Chapter 352 Rules
The next day, Shucheng was driving, and Li Yifeng sat in the co-pilot, holding his forehead with one hand and a sad face
"Mr. Li, are you okay?" Shu Cheng asked with concern. Pen, fun, pavilion www. biquge。 info
"It's okay, the sequelae of playing mahjong, I have a headache after playing mahjong." Li Yifeng shook his head and said.
When Li Yifeng said this, Shu Cheng couldn't help but want to laugh, what is the sequelae of playing mahjong, it is a headache to send money!
"This group of guys in the Road Bureau is not easy to deal with, you knew each other yesterday, and it will be helpful for you to have more contact in the future." Li Yifeng reminded.
"Well, okay, Mr. Li." Shu Cheng nodded.
However, thinking that the road bureau has such a big appetite, Shu Cheng is worried again, Li Yifeng lost at least one million last night.
Because he later brought 700,000 yuan, he lost it all, not to mention that there were one or two million cash on the side of Zhao Tianying in the front road bureau, and most of this money must have belonged to Li Yifeng and Du Ming.
At this moment, Li Yifeng answered another phone call, and Shu Cheng listened to Li Yifeng's tone of voice, which should have been a call from Ji Xiangshun.
Li Yifeng said politely for a while, and finally hung up the phone, but looking at Li Yifeng's smiling face, it should be a good thing.
"Is there a good thing, Mr. Li?" Shu Cheng couldn't help but ask.
"I lost more than 2.3 million last night, and today Commander Ji promised to allocate another 50 million funds at the end of the month to help us do a lot of bidding, and this money was not spent in vain!" Li Yifeng said with a smile.
2.3 million yuan, in exchange for 50 million project money, Shu Cheng didn't know what to say, originally these money had to be given, but now it has to be allocated in this way, which makes Shu Cheng feel very helpless.
However, more than two million is indeed not much, and the construction headquarters can use the change to recover this money, and the construction index will definitely approve it under the leadership of Ji Xiangshun.
In this way, Li Yifeng did not lose a cent of the project money on his side, and the extra 2 million yuan on the construction side was also within the budget range, and the final loss was the country!
The so-called wool comes from the sheep, in fact, this is not wrong at all!
In the end, it was Ji Xiangshun and others who really benefited, and after a trip to this money, they took millions more!
Of course, the construction headquarters also has a small number of interests, that is, when making changes, it is definitely impossible to get stuck in the line of 2.3 million, which is more than this price, that is for sure.
In this way, the construction headquarters also made money!
In fact, if you think about it, this technique is the same routine as the construction team of the project department to honor the leaders of the project department.
The construction team gives money to the leaders of the project department, and the leaders of the project department give this part of the money to the construction team through legal means such as contracts.
After such a turnover, the leaders of the construction team and the project department did not lose, and the last loss was the company!
In engineering units, the methods are the same, depending on how you use them.
"Do it a few more times, and we won't be short of money when we do it." Shu Cheng said with a smile.
Last time, I wanted 100 million by drinking, but this time I spent more than 2 million and made 50 million, and I will come a few times in the future, and the money is not a dream at all!
"How can it be so simple, there are a lot of ways in it, you have to learn more in the future, the construction headquarters is a role that connects the previous and the next, and solves various difficulties for the following project department, and you will also encounter it when you are the commander of the construction headquarters in the future." Li Yifeng said.
"Well, you have to learn more from Mr. Li!" Shu Cheng said modestly.
"How's it going?" Li Yifeng asked.
"All aspects are going well, but there are some minor troubles in the land acquisition." Shucheng Road.
"That's good, you can raise the construction period over there, otherwise by the time the four project departments will have the slowest construction period, and I won't be able to favor you too much." Li Yifeng said.
Li Yifeng's words are obvious, although I have a good relationship with you, but the output value of one of the four project departments can't come out, and when the time comes, Li Yifeng can't favor Shucheng.
So although Shucheng has Li Yifeng as a backer, the work can't be too bad, otherwise Li Yifeng won't be able to maintain him.
"I know Mr. Li!" Shucheng Road.
Twenty minutes later, Li Yifeng got off the bus from the bureau, and Shu Cheng drove to the project department.
Just halfway through, Wu Batian called himself and said that someone was obstructing the work, and he wanted to see the project manager by name, and no one else was bird.
Suddenly, Shu Cheng couldn't help but wonder, who was so awesome, and he was so diao.
When Shu Cheng arrived at the scene, the pile foundation construction had stopped at this time, and the deputy manager Wu Batian was chatting with a middle-aged man, looking at the appearance of the middle-aged man, as if he was extremely arrogant and pointing fingers, Wu Batian still looked polite.
Seeing Shu Cheng get out of the car, Wu Batian said a word to the middle-aged man, and then walked over to Shu Cheng.
"Manager Shu, right?" The middle-aged man stepped forward and said in an arrogant tone.
