037 Discussion
"How far is it from the Yanjia Village you said to this Bieshan County?" When there was a plan in his heart, Yue Shaohua suppressed the curiosity about Wang Shizi in his heart, and began to ask Wang Shizi about the situation of the road he envisioned.
Hearing Yue Shaohua's inquiry, Wang Shizi did not answer directly, but first found a map on the computer, and then clicked on the map with the mouse and began to introduce it.
"According to the straight line distance on the map, it is not too far, about 90 kilometers, but more than 50 kilometers of it are in the mountainous areas where no roads have been built, the average altitude is about 1,300 meters, even outside the mountains it is impossible to build roads along this straight line, there are farms, cultivated fields, ponds, lakes, according to my calculations, this road really needs to be built about 200 kilometers. It also depends on whether the road in the mountainous area can be tunneled along the road. In addition, I hope that this road will be built in accordance with the standard of the first-class highway outside the mountain, and the mountain can be lowered to the standard of the second-class road, so that it can be convenient for more vehicles to enter the mountain in the future, especially the initial construction vehicles, after all, the road will be connected to electricity and water after the road is repaired. In addition, the scenery in the mountains is good, and there are many special products, which provides a basis for the development of tourism resources. ”
"And to develop these resources in the future, the road will definitely have to afford the task of entering countless large construction vehicles! Therefore, the quality of the road must be good, especially the mountain road, otherwise it is not fun to have an accident. There are no entertainment and leisure attractions near the city of Eshan. Therefore, I believe that if this road is repaired, it will definitely attract some urban people to choose to come here for leisure and entertainment during the long vacation. This can also drive the economy of the mountains as quickly and as long as possible! ”
Wang Shizi's answer did not disappoint Yue Shaohua.
Obviously, the kid said that he wanted to build such a road, obviously not just talking, but after careful consideration and planning. Even for what kind of road to be built and what functions it will undertake, it is very clear and organized, which fully shows that Wang Shizi is not a temporary idea, but has already had this thought.
In other words, although it only took Wang Shizi more than an hour to show him a near-perfect mobile phone operating system today, it may not be a temporary flash of inspiration as the kid said just now, but he has already thought about making money through this system.
But no matter what, in Yue Shaohua's opinion, Wang Shizi can already be described as a demon. But the more such simple demons, the better!
Of course, Wang Shizi's introduction also made Yue Shaohua gasp, this road is really difficult to repair. The money needed is not even a little bit. It is mainly the section of the road in the mountainous area of Dabie Mountain, and it is a consensus that the mountain road is difficult to repair. In particular, Wang Shizi also plans to build this road according to the standard of the secondary road, and also ensure the quality, which is too big for the individual to bear.
If this road is really built according to Wang Shizi's ideas, it will not be a matter of more than one billion!
The main thing is that Wang Shizi's standard is too high, according to his standard to repair, even if the mountainous area only requires the secondary highway standard, the cost per kilometer is more than five million, not to mention that in the mountainous area with complex terrain, not only the early stage of the need for more complex survey and design, formal construction may also encounter various accidents, and even to dig holes in the mountains to open the road, but also to ensure the quality, the cost required can be higher, the cost per kilometer to break 10 million or even 20 million, 30 million are the same as playing.
Outside the mountainous area, if it is built according to the first-class road, even if only two-way four-lane roads are built, the cost will have to go up to 30 million.
In this way, the estimated cost of this road has reached an astonishing 5 to 6 billion. If you count the difficulties that may be encountered in the middle of construction, even if the final cost exceeds 7 billion, Yue Shaohua will definitely not be surprised.
"Your heart is too big, Wang ...... Shizi! When talking about Wang Shizi's name, Yue Shaohua obviously hesitated, now he couldn't treat the young man in front of him as a simple candidate, but put Wang Shizi in an equal position with him, so he couldn't call Classmate Wang anymore, but called his name directly.
"You know that the standard of a first-class highway is a two-way four-lane road, and there is a separation belt in the middle, and the average daily traffic volume reaches 15,000 to 30,000 vehicles. Similarly, the roads in the mountainous areas are built as secondary roads, and the average daily traffic volume is 4,500 to 7,000 vehicles. If they are all built according to your requirements, the final cost of this road may be more than 700 million. ”
"If you really want to help Yanjia Village out of its current predicament, I think the most realistic way is to first build a rural road to the nearest township. Even if it is a mountain road, the cost per kilometer is estimated to be about one million, so that the overall cost can be controlled within 100 million yuan, which is a more realistic plan! If this road is not enough in the future, it can be expanded! ”
Although Yue Shaohua also agrees with Wang Shizi's views in his heart, in his opinion, his own construction is the most reasonable plan. According to Wang Shizi's plan, not to mention that the investment is too huge, the key is that there is no return, the input is not proportional to the output, and there is even a suspicion of waste of resources.
However, his conscience did not seem to agree, and only after thinking for a moment did he speak: "Well, what you said also has some truth. Or the road outside the mountain does not need the standard of a first-class road. However, the whole secondary road is my bottom line. If you want to repair it, build a good road to come out! ”
Wang Shizi's answer made Yue Shaohua a little speechless, but he still couldn't help but speak: "Even if the entire road is repaired according to the secondary road, the final investment is about four billion, which is not a small amount of money!" ”
"The problem of money can always be solved, but this road must be repaired!" Wang Shizi stubbornly insisted.
If it weren't for the mobile phone that Wang Shizi had just optimized for him, Yue Shaohua would definitely only regard this sentence as the arrogant words of a child who has never seen the world, but now he really doesn't know how to evaluate this teenager's persistence. However, he still decided to say a few more words: "Okay, then you sue me, why do you have to insist on building this road in place at one time?" ”
"People always maintain the greatest passion when they realize their dreams for the first time. If you really do what you said, build a random country road first, maybe it will be difficult to expand this road in the future. Wang Shizi glanced up at Yue Shaohua and explained very philosophically.