Chapter 90 The roadbed construction team enters the site

Early in the morning, Shucheng printed the construction plan, work instructions and technical disclosure of Shangyunzhuang, and prepared to explain to the new roadbed construction team and the person in charge of the site. "Words, feelings, first, http://www.Klxsw.com

www.Klxsw.com one? Read the book ww?w?・1?kshuc

Because the subgrade filling project of Shangyunzhuang is in the Pingli section, Shucheng came directly to the construction site of Pingchangli, and saw that the roadbed construction team did not come for the time being, so he chatted with Lao Yan and others.

"Lao Yan, I have to thank you last time, otherwise I might have fallen here." The day after sending Shu Cheng to the hospital, Lao Yan also went home because of something at home, and he happened to come back today.

"Minister Shu, what's the matter, but to be honest, your life is really big, when we dug you out, the water level was already more than a meter high, and the black light was blind, so it was not easy to drag you out." Talking about the situation that night, Lao Yan also felt thrilled.

Before the rain, there was only one headlight around the foundation pit, which was installed by pouring the sliding bed board a few nights ago. It was pouring rain, and the light of the headlights was extremely dim, and the radiation distance was limited, so it was impossible to see the actual situation in the foundation pit.

That night, Lao Yan and the others also took great risks to fish out Shucheng. You must know that once the foundation pit collapses, everyone may be buried inside, and then it is really life and death.

Lao Yan said lightly about the process of what happened that night, but Shu Cheng knew very well that the foundation pit that night was full of mud, and it took a lot of effort to fish out Shu Cheng. Because of Lao Yan, they also relied on intuition to find Shucheng.

If it weren't for the eight pumps pumping water at full capacity and running at full power, even if there was a plastic film to protect the slope, it might have collapsed.

"I don't know what's going on, I wanted to join you, but suddenly I stepped on the air, and then I fainted, I can't remember anything, and when I woke up, I was lying on the hospital bed.? Take a look at the book??? w?ww?・1?k?a, s?h?uc," Shu Cheng shook his head.

After chatting for a while, the person in charge of the roadbed construction team came, the person's surname was Xu, he had been to the construction site a few days ago, and Zhang Xiaoyun had already been in contact with him.

"Xu Gong, this is our Minister Shu, who is responsible for technical things, if you have any technical problems in the future, you can find him." Zhang Xiaoyun introduced Shucheng Road to Boss Xu.

"Minister Shu, this is Boss Xu of the roadbed earthwork team." Zhang Xiaoyun introduced Shucheng Road again.

"Hello Minister Shu!"

"Hello Boss Xu!"

Boss Xu is tall and slightly fat, but he looks like he is only in his thirties, and he has a unique shaved hair, so he doesn't look like a good person.

"Minister Shu, I want you to pay more attention in the future." Boss Xu said with a smile.

"It should be that we learn from each other and do a good job." Shucheng Road.

Next, Shucheng handed over the construction plan, work instructions and technical disclosure of the roadbed construction to Zhang Xiaoyun and Boss Xu respectively, and did not explain some key contents.

For example, in the process of filling, you need to dig steps, how much to fill each layer at most, etc., anyway, there are some precautions.

"Minister Shu, I think we should go to the site first to see what needs to be cleaned before the site is filled." After Shucheng finished giving the truth, Zhang Xiaoyun said. Looking at a book? w?w?w?・1?kshuc

Now that the construction team has arrived, it is necessary to be familiar with the site first, and it is also necessary to make on-site disclosure of some things on the site.

"Well, it's better to just now, does Boss Xu have time?" Shu Cheng asked.

"No problem at all." Boss Xu said.

Subsequently, the three of them came to both sides of the line, and Zhang Xiaoyun also specially arranged a guard to protect the crossing.

"Boss Xu, before filling in, the work of clearing the table must be done, but before clearing the table, you have to arrange for these two piles of garbage to be transported." Zhang Xiaoyun came to the north side of the crossing and pointed to the northwest side of the crossing, at the foot of the roadbed.

This pile of domestic garbage, apparently piled up by the villagers of Shangyunzhuang, is relatively old, and it is necessary to transport garbage before filling the roadbed.

