Chapter 18: Teach You to Work
Just as Shu Cheng imagined, when Shu Cheng reported the existing caisson situation to the technical department, Wang Ba, deputy director of the technical department, contacted the design institute according to the text and on-site pictures provided by Shu Cheng.
Jianzhi is what we often call the owner.
Of course, after communicating with the designers of the design institute, the deputy director of technology who built the finger and the designer of the design institute, decided not to dismantle the flake stone, but to punch holes in the flake stone, and the spacing was not necessarily required to be 30 cm, but between 30 and 70 cm, and the on-site technician controlled it himself.
Moreover, where there is a piece of stone, the number of layers of planting bars can also be one layer less.
That is to say, the original six-layer planting reinforcement can be used in five layers, which is equivalent to one less layer of planting reinforcement.
The design institute just said that it could use five floors, and how many floors the site really used, or Shucheng had the final say.
Moreover, even if it uses five layers, Shucheng will give six layers when settling, no one can see it, and no one will look at it so carefully.
In the eyes of others, according to the six-layer planting settlement, it is a normal thing, a complete review of the design, within the scope of the contract settlement, even if the leader asks, there is a reason to explain.
The caisson that exists today has a diameter of six meters, and its circumference is 2πr, which is a circumference of 18.84 meters, as if the planting bars are set at a distance of 30 centimeters, and there are 63 steel bars.
63 steel bars with a diameter of 22mm and a length of 1.5 meters, equivalent to the weight of 300kg, today's steel bar is about more than 3,000 pieces a ton, if it is sold second-hand, if it is sold for nine meters, it can be sold for at least 2,000 yuan a ton.
300kg is equivalent to 600 pieces.
What's more, there are actually more than these steel bars, the 300Kg, just a circle of planting reinforcement saved, and a circle of stones, the distance increases, as if Shucheng will increase the distance to 60 centimeters, this distance, completely review the requirements of the design institute, it is equivalent to saving 150kg of steel bar.
Add one lap saved, and that's 900 yuan.
In order to know more accurately how much a circle of planted tendons is, Shu Cheng measured the circumference with a ruler, and it was not 18.84 meters, only 17.9 meters.
And the new bearing cap will be six meters caisson only wrapped in a part, and a part, wrapped in a diameter of 2.4 meters pier body, caisson and pier body, with a slope connection, because there is no specific elevation, on the slope also have to plant reinforcement, this number, must be smaller than 17.9 meters.
In any case, after Shucheng calculated, a bearing platform came down, and the construction team was settled according to the drawings, and the steel bar could save almost 800kg, which is 1600 yuan!
This steel bar, logically speaking, cannot be settled, as if it is settled, then this part of the steel bar is Lu Tao, the foreman of the steel bar, and this part of the steel bar can be handled by Lu Tao.
What Shucheng has to do now is how to communicate with Lu Tao, this amount of steel Shucheng can give Lu Tao, but Shucheng must take ninety percent of the money from selling steel bars, because if this part of the steel bar is added when the settlement is made, the cost of processing and transportation of this part of the steel bar is what Lu Tao gets, even if Lu Tao can't sell the money of the steel bar, he also earns it.
The reason why Shucheng gave Lu Tao this part of the money was because it was impossible for Shucheng to come forward to sell the steel bar, and it had to be pulled by Lu Tao to sell, and Lu Tao's hard work was counted.
In addition, in addition to selling ninety percent of the money for this part of the steel bar, Shucheng also asked Lu Tao to give him the money to plant the reinforcement.
What is the cost of planting reinforcement, which is the cost of implanting this 1.5-meter steel bar into the hole.
The cost of implanting a steel bar is 4 yuan, and the actual situation on the site is that the work of this part of the steel bar has not been done at all, which is regarded as Lu Tao's white use.
Of course, Shucheng can't be cheap Lu Tao, even if he can't take all the cost of planting tendons, it will be at least eighty percent!
Pinch and calculate, a bearing platform down, the number of roots without planting reinforcement in this part, there are about 150.
If a piece is 4 yuan, even if it is 600 yuan, plus the 1600 yuan just now, it is 2200 yuan.
2,200 yuan, even if Shucheng takes eighty percent, it is almost 1,800 yuan!
That is to say, after a bearing platform is dried, the money that Shucheng gets from the steel bar is at least more than 1,500 yuan, not only Shucheng, but also Lu Tao will get no less than 1,000 yuan in this regard.
