Chapter 158 Investigation along the route
Li Yifeng's Third Standard Fourth Project Department is between Guojia Town and Changle Town, passing by several villages in the middle, most of the area is greenhouse crops, and very few places have to pass through houses.
On the second day after Shu Cheng arrived at the project department, he was taken out by Ren Changhong and Gao Zhiqiang.
When I saw Gao Zhiqiang for the first time, I found that the other party was about the same age as Ren Changhong, forty-three years old, but not as white as Ren Changhong, obviously walking more on the construction site, tanned, but in good spirits.
At this age, he is still the deputy project manager, generally speaking, he can't go up when he is old, he is not like Ren Changhong, at least he has worked as a project manager and enjoyed the treatment of a project manager.
Now he is the executive deputy manager of the project department under Li Yifeng, and he is only one step away from the real project manager.
"Shu, today I will take you to walk the route roughly, and then investigate in the neighborhood to see if there is a suitable place as a station, and when you come back, you edit a material, show me, and then write a temporary plan and report it to the company." got on Ren Changhong's off-road vehicle, and Ren Changhong said to Shucheng Road.
A newly opened project department needs to select a location as a place to work and live, but this place is not randomly selected, and the selected place must also be reported to the company and written in the form of a plan.
The content of the plan includes the comparison of several sites, which plan is finally determined, why this plan is chosen, and what are the advantages of choosing this plan?
The so-called advantage is the distance to the construction site, all year round, if a project department is closest to the construction site, it will take an hour to drive. It's certainly impossible to choose.
Most of the sites are either near or not far from the site. This is selected from the distance. In addition, there is the construction aspect of the station. After choosing a station, you also need to consider planning, several plans to build a station, so which plan is the most cost-effective, from the economic aspect should also be considered.
Whether it is cost-effective to decorate it yourself after renting, or it is cost-effective to decorate it and go directly to live with your bag, these must have a cost budget, and then put these contents. Edit into a temporary plan to the company.
Many new employees only know where the project department is building the station, whether to rent or board house, but few people consider why they choose such a plan, in fact, before the construction project department, the leadership team of the project department has considered these problems.
"How many times has Manager Ren been to the site?" Manager Gao asked at this time.
After understanding, Shu Cheng learned that Gao Zhiqiang had only been in this project department for a few days, which was not a long time. Most of the work is still Ren Changhong running, as for Li Yifeng, he is rarely seen.
In fact, the executive deputy manager is equivalent to the manager. The vice president in charge is generally hands-off and only moves around when there is something important that needs to come forward.
"I went to Mr. Li once, but I only know some points in general. The detailed direction has to be cooperated with the technical department on the spot, after the investigation. to be sure. Ren Changhong said.
Ren Changhong is not a technician after all, so it is impossible to take GPS to find the line. You can only know the direction of this line according to the floor plan, according to the buildings on the plan.
As for the details of a few meters in the vicinity, this investigation work has to be confirmed by the technical department and the deputy manager of the site to conduct a comprehensive and detailed investigation.
At that time, it is not enough to look at the floor plan, but also to carry GPS, according to the pile data or the coordinates of the pier body calculated by the project department, to locate and search.
The so-called pile data is a coordinate table established by the design institute when designing, which includes the intersection coordinate table, pile coordinate table, broken link table and curve table, the project department calculates the coordinates, and the pile data is indispensable.
"Manager Ren, is there a reference for the location of the station?" Shu Cheng asked, logically speaking, since Ren Changhong and Li Yifeng have been to the scene, they must have also investigated the surrounding situation, and the location of the station must have been considered.
"I've seen a few places, and I'll take a look around when the time comes, and see if there's anything more suitable." Ren Changhong said.
Then, the buggy drove all the way north, about forty minutes or so, and stopped on a small road.
"The location of the Biqu Pavilion of our project department is www.biquge.info in this place." Ren Changhong said a word, and then opened the door and went down.
Shu Cheng pushed the door and walked down, looking around, a wheat field here, very wide around, without any buildings, only a few willows occasionally appearing on the side of the road.
"According to the plan, facing the direction of the large mileage, three hundred and fifty meters to the right of this road, is our railway." Ren Changhong pointed to the general location and continued: "As for the www.biquge.info of Biqu Pavilion, about three hundred meters to the right, it is the junction of our project department and the third department. ”
"It's a nice place, it's about two kilometers of roadbed, right?" Shucheng was generally affected, and said casually: "As long as the soil source is convenient, the roadbed in this section can be started first, and there is no requisition and demolition." ”
The project department that does the construction likes this kind of land acquisition for all crops, because it does not involve the demolition of factories and residential houses, and the process will go very smoothly.
As soon as the construction starts, this side can be used as a pre-construction project to start construction.
"Yes, I think if you want to do the yàn paragraph, you can also choose here." Gao Zhiqiang also added.
"The real yàn section must be done, as long as the sidewalk is pulled through here, the filler can still be fed." Ren Changhong nodded.
