Chapter 166: A Whim

"Fourth: the next step of the steel processing plant and a series of temporary program preparation, due to the continuous beam more, the next step of these continuous beam construction, I think it is necessary to edit some highlight plans, as a key project, to meet the inspection of the next level. {We don't write novels, we're just online text porters-[Sui_Dream]Novel www.mеng.lā" Shu Cheng said one by one: "Fifth, it involves some preparation, management system, departmental rules and regulations, as well as internal data collation, technical disclosure of each sub-distribution project and training of each construction process, which will be the next step to be done."

When Li Yifeng asked, Shu Cheng didn't think about it so much at all, and directly said the work that needed to be carried out in general.

Even so, it was relatively well thought out.

After saying this, Shu Cheng paused and frowned slightly, and couldn't think of anything else for a while, so he said: "That's all we can think of now, but these are enough for us to be busy, and of course, there is one more thing, complete the work assigned by the leader!" ”

This sentence is also often used by Shucheng, once the leader asks to write what work has been completed recently, a sentence to complete the work assigned by the leader includes a lot of content!

After Shu Cheng finished speaking, Li Yifeng nodded again, and then said, "Highlight plan? This is good, the continuous beam construction not only has a long construction period, safety and quality is also the key, plus more inspections, get a few highlight plans, it is indeed feasible! ”

"Well, I also had this plan before, since Shu proposed it, let's come up with a plan first." Ren Changhong said.

"Okay, then that's it for today's meeting, adjourn." Li Yifeng looked at his watch, it had been open for more than two hours, and said.

After speaking, before Shu Cheng could react, everyone had already begun to pack up their things, and they didn't know whether Li Yifeng was satisfied or dissatisfied.

By the time Shu Cheng packed up his things, Li Yifeng had already walked out of the room.

"Shu Cheng, yes, Mr. Li has never praised anyone." Before leaving, Li Jianguo, secretary of the Party Working Committee, suddenly turned his head. said to Shu Cheng, making Shu Cheng scratch his head.

Shu Cheng couldn't help pouting, as if Li Yifeng didn't praise himself so much in the end.

But these are no longer something that Shu Cheng can manage, and he still has a lot of things to do.

……………………………………………………………………

Since the first plenary meeting of the project department. Hao Hongwei and Zhang Bo and other people in the technical department were a little afraid of Shucheng.

In the face of the work arranged by Shu Cheng, he completed it very seriously, and it was completed in a timely manner, which Shu Cheng did not expect.

Three days after the meeting. Under the leadership of Gao Zhiqiang and Weng Yunxing, deputy managers of the project department, they are ready to conduct an overall investigation on the requisition and demolition, high and low voltage lines, and buried pipelines along the line.

Like the last time Shu Cheng went to the construction site with Ren Changhong and Gao Zhiqiang, this is completely simple to investigate the route, and it is to find some landmark points, and after reading it, go to the next place.

In this preliminary investigation, a line is carried out from beginning to end with GPS, and then various situations on both sides of the line are investigated clearly according to the direction of the line. This is followed by an investigation report.

For the preliminary investigation, Shu Cheng did not participate in person, as the minister of the technical department, as long as these things are arranged.

For the positioning of the line, Shucheng handed over to Zhang Bo to be responsible, and now Zhang Bo is not only the deputy minister of the technical department, but also assumes the position of the survey captain of the project department. At the same time, Shucheng also assigned technician Wang Guangjian and trainee Xu Minmin to Zhang Bo to cooperate with the on-site measurement work.

In addition to the survey team to help determine the direction of the route on the spot, Xu Jin and Hao Hongwei also participated in the on-site investigation, and their task was to investigate the scene. Take a record and take a photo, and then compile it into a text form and write an investigation report, this material. It also has to be reported to the construction headquarters, and at the same time, it will also be of great help to the future requisition and demolition.

When he went to investigate, Shu Cheng had already handed over the use of handheld GPS to Zhang Bo, because up to now. The total station and the GPS set by the project department have not yet arrived, and as long as the general problem is known in this survey, it is enough to use handheld GPS.

And Shu Cheng has been busy with the project department planning from the early stage these days, and this one thing is enough for him to be anxious.

The so-called pre-planning is to make preliminary plans for the project of the project department and take all aspects into consideration.

For the template of the pre-planning, the various engineering units are similar, from the big aspect. Including: project overview, project management mode, main management objectives of the project, product list, management responsibility matrix, cash flow analysis and capital plan, general staff performance appraisal method of the project department, temporary engineering and general construction layout, construction sequence and plan arrangement, main technical scheme, internal resource allocation plan, construction machinery and equipment use approach plan and material procurement plan, project change, claim plan, risk pre-control plan, corporate image publicity, on-site civilized construction and environmental protection plan, Project talent training program, subcontracting program

Seventeen contents, the plan includes all the contents, and the compilation of these things may not be completed in a week, not to mention that when compiling these things, there are still a lot of materials and investigations, and it is necessary to do it one step in advance.

For the general situation of the project, each project must be used, including the project overview, the so-called project overview, is the scope of the project department (mileage range), line direction, construction, design, supervision units and so on. Of course, there are also project costs, contract durations, main technical standards, and major project quantities.