"Manager Shu, this is Secretary Ma Boma of Majia Village." Wu Batian introduced.
"Hello Secretary Ma!" Shu Cheng looked calm and stretched out his hand.
"Hello Manager Shu." Ma Bodao: "Manager Shu, when Manager Huang left before, did you tell you that we have to give 30,000 yuan a month for our cement road?" ”
Mabo said, pointing to the path he had spoken.
The cement road is the most convenient road to enter the site, and it can also be connected to concrete tankers, which is very convenient.
But this road has a drawback, that is, it passes through Majia Village, and it can even be said that this road was built for Majia Village.
This cement road, at the beginning, was built by the township government, and after it was damaged, the villagers contributed part of the money, plus the township government contributed part, and the cement road was renovated again.
Therefore, in the eyes of the villagers, the road was built by the villagers themselves.
Nowadays, the construction of the railway has taken the path of others, either giving money or destroying it and rebuilding it.
When Huang Ke was there, he had talked to Ma Bo about this, and Ma Bo meant to renovate it after the destruction, but Ma Bo, the village secretary, disagreed.
Once destroyed, it had to be rebuilt, and the width of the building was changed from four meters to seven meters, and the thickness was increased from 12 centimeters to 25 centimeters.
That's a lot of money! The road from Majia Village to the construction site is more than two kilometers, and if it is built according to this standard, it is better to give how much money to use temporarily.
After all, there are only 30 piers on the construction site to work through this road, and it can be completed in three months at most.
In this way, as long as 90,000 yuan can be done, and to build a cement road, without 200,000 yuan, it will definitely not be able to get down.
As for turning to other roads, one is that the road is too far, the detour is too long, and it will also involve the roads of other villages, which is another trouble.
As for the construction of the sidewalk, there is a river at piers 30 to 31, which directly cuts off the sidewalk.
The cost of building a temporary bridge there is hundreds of thousands, so no matter which way, it is not convenient to directly cross the cement road in Majia Village.
Besides, in Ma Bo's view, it is better to get 30,000 yuan a month, and as for the broken road, you can apply to the government for funding to build it when the time comes.
"Secretary Ma, I really haven't heard of this, when Manager Huang Ke left, I hadn't come yet, and many things hadn't been handed over." Shucheng Road.
"In this way, I said why are you so ignorant of the rules, before this, Huang Ke has already owed my village three months of travel fees, including this month, a total of 120,000!" Ma Bodao.
In the past three months, the project department has not carried out construction, mainly because the funds are not in place and the construction cannot be carried out, so the monthly road expenses in Majia Village have not been paid.
Ma Bo saw that there was no one to build, and it was not easy to ask for it, but these days he saw the construction of the project department again, so he came directly to the door.
Ma Bo doesn't care if your project department is under construction or not, as long as you don't withdraw from the site, he will collect money, who told you to take his village road?
"Secretary Ma, what are we talking about here?" Shucheng Road.
Shu Cheng also understood Ma Bo's request, but after all, this was discussed with Ma Bo when Huang Ke was there.
Now that Huang Ke is gone, he will come again, and Shucheng has his own way.
Seeing this, Wu Batian turned around and left, going to do other things, Ma Bo was stunned, and then followed Shu Cheng over.
"Secretary Ma, you also know that in the first three months, our construction site has not started, and our project department has hardly taken the road in your village." Shucheng to Ma Bo Road.
"Manager Shu, what do you mean by this? Could it be that you still want to cheat, your engineering truck didn't go, and the other cars didn't go? When Ma Bo heard this, he immediately became anxious.
Ma Bo's meaning is obvious, whether you work or not, this money must be given!
"Secretary Ma, don't worry, I haven't finished yet!" Shu Cheng smiled.
Marbo snorted and didn't continue to speak.
"Secretary Ma, I didn't say I wouldn't give that money, it's just another way, you see that I have to use so many construction machinery on the site, or you can get a few machines and come to my site to work, what do you think?" Shucheng to Ma Bo Road.
Now is still in the construction of pile foundation, excavator with less, in the future with the construction of cushion cap, pier body, stepping stone, excavator, forklift and crane, must use a lot.
It is impossible for the construction team to bring these machinery and equipment by themselves, and it is one thing to let you use the construction machinery you bring.
Second, to consign their own machinery, the freight is also a lot, and the general construction team is to lease construction machinery locally.
Since the construction team wants to lease these machines, why not let them lease them through Mabo?
If Ma Bo has his own construction machinery, it would be best to give him the money directly when the time comes.
If not, Ma Bo introduced some construction machinery to work on the construction site, and at the same time he took some commissions himself.
In this way, a lot of money on Shucheng's side can be handled through the cost of construction machinery, which can be regarded as a formal channel.
After all, it is impossible for the project department to directly pay Ma Bo, and make accounts for travel expenses, and when the time comes, the audit will come, and Shucheng will not be killed.
These funds have to be processed through other channels, and the cost of construction machinery is one of the ways. (To be continued.) )