"There is also a pile of garbage on the south side of the crossing, which must also be transported, you have to communicate well with the village, and the garbage is well arranged, and it is not easy to dump it there." Zhang Xiaoyun reminded.

"Don't worry, Team Zhang, you don't need to renew this matter." Boss Xu packed the ticket and said.

Indeed, in Boss Xu's territory, and he has a good relationship with Secretary Shangyunzhuang, there is no big problem in dealing with one or two thousand square meters of garbage.

Subsequently, the three of them settled down some trees, which needed to be cut down by Boss Xu, and these trees were all places that affected the filling of the roadbed.

"XCMG, or start cleaning up the garbage tomorrow, the line will clean up the surface, and you will arrange for four people to dig a trench this afternoon to find out the location of the teleport." Zhang Xiaoyun arranged for Boss Xu.

"That's no problem, you can arrange manpower at any time." Boss Xu said.

Arrange four people to dig a trench, for Boss Xu, it is easy to find it directly in the village, as long as you bring tools such as sheep picks, you can do the construction.

The so-called exploration trench is a horizontal or longitudinal trench, and the reason for digging the trench is to find out the direction and position of the cable.

In the existing line reconstruction project, many cables are buried under the old line, and these cables have various railway departments such as public works section, electrical service section, train service section, locomotive maintenance section, etc., and these cables are still in use in the process of existing line transformation.

Therefore, before the construction of the adjacent line position, the trench must be excavated to find out the direction and location of the cable, and if necessary, the cable must be dug out, set up obvious signs, and be protected to avoid damage during the construction process.

Because once the cable is destroyed, it is likely to affect the traffic, just like Haocun Station to dig up the cable, fortunately, it is a spare cable, there is no accident, in case the cable in use is dug up, causing a parking accident, that is to be responsible.

No matter how well you do your job, if you dig up a cable, it is very likely that you will be vetoed all.

Now if you want to dig garbage at the foot of the roadbed slope and transport it, without digging a trench, even if Wei Jian manages it here, he doesn't dare to act rashly, let alone Zhang Xiaoyun.

For Shucheng, the preliminary work of subgrade filling is to release the subgrade slope line, and then spill the slope line with white ash, and the construction team will clean up the slope line according to Shucheng's sprinkling of the slope line, the slope line and the sundries, domestic garbage, turf, etc. near the roadbed.

Only after cleaning these things, according to the bearing capacity of the original ground on the site, consider whether to dig down, or carry out replacement construction.

For special areas such as silt ponds, the project department should also take special plans, such as throwing flake stones, to enhance the bearing capacity of the foundation.

For the original ground of Shangyunzhuang Station, except for some organic soil, the soil quality below is good, and Shucheng is not worried about the bearing capacity of the original ground.

At work in the afternoon, Boss Xu arranged for four people to come to the construction site, and under Zhang Xiaoyun's arrangement, they excavated several special places.

In the case that there is no cable mark on the site, it is generally used to dig two longitudinal roads and three lengths, and dig one transversely for each more than ten meters to twenty meters.

Of course, you can also arrange it according to each route. For the cable marking, it is necessary to follow the direction of the cable marking, and according to this direction, find out whether the direction of the cable is consistent with the marked, the specific burial depth, etc., and protect it.

The next day, Boss Xu specially arranged a man surnamed Li to be in charge of the construction site, after all, Boss Xu himself could not stay at the site every day.

At the same time, there was also a small excavator and two transport vehicles, both of which were of the thirteen or fourteen square kind, which were specially used to transport garbage.

Boss Xu is not a loss to Shangyunzhuang, yesterday I went back and said to the secretary of Shangyunzhuang, the garbage has a place, less than two hundred meters away from the scene, there is a big hole, originally to be filled, just to bury these garbage first.

Because Shangyunzhuang is carrying out rectification, the road surface and garbage in the village have to be disposed of, and concrete has been poured, and the roadbed construction of Shangyunzhuang Railway Station is just in time.

In less than half an hour after the construction, Wei Jian's Volkswagen car drove into the construction site, followed by Wei Jian, and Xu Min, at this time Shu Cheng remembered that today seemed to be the first day of Shangyunzhuang's unloading.