Chapter 355: Money Everywhere!

When Shang Xuejing heard Huang Pi's report, she was indeed a little angry in her heart!

In her opinion, before Shanghang got married, it didn't matter if he hooked up with Shucheng clearly, after all, he was not married. Pen, fun, and www.biquge.info

But after getting married, she actually had to be transferred to Shucheng to be the finance minister, which had to make people doubt her thoughts.

How to say that Shanghang is also his niece, and on some issues, he should be reminded and not let the other party make mistakes.

"Mr. Huang, you wait for this, I'll contact Hanghang, don't give her an order yet!" Shang Xuejing said.

"Okay, I'll wait for the news from Mr. Shang!" Huang Pi Road.

At this time, Huang Pi was glad in his heart, fortunately he asked Shang Xuejing, otherwise he would casually transfer Shanghang over, I really don't know what Shang Xuejing would find him.

Less than a quarter of an hour after Huang Pi hung up the phone, Shang Xuejing called him.

"Mr. Shang, hello!" Huang Pi answered.

"Hanghang's order, you give it, let her go to the barren project department." Shang Xuejing said.

Huang Pi was stunned for a moment, but he didn't expect that in just a quarter of an hour, Shang Xuejing's attitude had changed so much, and he hurriedly said: "Okay, Mr. Shang is fast!" ”

As for what happened during the period, it is not up to Huang Pi to manage.

Barren one, morning meeting, after each department reported the situation, Shu Cheng began to speak.

"I said a few things, the first thing, it has been five days now, the site is only 70 pile foundations, a total of eight rotary drilling drills, although the next few days only arrived, but on average, a day to pour two more pile foundations, this speed, too slow!" Shucheng Road.

According to this, one rotary drilling drill has two a day, and eight drills are only sixteen a day, how long will it take to finish more than 1,200 pile foundations?

"Although there are various reasons on the spot, but this is not a reason, today is Sunday, starting from tomorrow, the project department will implement reward and punishment measures, every week, the project department will take out part of the money to do bonuses, specific reward and punishment measures, after the meeting I arranged, will be distributed to the group, everyone download and view by themselves." Shu Cheng continued.

The reason why Shucheng set the reward and punishment measures in one week instead of one month is mainly because the total number of cadres is only two months, and one month is too long.

And a week, such a broken cycle, gives people stimulation, and now when you are doing a lot of work, you don't pay bonuses, when do you have to wait?

For Shu Cheng's words, everyone didn't pay much attention to it, after all, the leaders said one thing and did another, and the employees were used to it, especially Huang Ke said this before, but he didn't do it later, resulting in a lot of bonuses not paying attention.

"Three deputy managers, three work points, each work point is counted separately, and the minimum standard for each rotary drilling drill is at least three pile foundations per day!" Shucheng Road.

Since Shu Cheng is a leader, he must have the model of a leader, do things regardless of the process, only look at the results, as for how you do the process in the middle, Shu Cheng doesn't care.

There is suffering on the scene, and your deputy manager will deploy it, but if you can't deploy it, Shu Cheng or the secretary will go out to Zhan Yuntian.

"The second thing, after the meeting, the technical department arranged people, go to the 88 to 89 piers to measure, I see that the place is just a two-way three-lane highway, because there is no continuous beam in that place, you measure, see where the pier is located, and then draw a plane diagram of the road and the pier, give me a copy." After Shu Cheng finished speaking, he continued: "There are also piers 110 to 111, and there are no continuous beams there. ”

Generally speaking, on the railway, the mountains are opened, and bridges are built across the river, but with the rise of high-speed rail, more and more places are replacing roads with bridges, and there are more and more railway bridges.

When bridges span highways and highways, continuous beams are generally set up in the design.

What is a continuous beam?

In construction, bridge, aviation, pipeline line and other projects, it is common to encounter a type of beam with three or more supports, called a continuous beam.

To put it bluntly, this kind of beam is poured at one time, there are three supports below, and the upper beams are connected together, unlike ordinary beams, which are erected piece by piece.

Because the beams on the railway, in general, are 32 meters and 24 meters, these are also called standard beams.

Once it exceeds 32 meters, continuous beams are generally used, such as 32m+48m+32m continuous beams, which are three spans of 32 meters, 48 meters, and 32 meters respectively.

The 48-meter span is called the main span, and the two 32-meter spans on the side are called the side span.

The main span is generally the location of the highway crossing.

The length of the main span is related to the width of the highway or highway, the wider the highway, the longer the main span must be, so as not to affect the highway and cross the highway from the past.

For example, a two-way four-lane highway is likely to use 88m+100m+88m continuous beams, and a main span of 100 meters to cross a two-way four-lane highway.