In addition, it is necessary to compile the natural conditions (including topography, geological conditions, climatic characteristics, hydrological characteristics), construction conditions (including transportation conditions, construction materials, construction water, electricity), main characteristics, key points and difficulties of the project within the scope of the line.

For example, the construction of Majiahe continuous beam, cross-Heping Road and Heping high-speed continuous beam, and ballastless track are all key and difficult.

At this point, I have finished writing the overview of the first project planned in the early stage, and I have to write ten pages of paper for this thing. You know, the guy who burned the pig pit couldn't finish three pages after writing for three hours. However, many things in the project overview can be found from the information given by the design institute.

For transportation, materials, water, electricity, etc., they all need to be written after on-site investigation, such as the earthwork situation, because the project department did not conduct a preliminary investigation, Shucheng can only empty it, and wait for the investigation to be completed. Write the findings into it.

However, investigations such as materials are all matters of the Ministry of Materials, and there is no need for engineering preparation, and the investigations are all completed by the Ministry of Materials and sent to Shucheng in the form of words.

The next step is the management mode of the project department and the main management objectives of the project. These are relatively simple, the so-called world article is a big copy, you can move the previous project department to do the preliminary planning, such as the project organization setting plan, the main responsibilities of each functional department, are all the same.

Only the task division of the construction team. Shucheng can't fill in, because up to now, there has been no construction team to declare, and the bid of the project department is mainly because the project department is not a real entry point.

The next few items, such as product list (including engineering products, organizational products, management products, social products), management responsibility matrix, cash flow analysis and capital plan, and general employee performance appraisal methods of the project department. Only the first and second items need to be compiled by Shucheng, and the latter two are the affairs of the Finance Department and the General Department, and after they are compiled, they will be directly passed to Shucheng for summarization.

From the first to the seventh, the content is relatively simple. Shucheng did not spend much time, and the eighth item, temporary works and general construction plan layout, most of them need to be completed by Shucheng.

Temporary works, including project department station, construction road, spoil (slag) yard, steel bar and steel structure processing yard, prefabricated parts processing yard.

These contents are all the contents of the temporary plan, and each content is to prepare a plan and report to the company, and none of them can be completed in a day or two.

For example, construction sidewalks. At the first meeting of the project department, Ren Changhong originally wanted to discuss how to set up the road, and finally after watching the plan prepared by Shucheng, it was decided.

and the preparation of a sidewalk plan. Shucheng spent three whole days! So these items are also more troublesome, but it's okay now, Shucheng has completed these plans in the early stage, and now when the preliminary plan is prepared, these things can be put in it. Saves a lot of time.

It's just that the steel bar processing plant and the prefabricated parts processing plant have not yet been decided, and Shucheng can only write some general content.

For the next construction sequence and planning arrangement, internal resource allocation plan to the final subcontracting plan, most of them are not the affairs of the engineering department, all prepared by the heads of several departments of the material department, the budget department, the comprehensive department, the safety and quality department and the finance department, and Shucheng does not have to take care of it.

Finally, one item is left, and it is also the most difficult content to compile, the main technical solution!

Since it is a plan, of course, it is what Shucheng needs to complete, in fact, this content should be compiled by the chief engineer Zhou Yang, but after Shucheng and Zhou Yang discussed, Zhou Yang directly called Shucheng to prepare, and he did not do this work.

The reason is very simple, after the last meeting, Zhou Yang has no confidence in Shu Cheng's ability and his belief in it, and he is completely relieved to hand over such things as pre-planning to Shu Cheng.

Zhou Yang is now busy with the preparation of continuous beam schemes, which are also the key plans of the project department, and the construction organization design of the bridge and roadbed are all prepared by Zhou Yang himself.

Since Zhou Yang didn't do this job, Shu Cheng couldn't help it, so he did it himself.

For the main technical scheme, it is equivalent to compiling the construction plan of all projects of the project department.

For example, the subgrade construction plan needs to be prepared from the soft foundation treatment scheme (including cement mixing pile, impact rolling), earthwork deployment plan, subgrade filling, trench excavation, subgrade slope protection engineering construction, pavement surface and underground drainage and other aspects, and summarize them into a subgrade construction plan!

The construction plan of the bridge and culvert project, from the bottom of the bored pile construction plan, the cap construction plan, the pier body construction plan to prepare, each plan, to write from the pay-off project to the completion of the construction of the project, the operation process is not less.

In addition, there are comprehensive grounding, continuous beam construction, bridge-related supporting engineering construction (abutment waterproofing, cone slope protection, inspection steps, pier abutment ancillary equipment, background filling), ballastless track construction, crash wall construction, sound barrier and protective fence, bridge deck waterproof construction.

Especially for the construction of ballastless tracks, before this, there was no precedent at all, and it seemed a little ridiculous to let Shucheng come up with a plan.

Even if Shu Cheng can compile it, he doesn't dare to compile it too perfectly.

However, thinking of the preparation of the ballastless track plan, Shu Cheng suddenly felt that if he wrote an article about the construction of the ballastless track, or wrote some articles about the high-speed railway, and submitted it to the magazine for publication, it would really work!

ps:This chapter is a reference for some colleagues who haven't prepared a pre-planning.,In addition,There are very few pure technical chapters behind.,The main thing is to solve problems on the spot.,The protagonist is going to start pretending to be slapped in the face.。 (To be continued.) )