetuous, it should be said that they were excited, which Fang Dajun couldn't control, because he was also excited.
Two brand-new double-row trucks, wearing big red flowers, drove directly to Jiaoshan Commune, stood on the platform, drove to the Beidou Supply and Marketing Cooperative, and finally the cement factory, and then put it in front of the Xinchang factory. Well, it's a parade.
On the twelfth, the accommodation building was capped, most of the tiles were pasted, water and electricity were installed, and the main wires were installed in the factory.
Li Yulan was already so distressed that she was about to cry, but Fang Dajun still went his own way, and there was absolutely no ambiguity where he should spend money, even if he exceeded the budget, he had to bite the bullet.
The day was busy until late at night, the sewing machines were moved into the factory, and various workbenches were prepared, including wooden tables, etc., divided into six groups, each group of twenty sewing machines, one of which was engaged in finishing, such as buttoning, trouser hems, and trademarks.
There is also an iron group, plus an inspection and statistics group, a cutting group, and finally a handling and packaging group.
All the groups also need to be doubled, because it is two shifts in the day and evening, and there are twenty groups in total, with 140 people in each class, and there are a few more people in the day shift.
On the 13th, the best batch of dozens of workers entered the field and began to run the first batch of clothes, the first batch of total processing of dozens of children's clothes, suitable for five to eleven years old, he also found a model, which is directly selected from the school recognized "face like". It was selected from PK from several schools. Part-time models, the factory will pay a certain amount of hard work.
In addition, the photo studio was also completed, and he bought a family from the county town to settle in Xinchang, as well as a small printing house, both of which were his private property. The cost is really not small, if it weren't for the more than 2,000 earned from the floor slab, he would almost have to embezzle the funds again, and he still personally owes a debt of 4,000 oceans to the cement factory.
His first wave of focus was children's clothing, not because of the market, but because of the price, of course, the group he faced was also very large.
When I ran the process, I found that things are not so simple, independent research and development is the most difficult, Chen Dalong gives the data and samples, and then the tailor here cuts the knife according to the size, and then the tailor team sews it, and then the inspection team checks and counts, and then irons and packages after passing. That's when it's the finished product.
After so many processes are divided, it stands to reason that it should be very fast, but it needs to be run-in, which can be described as full of situations. It wasn't until mid-afternoon that the clothes were brought out without danger.
And today is also Sunday, the selected models are waiting, he did the opposite, the first to pick the boy, and the style of the clothes is also boy, Guy now boy's family status is significantly higher than that of girls.
A total of twenty-one children came, three of each age group, and the figure was also distinguished, and it was indeed worthy of the "face praise" birth, each of them looked pink and jade, and the clothes were all on the body, and the effect was all out, and the business makeup artist was also invited to dress up.
As for the LOGO trademark used in the clothes, he directly copied the trademark of "Apple", and the name of the garment factory is also called Apple, which is simple and easy to remember, and it can be regarded as the first registered trademark, uh! (To be continued......)