Chapter 404: The Parties Begin to Act

By the time the residency matters were discussed, the meeting had been going on for about an hour and a half, and there were many details involved in the middle, which were taken into account when Xu Jin prepared the residency plan. Pen × fun × Pavilion www. biquge。 info

But Shu Cheng felt that no matter how detailed and thoughtful he was considering today, there would be some accidents and other things when the construction was carried out.

"Now that we've discussed the station, let's talk about the rebar processing plant and the mixing plant." Shu Cheng said.

After the project department enters the site, in addition to the construction of the station, the steel processing plant and the mixing plant, these two issues should also be considered.

Railway construction, the most basic is reinforced concrete, there are no two, how do you carry out construction?

For the steel processing plant, the general project department is built and then processed by the project department. For the batching plant, according to different arrangements, depending on the meaning of the construction headquarters, whether it is built by itself or by the material equipment company, to provide concrete for the project department.

However, for the day route, Yao Gongjun clearly stipulates that for the construction of the mixing plant, each project branch must build the mixing plant according to the situation within the jurisdiction of its own project department.

There are of course reasons why it is said that it should be built according to the situation within the jurisdiction of its own project department.

Shu Cheng paused and continued: "According to the requirements of the construction headquarters, the steel processing plant and mixing plant of our project department are all built by our project department itself. ”

To build a steel processing plant and a mixing plant, you must first choose a location, where to build, which is more reasonable and economical.

All kinds of freight must be taken into account, after all, in the sky route, are all plateau areas, sand and gravel freight is not low.

For example, when building a mixing plant, you can't just think about being closer to the construction site, although it is close to the construction site, the speed of transporting the mixed concrete to the site is much faster.

But in this case, it will inevitably increase the distance of concrete raw material transportation, after all, these two distances, under normal circumstances, are the relationship between one and the other.

But the plant should not be too far away from the construction site, such as in Golmud, which is obviously not realistic, and by the time the concrete is transported to the site, it has already set.

"The bridges of our project department are in the Devil's Cave Tunnel, Fengmingshan Tunnel, Kunlun Mountain Tunnel and a mileage of several kilometers. Yan Yuyang suggested.

The station is only five kilometers away from the construction site, which is not too far, and according to the transportation distance, it is indeed suitable.

"It's not suitable, sometimes the mixing plant also works overtime at night, and the members of the project department are restless at that time, and they can't rest at all." Wu Batian objected.

Whether it is a mixing plant or a steel processing plant, it is possible to work overtime in black and white, and it is normal to work in black and white in two shifts once the day route is urgent.

When the time comes, all kinds of machinery and equipment will be turned on, buzzing and noisy, and the members of the project department will become panda eyes.

"I think it's okay to build it on the Kunlun Mountain." Lin Xiaoyong thought for a while.

Everyone expressed their opinions, and Zhan Yuntian said at this time: "In fact, in my opinion, it is okay to build a mixing plant in the Gobi Desert, and find a place surrounded by the Gobi Desert, in order to block the wind, as for the hail, this construction can not be blocked anywhere, and the traffic in this place should be convenient, the road conditions should be good, and it should not affect the entry of concrete and transportation materials, as for other things, I don't think it has a great impact." ”

Shu Cheng nodded and said: "Secretary Zhan is right, my construction is built three or five kilometers downstream of this river, first of all, if you build in that place, electricity and network are very convenient, and you can directly lead it from here." The water is also very convenient, take the river, of course, the water will be frozen in winter, so we must be prepared to drill a well, because of the proximity to the river, this groundwater should not be very deep, and the water of the mixing plant in winter should be satisfied. ”

In fact, in Shucheng's view, the water used by the mixing plant is a big problem, although the construction on the Gobi Desert is good, but without water resources, there is no way to mix concrete, and there is no way to work.

Now there is a river next to the project department, and it is completely possible to build a mixing plant downstream.

Since Shucheng considered drinking water from the river, it was not possible to build the mixing plant upstream.

This river, after Shucheng's observation, the river water is about four meters deep, once frozen in winter, Shucheng considers whether it can drill through the ice, and pump it as it goes, and the pumping is best carried out during the day.

In this case, it is necessary to prepare a large container for water and keep it warm, otherwise the water pumped up will not be directly turned into ice cubes.

In addition, the main reason for using it with pumping is that the pumping pipe will freeze, and if the insulation measures cannot keep up, water is a big problem.

Therefore, for the sake of stability, Shucheng came up with the idea of using drilling wells and pumping groundwater to supply water for concrete mixing.

In order to prevent the water from freezing and freezing during construction in cold weather.

As for whether these ideas can be realized, we will have to wait for the construction of the mixing plant to know.

"Once the cold weather catches up with the construction period, a few wells may not be enough, and a few more must be drilled for backup." Wu Batiandao.