Less than this length, it is very likely that it will not be able to cross, so the choice of continuous beam also needs to be considered from all aspects!

Nowadays, near piers 88 to 89, there is a two-way three-lane road, but in the design given by the design institute, there is no continuous beam, that is, an ordinary 32-meter T beam is used.

The so-called T-beam is a T-shaped beam body, before the rise of high-speed rail, most of the railways are using T-beams, and rarely use box girders.

The box girder, hence the name, is a box-shaped beam body.

Relatively speaking, the cost of the box girder is much higher than the cost of the T beam, so there is no special circumstance, when the design institute designs the railway, it uses the T beam, not the box girder.

This is designed from a budget perspective!

Around 88 to 89, since there are no continuous beams and there are two-way three-lane roads, Shucheng has to consider whether there is any impact on this road when building the bridge piers.

These things must be considered in advance, otherwise when it is time to work, and suddenly say that a bridge pier is in the middle of the road, isn't this a big deal?

There are also roads 110 and 111, and where piers 88 to 89 are the same, the only difference in this place is that this road is narrower, only two lanes in both directions, relatively speaking, it is better to cross than piers 88 to 89.

If the piers really have an impact on the highway, or between the highways, the communication design institute should communicate with the design institute to see whether to change to continuous beams or use non-standard beams!

The so-called non-standard beam is a non-standard beam, that is, a beam body other than the standard beam with a length of 32 meters, 24 meters, 20 meters, 16 meters, etc

Shu Cheng proposed this matter, in fact, he also has his thoughts, if it affects the highway and can win the change, then it is the best, because changing a project is basically making money, Shu Cheng is worried about how to make money, and now there is this opportunity!

"Okay." Xu Jin recorded in his notebook.

"The third thing, when I went to the site yesterday, I found that after some of the pile foundation was excavated, the height of the pile head was too high, and I asked people to measure it, and the pile head was four meters long!" Shu Cheng continued.

In the process of pouring the pile foundation, the pile head of 50 cm to 1 meter must be retained.

This is in the pile foundation construction specification, and the later specification was directly changed to one meter, which is to ensure that the pile head is enough to prevent the pile head from being replenished after excavation.

Ensuring the length of the pile head is to ensure the quality of the pile foundation!

However, a pile head of about one meter is completely allowed, even if you expand the range a little, to about one meter and a half, you can say the past.

But with a four-meter pile head, this is a bit too much to say.

This meter diameter of the pile foundation, the design concrete square amount of 0.785 square meters, remove one meter of pile head, the other three meters is 2.355, plus the concrete loss coefficient, three meters of 2.5 square concrete or more.

The concrete strength of the pile foundation is C40, and if each side is calculated according to 360, the 2.5 square concrete is 900 yuan!

One is a waste of 900 yuan, ten is 9,000, and 1,000 is 900,000!

This is not a small amount, doing engineering, especially large projects, a lot of losses are very small, but they can be accumulated, and the losses are quite large!

You said to take 900,000 yuan to pay bonuses, and at least 5,000 per month!

And controlling costs is also something that Shucheng must manage, otherwise it will be super powerful at that time, and Shucheng will not be able to explain it to the superior leaders.

"For this phenomenon, the pile foundation poured backwards is absolutely not allowed to happen, and if it happens again, I will punish it." Shu Cheng said solemnly: "Besides, after doing so many pile foundations, isn't it even clear about the reaming coefficient?" So what do you need a field technician to do? Xu Jin, you record it, every moment of the pile foundation, the real-name system of on-site personnel, and at the same time tomorrow in the pile foundation account, you must report the height of the pile head to the project department, and make a record, if the excavation does not match the site, the corresponding responsible person must be punished. ”

"Okay." Xu Jindao.

In fact, these things should be done by Wei Qi and Xu Jin, but they don't seem to have put their minds on this, especially Wei Qi, after this period of contact, they found that he was also a black man about technical things, and he didn't know at all, so Shu Cheng didn't count on him.

"The cost management of the project department is not something that I can do alone, we must work together to control the on-site construction, so as to reduce the cost to the minimum, otherwise there is a waste here, a little waste there, and the accumulation is definitely a huge number, and then the project that makes money will lose money if it continues to work." Shu Cheng continued.

After arranging this matter, Shu Cheng said again: "One last thing, Manager Wu, did the garbage cleared on the spot yesterday, the slag drilled out of the rotary drilling drill and the excavated earthwork start to be transported?" Shu Cheng asked.

This matter was also arranged for Wu Batian by Shu Cheng on the construction site yesterday.

"Not yet, I was just going to report this to you." Wu Batiandao.

"Well, then tell me after the meeting, what's going on?" Shucheng Road.

"Okay."

"Adjournment!" (To be continued.) )