Section 115 Restoration of Poseidon City
Chen Yan is ready to rebuild Haishen City on the outskirts of New Chang'an to create a world-class tourist attraction, and has prepared 7 billion US dollars, if this money is not enough, Chen Yan also has the Australian Petroleum Company's oil share revenue, as well as 64,000 tons of silver. Pen @ fun @ pavilion wWw. ļ½ļ½ļ½Uļ½Eć ļ½ļ½ļ½ļ½
July 19th.
Chen Yan established the Poseidon City Rehabilitation Team.
July 25th.
4,000 workers were recruited to collect stone in the nearby stone mountain, which produces high-quality marble and granite stone in Bainuc.
Stone is needed to reconstruct many buildings in Poseidon City.
The pyramid located in the center of Poseidon is more than 200 meters high and more than 300 meters long at the bottom, and it takes 4 million stones weighing several tons or even more than ten tons.
The large stones needed for the restoration of Poseidon City are hundreds of millions of blocks, as well as stone slabs, stone statues, etc., at least 4,000 quarrymen are required to quarry stones on the stone mountain to meet the needs of the stone for the restoration of Poseidon City.
1,000 workers were also organized to burn bricks.
Chen Yan found bricks with handprints on the bottom of the sea, which shows that the Atlanteans invented red bricks, which are made of clay, shale, gangue, etc., which are crushed, mixed and kneaded and dried manually or mechanically at a temperature of about 900 degrees Celsius and fired by an oxidation flame after drying, and are widely used in various buildings.
The Poseidon City at the bottom of the sea has become a ruin, buried in the sediment on the bottom of the sea, Chen Yan did not find a single piece of wood as a building support, but in fact, many places in the buildings of Poseidon City have to use wood supports, such as beams and columns.
Bainuko is a desert and surrounded by a desert that requires hundreds of millions of pieces of wood to be cut from the forests of Ethiopia, South Sudan and India.
The Atlanteans invented red bricks, of course, they also invented cement, but in fact, the calcination technology of cement is not difficult, and the source of raw materials for calcining cement is also very common, limestone, chalk, calcareous marl, shells, etc., in China, about 5,000 years ago, there is the world's oldest "concrete" ground at the Dadiwan site.
The Haishen City Rehabilitation Team organized 300 people to produce concrete cement.
In fact, in the land of Bainuko, in addition to the absence of minerals, oil, stone, limestone, quartz, etc., these resources are very rich.
More than 10,000 people have prepared materials for the restoration of Poseidon City.
Then, there is the carpenter group, the stone statue carving group, the architectural decoration carving group, the stone wall mural carving group, and the house building group,......ć
There is also a very large project, the restoration of the Chillip Canal, the inner canal of the ring encloses the core area of Poseidon City, the second layer of the canal surrounds the commercial area of Poseidon City, the artisan area, the handicraft production area, workshops, etc., the outermost canal surrounds the ordinary residential area, the canal extends to connect the Red Sea, and the restoration of the Chilip Canal is a more vast project than the restoration of the central pyramid.
The reconstruction of the entire Poseidon City is a world-wide project, and more than 50,000 people directly participated in the reconstruction of Poseidon City.
By the beginning of August.
The reconstruction of Poseidon City has been done with engineering drawings and divided into block tasks, for example, stone statues, there are a total of 4,771 stone statues in Poseidon City, and carving stone statues is the task of the stone statue carving team.
The stone carving group is composed of intermediate and senior craftsmen in stone carving.
Another example is the carved patterns on the pillars and the decorative carvings of buildings, which are the tasks of the architectural decorative carving team,......ć
-----
August 4th.
Poseidon City Rehabilitation Team began to recruit workers, 4,000 quarrymen, 1,000 brick burners, 300 cement workers, construction workers, etc., and 25,000 workers needed to be recruited, which solved 25,000 jobs in Bainuko.
Then, carpenters, stone carving, architectural decoration carving, mural carving, and other craftsman positions went to China, India recruited 4,000 people, China, India has many such craftsmen, very good at carving, painting, casting and other craftsman skills, the cost of recruitment will not be too high.
In European countries, these craftsmen are blown to a very high level, and the cost of recruitment is extremely high, recruiting a senior craftsman to work is at least hundreds of thousands of dollars a year, and recruiting 4,000 people is more than a dozen or two billion dollars, and the cost of recruitment is too high.
It costs only $100,000 to recruit a high-level craftsman in India, which is already a very high salary, and the carving skills are not inferior to those of European craftsmen, who are found in many temple restorations in India.
August 15th.
The first recruitment of 4,000 quarrymen was completed, because the remuneration given was high, a basic salary of 2,500 US dollars, plus high temperature, hot subsidies, dangerous work subsidies, and other subsidies, and the remuneration directly exploded to more than 3,500 US dollars, which is equivalent to about 24,000 yuan.
Moreover, it also bought insurance for each quarryman with an insurance amount of 300,000 US dollars, and Citibank relied on its relationship with Chen Yan to get the insurance contract for more than 50,000 workers in the reconstruction project of Haishen City, which is a huge contract, and many dangerous jobs are very insured.
The 4,000 quarrymen are divided into more than 10 quarrying groups.
Millions of electric mines\1 tubes were bought from China to blast quarry hills.
Quarrymen quarry stones on the rocky hill and transport the collected stones to the construction site of the restoration of Poseidon City, where the stones are cut into flat boulders, stone slabs, and carved into stone statues, architectural decorations, etc. by craftsmen.
August 20th.
300 cement workers were recruited.
The site for calcining cement is located at the foot of a limestone hill, making it easy to obtain local materials.
August 25th.
1,000 brick-burning workers were recruited.
August 30th.
More than 1,000 middle and senior craftsmen were recruited.
The average mid-level craftsman gets a salary of about $6,000 plus a job allowance.
The average salary for a high-level craftsman is about $10,000 plus a work allowance.
Artisans don't get paid so much in India.
The salary offered by the Poseidon City Rehabilitation Team is very attractive to many craftsmen.
The Poseidon City Rehabilitation Team is also continuing to recruit craftsmen, and it is expected to recruit 4,000 craftsmen.
------
Everything is ready, start building Poseidon City.
First of all, the central pyramid of Poseidon City was built, which is an extremely huge project, with more than 4 million tons of boulders, or even more than a dozen tons, more than 200 meters high, which is more difficult than building skyscrapers.
Because, to lift a dozen tons of boulders, and the rocks fit closely with each other, without any gaps, the pyramids of the Atlanteans did this, the pyramids of Egypt did this, the knife could not penetrate the gaps, there is no reason why modern pyramids cannot do this.
-----