The income of a cushion cap in terms of steel bars is 1,800 yuan, and if you do two a month, it is 3,600 yuan, plus the money for foundation pit excavation and sandbag protection just now, even if you do two cushion caps a month, there are 4,000 yuan.
If one can do four cushion caps a month, the income will be doubled, directly 8,000 yuan!
For the steel mesh sheets, Shu Cheng didn't dare to start, because it was easy to be exposed, and those quantities were all designed, and it was not easy to get them at all.
This money is only the money for foundation pit excavation, sandbag protection, and reinforcement planting.
There is also one money that is overlooked, and that is the money for drilling.
You must know that 150 steel bars are not implanted, that is, these holes are not hit, but the settlement is settled.
Punch a hole, it is also 4 yuan, which is 600 yuan, even if Shucheng takes half, it is 300 yuan, and the two bearing platforms are 600 yuan.
Coupled with a monthly salary of more than 4,000 and occasional bonuses, Shucheng's income has entered the 15,000 mark.
Of course, in terms of punching, Shu Cheng couldn't find Lu Tao, he had to find Zhao Qingming.
Even foundation pit excavation and sandbag protection have to find Zhao Qingming.
For Lu Tao, the only thing that can be solved is the money from selling steel bars and planting reinforcement.
Next, what Shu Cheng had to do was to discuss with Lu Tao and Zhao Qingming.
Shu Cheng believed that they should not object to his words, because this would be beneficial to both Zhao Qingming and Lu Tao.
Two days after the excavation of the foundation pit, the reinforcement of the No. 6 bearing cap has been completed, and the reinforcement mesh has been tied. On this day, after arranging the work, Lu Tao was going to drive to the town to buy some vegetables and steamed buns and come back, and after seizing this almost, Shu Cheng got into Lu Tao's car.
For Lu Tao, in Shu Cheng's mind, there are still some memories, and Shu Cheng's evaluation of Lu Tao is that this person will come to things and have a flexible brain.
"Shu Gong, the work on the spot, when you don't do it well, I still need more guidance from you." On the way there, Lu Tao chatted with Shu Cheng.
"You can rest assured about this, Lu Gong, by the way, how much is your tendon plant?" Shu Cheng said tentatively.
"One hole is only four yuan, and it's not a lot." Lu Tao said.
"Have you counted the number of residuals?" Shu Cheng asked.
"I counted this yesterday afternoon, isn't it 253?" Lu Tao said.
Shu Cheng nodded, in fact, when he completed the reinforcement planting yesterday, he also counted the number of reinforcements planted on the No. 6 bearing platform, which was indeed 253, and Lu Tao and Shu Cheng also counted it at that time.
This is because it relates to the amount of reinforcement at the time of settlement.
Hearing Lu Tao's words, Shu Cheng was not ready to give Lu Tao a twist, and said: "Lu Gong, you also know that this cushion cap is not planted according to the design, but when I settle, I can settle it for you according to the design." ”
When Lu Tao heard Shu Cheng's words, he was obviously stunned, and the speed of the car suddenly slowed down, and the next moment, Lu Tao's face bloomed with a bright smile, and said, "Shu Gong, what do you want me to do!" ”
Obviously, Shu Cheng's words, Lu Tao understood as soon as he heard it.
"You take the part of the money for the processing and transportation of steel bars, as for the money for planting steel bars and selling steel bars, I take ninety percent, but you must sell steel bars, and I don't interfere." Shucheng Road.
Shucheng knows very well that the money for processing and transportation of a ton of steel bars is more than 800, as if you add that 10% of the money, there will be more than 1,000.
In other words, as long as Lu Tao sells the excess steel bars and makes some effort, he can get more than 1,000 for no reason.
There are more than 1,000 caps for one cap, and 20 caps are 20,000!
Such a good thing, how could Lu Tao not agree.
"No problem, it's on me!" Lu Tao readily agreed.
Seeing that Lu Tao agreed, Shu Cheng didn't say much, so he changed the topic and talked with Lu Tao.
In Shu Cheng's mind, he was thinking about how to talk to Zhao Qingming about this, because Zhao Qingming was not like Lu Tao, Zhao Qingming was more treacherous than Lu Tao, and it was difficult to deal with. xh118