Chapter XVI Additional Income
The days of Shucheng began to repeat, and in a blink of an eye, half a month has passed, and the pile foundation construction of K88 has been completed 4, and the fifth and sixth pile foundations are under construction.
During this time, Lin Yu took the initiative to make a few more calls to Shu Cheng, but Shu Cheng's thoughts about Lin Yu were really much indifferent to him.
Twenty years after his rebirth, Shu Cheng was horrified to find that with the passage of time, the figure that used to be had long since faded into the years. In Shu Cheng's mind, the thoughts of Wu Qingling became deeper and deeper as time passed.
Maybe it's because Wu Qingling has long been deeply imprinted in Shu Cheng's mind.
K88's deputy manager in charge of Wei Jian, came to the construction site every two days, after all, he is the deputy manager in charge of the three stations and two sections, and there are many local matters that he needs to deal with.
In particular, the superb skills displayed by Shu Cheng amazed Wei Jiandu.
"Manager Wei, you see that the pile foundation of the No. 6 bearing platform is finished, should we try to dig it to see if the foundation pit can be excavated?" After Wei Jian came to the K88 bridge reinforcement site again, Shu Cheng said to Wei Jian.
Wei Jian has dark skin, his stature is not tall, at most one meter six five, and his face is covered with red Xiaodoudou due to frequent drinking. Wei Jian is in the project department, he has always been a drinker, he not only drinks, but also likes to drink high alcohol, spirits, and also likes to smoke.
At noon and in the evening, he could not eat without drinking.
Hearing Shu Cheng's words, Wei Jian looked at the scene and said: "The water level of the river at the site is so high, this No. 6 pier may not be able to be dug open, and the leaders have not made a plan." ”
When Shu Cheng heard it, he didn't want to do it very much, and Shu Cheng knew Wei Jian's thoughts very well, because there were not many projects on the entire Jersey line, and there were many inspections on the existing line transformation.
As long as you work, there will be problems, and the more you work, the more problems there will be. In addition, there are few projects, and the number of on-site inspections by leaders will definitely be more frequent.
At this time, the pile foundation was opened at the same time, and the superior leaders came to check, and there must have been a lot of problems found, which added a lot of trouble to the scene.
If the project department of other sites is also opened, resulting in a big situation, in this way, other construction sites will inevitably attract the attention of superior leaders, and it is the best attention to open the bearing platform at this time.
Wei Jian thought so, but Shu Cheng didn't think much.
If Shu Cheng remembers correctly, the shallow foundation reinforcement project of this 20 piers of the bridge has been done for a year, and if it was done in advance in the previous life, the bearing platform on the shore can be completed in less than three months, and as for the bearing platform in the water, it can be completed in two months at most, so that more than half of the time is saved.
Whether it is for the project department or the person in charge of the construction site, it is beneficial, and these quantities of work are all achievements and are recorded on the heads of the on-site construction personnel. Of course, the premise is that there is no accident.
After being reborn, Shu Cheng didn't want to follow the rules and continue to live like this, without performance, even if he was capable and had no opportunity to exert his ability, it would be useless.
Another important reason is that Shu Cheng wanted to get some money, and when he went back for the New Year, he talked to his cousin and asked her to introduce him to a girlfriend.
In the previous life, the reason why Shu Cheng and Wu Qingling were able to meet was because of the introduction of his cousin, Wu Qingling called Shu Cheng's cousin aunt, and Wu Qingling's place of work was in Shu Cheng's cousin's clinic, as a nurse.
As time went by, Shu Cheng wanted to see Wu Qingling more and more, especially after dinner tomorrow, Shu Cheng subconsciously took out his mobile phone and wanted to call Wu Qingling, this habit has not changed after more than a month.
Since the blind date, of course, you have to prepare more money, Shu Cheng and his old-fashioned in the previous life, he will get some dead wages every month, as well as the bonus of the project department, and in a year, it is only forty or fifty thousand, except for expenses, there is not much left.
After being reborn, Shu Cheng will definitely not be so 'safe and self-contained', when he came to do the K88 bridge reinforcement, Shu Cheng had a general idea in his mind, how to get more benefits in the case of safety.
