Chapter 142 Major points of construction

On the 25th of April, it began to pour heavily, and it should be said that since the night before, it has been pouring heavily in the city of Thailand, and there is no sign of stopping until the 25th. Bayi Chinese Network? w?w?w?.? 81?z?w?. com

Although the main point is eight hours, from 9 o'clock in the morning to 5 o'clock in the afternoon, all the employees of Hao Village got up at 6 o'clock in the morning, had breakfast, looked at the heavy rain, and waited for it.

These were also requested by Wei Jian, who originally planned to arrive at the construction site before seven o'clock, but was delayed due to the heavy downpour.

At the same time, Wei Jian contacted the project department and asked to send raincoats to every employee, because in the process of the main point, like the on-site technicians, it is necessary to use the level level and the insulated steel ruler to help the construction team determine the relevant points of the turnout.

So umbrellas definitely won't work, and each person must put a raincoat.

In the early morning, Wei Jian arranged for Guo Tao to buy it on the street of Haocun, and the raincoats in Haocun were sold out even from a few years ago.

The people who bought these raincoats were not personnel from the Jersey project department, but the construction team of the construction station.

When it began to rain yesterday afternoon, the construction team specially arranged for people to buy the raincoats on Haocun Street.

Therefore, none of the members of Haocun Residency had raincoats except for a few umbrellas, so they could only rely on the project department to transport them.

Obviously, Zhang Tianhu had already arranged for the material department to prepare for this matter, and when Wei Jian called, he had already arranged for the material department to go to Taishi to buy a raincoat.

However, there is too much demand, because there are a total of three stations under construction today, namely Haocun Station and two stations managed by Sun Qi.

Therefore, when the project department buys raincoats, there are more than 70 members of the project department (including service assistants), as well as relevant helpers in the public works section, electricity section, communication section, construction index, supervision, construction headquarters and subsidiaries.

These personnel, in total, are more than 200 people, and they are only leaders.

With so many raincoats, even in large shopping malls, they may not be able to be taken out at one time.

Therefore, it is obviously unrealistic to send it to the Haocun station immediately.

It was half past seven. There is still no end to the sight.

At this time, Wei Jian couldn't hold back anymore and went to the construction site first.

Wei Jiandu is on the construction site, and others will definitely not be able to stay at home. They got on the bus and went to the construction site.

Shu Cheng and Xu Jin were the second group to take a car to the construction site.

When Shu Cheng and Xu Jin came to the construction site, fortunately, yesterday afternoon, the project department set up a rain shelter of more than 2o square meters on a flat land filled with sand. Wei Jian and the others were already waiting here in advance.

Rain has fallen from the sky, and small streams have formed on the ground.

In the whole site, except for the members of the project department of Haocun Station, there were no migrant workers of the construction team, nor members of the construction department and the public works section.

Obviously, because of the heavy rain, these people have not arrived.

However, as such a large-scale construction point, it will definitely not be canceled or changed because of the rain.

Even if you cut down today, you have to do construction. Completed the corresponding task.

At eight o'clock, Shucheng finally saw the figure of some migrant workers, most of whom came on foot, and some came to the scene as pickup trucks.

Many of the migrant workers did not wear raincoats, and many carried umbrellas. At a quarter past eight, Wei Jian took a car to Haocun Station to attend the meeting before the main point.

At half past half, around the rain shelter, there were migrant workers everywhere, Shucheng made a preliminary estimate. This time, there are more than 35o migrant workers.

These migrant workers are only working on the large mileage side, and there are dozens of migrant workers who are working on the small mileage side, and they have gone to the small mileage side.

Today, there is only one construction team working in the small mileage, while there are two construction teams in the large mileage.

Every construction team. Dismantle a set of turnouts and related line sleepers respectively, and then pull in a set of turnouts to lay the relevant lines.

Guo Tao and Xu Jin had already followed Manager Zhang to the small mileage side of Hao Village to wait for the key orders.

At the same time, off-road vehicles, vans, and pickup trucks entered the construction site. These are the leaders and employees of the Public Works Section and other relevant departments.

At this time, the small truck that delivered the raincoat from the material department of the project department finally arrived.

All the employees of Haocun Station, as well as the leaders of the construction and public works, received a raincoat and rain pants, which were combined into a set.

