Chapter 12: The Great Project

A week later, the first country hotel was completed. Pen, fun, pavilion www. biquge。 info

Bite! Congratulations to the host for completing the side quest and building the first rural hotel, with 100 points and 10,000 meters of money.

Two weeks later, all the country hotels were built.

Bite! Congratulations to the host for completing the achievement quest "Country Hotel Enthusiast", successfully building 10 village hotels, rewarding 1000 points and 100000 gold.

So five engineering teams were vacant again, and Fengyun put all of them into the construction of other infrastructure buildings in the tourist village, at this time, Feng Tianxing heard the system prompt sound more frequently, and he was very happy at first, but after a while, he felt annoyed and directly blocked this information.

After another week, most of the buildings at the resort have been completed, the engineering team is finally vacated, and the real big work is about to begin.

Feng Tianxing left the two engineering teams behind to continue to improve the layout of the resort, various decorations, and the paving of roads. The road to the resort is paved with stone pavement, and the color is yellow like a beach, which is very beautiful, and the green grass and trees along the road are very beautiful.

The cables and water pipes are all buried under the road, separated from the sewer, and manhole covers are set at intervals for easy viewing.

Therefore, the sky of the leisure resort is not artificially traced except for blue skies, white clouds and coconut trees.

As for the remaining eight engineering teams, Feng Tianxing divided two to build artificial lakes and six to build pastures. These two are the real big projects.

Pastures are much larger than farms, after all, grass is needed, and the grass is too small to become grass, and there is nothing to see. Therefore, Feng Tianxing is very generous in using most of the area under his current jurisdiction to build pastures. There are about 700,000 acres of land, which can almost be used as a small grassland.

After all, the entire jurisdiction of Feng Tianxing is 500 square kilometers, almost more than 750,000 acres of land, excluding 700,000 acres of pasture, there are still more than 50,000 acres, which is enough for other construction.

All kinds of huge machinery began to appear, and this Gobi Desert-like territory, under the machinery that surpassed many modern societies in technology, was directly turned upside down, the fertile soil below was turned up, and the weeds and stones on the surface were buried.

This project can be described as unprecedented, 700,000 acres of land, the whole six engineering teams, more than 600 people, nearly 100 excavators work around the clock, the members of the engineering team take turns, even so, it took half a month to complete the planning of the pasture, and the next is to plant pasture.

Grass Wind Sky Walk buys high-quality forage grass directly from the system store, which has high nutritional value and fast growth rate. Because the wind and weather travel are strict on the number of livestock in the pasture, there is no need to worry about the load on the pasture.

In addition to providing fresh and healthy meat to leisure resorts, the purpose of the ranch is also a horse farm. This is the big head, and horseback riding is very popular. After all, Prince Charming's influence is not small.

Horses are also purchased directly from the system store, but it's still early, after all, the grass hasn't grown yet.

The buildings were trivial, the barns for the cattle, the stables were all done in half a day.

Now it's time for the grass to grow and bring in the livestock.

……

Three weeks later, the ranch was finished, but the work on the artificial lake was not half done! Because there were only two engineering teams, and the machinery that was originally used here was used on the pasture, the progress of the artificial lake was very slow.

Although the artificial lake does not need to be more than ten meters deep, the center should not be too shallow, after all, if it is too shallow, it is not a lake, but a pond.

Therefore, the requirement of Feng Tianxing is that the center position is eight meters deep, and the closer you get to the edge, the shallower it becomes, and this artificial lake presents a funnel-shaped. The lake is connected to the only freshwater river in the area, so that the sub-lake water is not too dead and does not stink due to the accumulation of too much garbage.

Although the artificial lake is much smaller than the ranch, only 1,200 acres in size, the project is also very large, after the ranch was built, the engineering team and machinery were vacated, and it took another week to finally complete it.

After all, it's about digging up a lot of dirt and transporting it somewhere else, and the best place to dump it is on the pasture! Therefore, the amount of work in the artificial lake is huge.

In the last step, the channel between the artificial lake and the river is dug and the river water is quickly injected into the artificial lake, and soon the artificial lake is connected to the river. However, because it is a newly dug artificial lake, it is inevitable that the lake water will be muddy because of mud, but it doesn't matter, after precipitation for a period of time, it will be fine, plus Feng Tianxing has invested a lot of aquatic plants in it, so that the artificial lake can be purified more quickly.

The fish species in the artificial lake were all chosen by Feng Tianxing because he did not want to cause the serious problem of species invasion, which would be difficult to do.

The role of the artificial lake is to be used for fishing, the artificial lake Fengtianxing only charges a certain entrance fee, fishing, depending on your own level, what you catch is yours. There will be no further charges.

The fish caught by tourists can be taken back to the wooden house to make it themselves, or taken to a country hotel, paid a little money, and asked the chef inside to help, so that the wild fish will be very popular.

In addition, there is more than just fishing in the artificial lake, and there are many other activities such as boating that can attract tourists.

When two huge projects are completed, the system naturally has to give some rich rewards.

Bite! Congratulations to the host for completing the side quest to build the first ranch, rewarding 1,000 points and 100,000 meters of money.

Bite! Congratulations to the host for completing the side quest to build the first horse farm, rewarding 1,000 points and 100,000 meters of money.

Bite! Congratulations to the host for completing the side quest to build the first artificial lake, rewarding 5,000 points and 500,000 meters of money.

For the big project, the rewards are really more generous, and Feng Tianxing is very satisfied.

The farm, pasture, and artificial lake have all been built, and Feng Tianxing divided ten of the more than 90 people on the farm to work on the ranch, and five people to take care of the artificial lake.

Although the pasture is larger than the farm, the place where the livestock are fed is not really large, so there are not many people, and a dozen or so is enough. The artificial lake, on the other hand, does not need to be managed by people at all, and only needs to be graded by the garbage on the surface of the lake on a regular basis.

……

After the ranch was built, soon the grass was almost grown, and Feng Tianxing directly bought some sheep, cattle, and other common livestock. And the horses are also bought directly in the system store, they are all rare good horses, and the riding club is also built in a good way, after all, it is the design drawing given by the system, which is science!

I have to say that such a big expense is well worth it, the whole ranch is like a prairie, a river passes through quietly, and the grass falls left and right with the breeze. There are also flocks of animals either grazing or sleeping quietly, while those who have not yet grown up play together. It is indeed a beautiful view.

The aquatic plants in the artificial lake have also grown, but the fish have not yet grown, but the artificial lake is connected to the river, so there are many fish that directly enter the artificial lake with the current.

The time came to October 5, 2013 (the world before the wind traveled was 2016, and the year was positioned in 2013 after the crossing), and the tourist village was finally basically completed after more than two months of hard construction. Pastures, farms, and fishing grounds have also been built, and water and electricity have been connected. And the ideological education of the more than 90 residents was also completed a long time ago, and they got 300 points.