"In fact, the number and depth of drilling wells, we can determine the daily water consumption of the mixing plant and the groundwater situation at that time, but we will calculate it according to the 100% factor, and I think the water aspect is still not a problem." Shucheng Road.

"The water aspect is solved, the electricity and the network are also solved, then the living and office construction of the mixing plant are left." Zhanyun Heavenly Dao.

"That's right, for the construction of the office area of the mixing plant, due to the need for fewer rooms, the first-floor board room will be directly used for air conditioning and heating. Staff dormitories, using tents, are still heated by fans. Shu Cheng continued: "For the silo, let's use the form of a factory, but the stability needs to be strengthened to prevent it from being blown away by the wind. ”

In the plateau area, cold, wind, and hail protection should be taken into account.

In some places, there is hail almost once a day, and you don't know when the hail will come every day.

As for the windproof, when it is big, there are eight or even stronger winds, how to ensure the stability of the house, the wind resistance, is extremely important.

"And the concrete on our side, unlike other concrete, all the concrete, are highly durable, for which professionals to come over to build the feeder, we have to agree." Shucheng Road.

The day route is extremely difficult to maintain, the environment is harsh, the wind is strong and other factors, the requirements for concrete are extremely high, and the general mixing plant cannot meet the production needs at all.

Therefore, the construction of such a batching plant feeder must go through a strict review to determine that the effect can be achieved before the construction can be carried out.

Moreover, after the construction is completed, various tests will be carried out to see whether the concrete produced can meet the construction requirements of the plateau area.

In view of the problems that arise in the experiment, Gao brainstorms and strives to solve these problems.

Finally, when the exposed problems are solved, they can be truly put into production and used in the construction line.

This is also the reason why the natural route does not need to be maintained in a large area, mainly in the construction process, the construction quality is comprehensively controlled.

After all, now it is only a general idea and direction, and the specific implementation situation has to be prepared into a plan, reported to the company, and after the company's approval is completed, it will be truly implemented.

"The last is the steel processing plant, I don't think there is any controversy about this matter, it is still built not far downstream of the project department, when the time comes, we will find a suitable place, for the construction of the steel processing plant, according to the mixing plant, the dormitory is also warmed with tents and heaters." Shucheng Road.

Seeing that it was almost lunch, this meeting was open all morning, and everyone was a little tired, so Shucheng did not continue.

For the matter of the steel processing plant, after discussion, it is time to choose the construction team.

After eating, Shu Cheng and Lin Xiaoyong returned to the dormitory, occasionally discussing the morning meeting.

As soon as he entered the room, Li Yifeng called Shu Cheng.

"Hey, Mr. Li!" Shucheng is connected to the channel.

"Shucheng, I heard that you are going to start building a steel processing plant over there?" Li Yifeng got straight to the point.

Shu Cheng was stunned for a moment, glanced at Lin Xiaoyong meaningfully, and then said with a smile: "Yes, the site selection has just started today, and there is still a period of time before the construction, so it should start at the end of the month." ”

"That's right, I have a construction team here, I want to go to your place to do some work, originally I didn't want to come to you, but he helped my second brother a lot back then, my second brother mentioned it to me today, see if you can arrange it." Li Yifeng said.

In the early stage of a project department, there will be many leaders who call the project manager and want to place the construction team in, which has become a norm.

For the construction team arranged by these leaders, as a project manager, you can't refuse all of them, once you reject them all, you will not become the target of public criticism!

But if they all agree, the cake of the project department will be divided up, and only a small part will be left for the members of the leadership team of the project department.

Faced with this situation, project managers are sometimes really difficult.

If it is an ordinary leader, it will be over if it is perfunctory, and it is completely possible to let the other party bid, and deliberately not let the other party win.

In this way, it will not offend the upper leaders, but the project manager has to use the construction team introduced by some leaders!

For example, in the case of Shu Cheng, Li Yifeng can be said to have great favor to Shu Cheng, and most of Shu Cheng's promotion was done by Li Yifeng for him.

Even the current position of project manager is done with the help of the Li family.

Like Li Yifeng himself, under normal circumstances, he would not introduce the construction team to Shucheng, unless Shucheng himself proposed that the construction team was needed, and Li Yifeng would find a way.

Now it is different, Li Yifeng's second brother signaled to Li Yifeng, hoping to arrange a construction team to enter the heavenly route.

Although the construction environment of the day route is harsh, the unit price is very high, that is to say, as long as you can receive the work of the day route, you will definitely make money, and even make a lot of money!

Such a good opportunity, how can those construction teams who have a relationship give it up?

They must have sharpened their heads, looking for all kinds of relationships, and wanted their construction team to go to the heavenly route and get a piece of the pie! (To be continued.) )