To put it bluntly, it is to select a section first, carry out the real section, see the effect, what problems will occur, and if there is no problem, you can build a large area.
Moreover, some problems can also be found in the real yàn section, which can be avoided in large-scale construction.
Not only the roadbed, but also the real yàn section is also necessary before the construction of the ballastless track.
"Then there's nothing to see here, it's okay to requisition and demolish land, let's move on to the next paragraph." Gao Zhiqiang said and continued: "Although the village near here is not far away, it is obviously not suitable for building a station, it is too far away from the big mile!" ”
Gao Zhiqiang's words are obvious, the project department is stationed. The most suitable place is in the middle of the line. Choose on both sides of the adjacent line, if you choose at one end. The distance to the other side is too long.
It's more than 12 kilometers away, and it takes a lot of time to turn off the car.
Of course, some projects are indeed selected in the project departments on both sides because of their special needs.
"Let's go to the Majia River in the next section, where there is a 72-meter continuous beam." Ren Changhong said.
With that, the three of them got into the car and walked in the direction of back, walking for about a kilometer. I saw some villages.
"Manager Ren, have you seen these villages? Is there a suitable house? Gao Zhiqiang asked.
"I also inquired here, and there is a factory about 2 kilometers ahead, so let's go and see it later." Faced with Gao Zhiqiang's question, Ren Changhong replied.
In less than ten minutes, Ren Changhong and the three of them came to the factory.
The off-road vehicle was parked at the gate, and Shucheng got off the car. It was found to be a small courtyard, the entrance is an electric door, and to the left of the door is a 3-story rough building, which is estimated to be 700-900 square meters in Shucheng. On the right side is also a 3-storey independent building, and there are three steel structure workshops inside.
After Ren Changhong got out of the car, he introduced: "This factory belongs to Guojia Town. The three-storey rough building on the left is about 750 square meters, and the building is in the form of a steel structure frame. It can be used as a living and office location; The 3-storey detached residential building on the right can be used for living quarters and is only a kilometre away from our Majiahe Connecting Beam. It is also the shortest distance, almost parallel to the Majiahe Connecting Beam; And there are three workshops inside, we can convert the 1# small workshop into a kitchen, dining room, bathroom, activity room, etc., 2#, 3# large workshop can be used as a steel processing site, for the use of small mileage end of the extra-large bridge, and the warehouse has a side door to meet the entry and exit of heavy vehicles. ”
Listening to Ren Changhong say this, Shucheng feels quite suitable, but it is not suitable for the steel processing plant to be built here, from all aspects, there is no problem with life and office.
"There are also transformers in the hospital." Shu Cheng added.
"Well, the 400kw transformer, and there are independent wells, tap water supply, there is no problem with the demand for water for life and production." Ren Changhong said.
"How's the price?" Gao Zhiqiang asked.
Having said so much, suitable is appropriate, I am afraid that the price is too high, after all, the economy still has to consider one aspect.
"In terms of price, I also got in touch with the owner, and the unit price is about 0.4 yuan/square/day, which is almost 715,400 yuan/year. If you really rent here, you should be able to get it for 650,000 yuan/year. Ren Changhong introduced.
"650,000 a year, a little expensive!" Gao Zhiqiang pondered for a moment.
"Well, that's a bit high." Ren Changhong also said.
Four years have passed since the high-speed rail project, and if you live here, the rent will be 2.6 million, and the electricity bill will be calculated separately, so you will need 3.5 million if you can't get it.
"Shall you go in and have a look?" Ren Changhong asked.
"Forget it, let's see if there's anything else." Gao Zhiqiang said.
As for Shucheng, he has no intention of going in to see it, and 650,000 a year is also expensive for Shucheng.
"Then let's go to Majiahe Lianliang first to see the situation." Ren Changhong said.
The three of them were led by the driver, and in less than five minutes, they came to a small river.
After getting off the car, Ren Changhong to: "This small mileage to Majiahe, most of them are wheat fields, and it is easy to requisition and demolition. ”
"I don't know how deep the water is?" The three of them came to the Majia River, and Gao Zhiqiang said.
Shu Cheng found that the river is now in the rainy season, and the width of the river is up to 45 meters, and if it is a dry season, it should only be about 40 meters.
"The design is about 8 meters in the rainy season and about 6 meters in the dry season." Shu Cheng replied, these numbers are all given by the design institute, and there should be little difference.
"Well, it's about this number, and the main pier shouldn't have much impact." Ren Changhong said: "Just think about whether to build a pontoon bridge, if you want to detour, the construction team will be very troublesome to construct." ”
"That's a real problem." Gao Zhiqiang also nodded.
The nearest bridge from this continuous beam, there is also a kilometer, if the construction team goes back and forth, it can waste a lot of time, build a pontoon bridge, it is very necessary, even if the vehicle of the project department, build a pontoon bridge, can also reduce a lot of time.
Since today I just took a general look at the location, and then investigated whether there was a suitable place to build a station around, I didn't stay long in the Majiahe Connecting Beam, and then sailed to the next place. (To be continued.) )