After all, Shu Cheng is also an ordinary person.
Pile foundation construction, Shucheng can not have any external water, because the supervision of the existing line reinforcement, all day and night at the construction site, can not leave, it is more difficult to do hands and feet, and the construction of the bearing platform is different.
First of all, the construction of the cushion cap, you have to excavate it, this earthwork excavation and transportation, one side is eight.
If you are measuring the foundation pit on site, you are stuck in the construction team, and when you settle the settlement, you add some to him, not more, 12 meters long and wide cushion cap foundation pit, you add one meter respectively, add 50 deep, a cushion cap, at least you can make more than 100 square meters.
Eight yuan a party, this is thousands of dollars, you give one-third to the construction team, and you get two-thirds, which is almost eight hundred!
The excavation of a bearing platform is eight hundred, and only two can be done a month, and the foundation pit is one thousand six! Twenty bearing platforms are ten thousand sixteen.
That's not a small amount.
And Shucheng also knows that in more than a month, the project department will require output value, and the construction team will have four percussion drills to work together, which is four bearing platforms in a month, and four bearing platforms are three thousand two!
Shu Cheng's current salary is only a little more than 3,000, which is equivalent to a month's salary in Shu Cheng.
In addition to the foundation pit, Shucheng can also do hands and feet on the foundation pit protection, because the foundation pit is a sand layer, sandbags must be used to protect, the so-called sandbag protection, is to prevent the excavation of the foundation pit landslide, pile sandbags on the slope to prevent landslides.
When measuring sandbags, Shucheng can be completely stuck, and when the final settlement is made, add some to the construction pair, so that the foundation pit and sandbag protection can be calculated with two cushion caps a month, and Shucheng can be more than two thousand to three thousand!
If it is four bearing platforms, the additional income of that month will be close to 5,000.
Whether it is foundation pit excavation or sandbag protection, after the cap is finished, it will be backfilled, as long as it is backfilled, no one can find a little evidence, who said that Shucheng did tricks? And on the backfilled soil, Shu Cheng can still do some hands and feet, but not very much.
In fact, many technicians have used this method, in the previous life, after Shu Cheng became the Minister of Technology, he listened to the following technicians talk about it inadvertently, and only then did he know that there was such a small ninety-nine.
Compared to the whole project, this is really a small amount of money.
In addition to the foundation pit and sandbag protection, there is another item, which is the most important thing for Shucheng, if the bearing platform starts construction, even if it can be done two a month, Shucheng's monthly extra income can be close to 10,000, plus wages, at least 15,000 a month.
Now, the deputy manager Wei Jian is obviously reluctant to excavate, but Shu Cheng is unwilling to give up, he smiled and said: "Manager Wei, otherwise, the next time we come to the excavator for pile foundation positioning, we dig and try to dig, if it is okay, I will prepare a plan, and then report to the project department Manager Zhang as the manager, after all, the pile foundation, this output value is too little!" ”
Seeing Shu Cheng say this, Wei Jian couldn't say that he couldn't excavate, after all, Shu Cheng's words were also for work, he pouted, and said: "Okay, when these two pile foundations are poured, you can dig a pit and give it a try, don't dig too big, how about standing water?" If the No. 6 cushion cap can be done, there will be no problem with the other cushion caps on the shore. ”
"Okay, I'll try it then." Shu Cheng responded.
Shu Cheng is well aware of the situation at the scene, and of course he knows that the bearing platform here, even if it is the No. 6 bearing platform closest to the river, there is still not much water, and it can be excavated.
What Shu Cheng has to wait for is Wei Jian's consent, as long as Wei Jian agrees, Shu Cheng will be easy to do.
As for Zhang Xiaoyun, the captain of the on-site operation team, this guy doesn't care much about anything, and most things, whether technical or on-site, are decided by Shu Cheng.
After seeing Wei Jian's promise, Shu Cheng looked at the No. 6 bearing platform, as if he saw a lump of gold there, waiting for him to get it. xh118