At 8:45, the pre-point preparation meeting ended, Wei Jian returned to the rain shelter, and at the same time, Zhang Tianhu's car also appeared at the construction site.

For this sub-division, Zhang Tianhu is in charge of Haocun Station, Li Yifeng is in charge of Lin Cun Station, and Han Ping is in charge of Sicun Station.

Three leaders in charge, in charge of the overall situation, deputy manager Wei Jian and others, are mainly in charge of on-site construction to ensure that it is completed on time.

At 8:55 a.m., the station liaison officer reported on the walkie-talkie and told the site that the main points began and construction could begin.

In Zhang Tianhu's loud roar, more than 35o migrant workers, like ants, poured into the big mile side.

"Don't mess up, everyone, according to the division of labor before the point, follow your own person in charge!" More than 35o people are working together, and the momentum is huge, and I have never experienced it, and I can't experience that kind of chaos at all.

Excavators, railing machines, shouts, shouts, and the sound of rain are mixed together, so even if you shout loudly, only a few people nearby can hear it.

And what makes you depressed is that these people still don't listen to you.

Therefore, the general person in charge of each construction team uses a megaphone to loudly arrange the sub-leaders below to bring their own people and be responsible for the things that have been divided.

The first step is to lift the spikes of the turnout wooden sleepers, remove the turnout, according to the broken rail, according to the rail machine whining, sparks splash several meters, and a rail is sawed off in less than two minutes!

At the same time, behind the unloading of the bounce fasteners, some people specially use woven bags to collect bounce fasteners and other parts.

Because these materials and equipment need to be handed over to the public works section, they must not be lost.

When the rail sawing master sawed off the rails, the migrant workers who had been waiting for them began to use crowbars and other tools to rush the sawn rails to the side of the roadbed and push the rails to a place that was not in the way.

For some special parts of the turnout, there have long been migrant workers who use acetylene to cut.

When the switch and the rail were divided into sections, the migrant workers with crowbars in the rear had already rushed up and even carried the rails by hand.

After the rails were cleared, all the migrant workers put down their tools and began to work in groups of four to lift the sleepers to the places where they could store their things.

In a shout, everyone used force at the same time to lift the sleeper out of the line and place it in a position that would not affect the construction.

After the sleepers were cleared, the mini-excavators followed, and there were several of them.

One by one, the excavators began to excavate the ballast and then threw it to both sides, and at this time, it was the time for the technicians to go into battle.

The public works section requires that the old ballast must be dug at least 3o cm from under the original rail, so the technician needs to measure it with a level.

When Shu Cheng called Zhang Spray over to measure, Zhang Spray was completely dumbfounded, because he didn't know what he was going to do.

Even before the construction, Guo Tao explained something to him, but it was completely different from what Guo Tao explained, because Guo Tao had never done it before, let alone lectured Zhang Peng.

When Shu Cheng called Zhang Peng, the other party was still confused.

"Zhang Peng, you come to hold the ruler, and I will measure the thickness of the ballast." Shu Cheng arranged directly.

"Why do I hold the ruler, not you." What surprised Shu Cheng was that Zhang Spray was still arguing with himself at this time.

After Shu Cheng was stunned for a moment, he directly handed the total station to Zhang Fei and said, "Then you measure, I'll hold the ruler." ”

Since Zhang Peng wants to show Xiàn, Shu Cheng will give him the opportunity to show Xiàn! Originally, Shu Cheng considered that Zhang Peng didn't understand, so he asked him to hold the ruler, but he didn't expect him to be so willful.

"I... Or are you..."Before Zhang Yi finished speaking, Shucheng had already stopped birding him, and ran to the excavator, obviously going to hold the ruler.

Zhang Spray looked at the level in his hand, and was instantly stupid, because he had never used a level! He graduated from a junior college, and he didn't study civil engineering, and he didn't even use a level.

Now, just because of his hard mouth just now, Shu Cheng directly fulfilled him and asked him to measure, looking at the level in his hand, Zhang Spray felt like crying for the first time!

"Zhang Gong, quickly set up a mirror, see if the elevation has arrived?" Zhang Peng didn't move, the construction team was not happy, this is a time-grabbing job, a little less delay, it can't be completed within the specified time, and it will be fined.

Looking at the construction team looking at Zhang Spray, Zhang Spray's face suddenly turned red and he was at a loss! (To be continued.) )