Chapter 783 - Ensuring that migrant workers' wages are not in arrears

Zhao Erzhu smiled: "Ruan Tou'er, that's also your good heart, I heard that of the 200 contractors who were tested at the beginning, only 50 were qualified in the end!" ”

This is what Ruan Tou'er is most proud of, but he still said modestly: "Alas, there are 49 other people here!" Are you off tomorrow? ”

Zhao Erzhu smiled honestly: "Yes, I've been working for two weeks in a row, I'm a little tired, I want to relax and relax, go out and go around, I've been here for so long, I haven't been to the market yet!" ”

Ruan Tou'er understood: "It's to relax and relax." Pen? Interesting? Pavilion wWw. biquge。 infoThe view here is still good, and there are places to play, so you can be happy, well, do it the day after tomorrow? ”

"Do, of course!" Zhao Erzhu squinted his eyes and smiled with satisfaction: "Anyway, I'm used to staying here, and the speed is faster, everyone gets along very well, and I'm too lazy to change places." If you have been here for a long time, you can add one percent of the points for your work, and when you go back and buy affordable housing, you can reduce one percent of the housing payment, and you will have the opportunity to settle down here for free, of course I do! ”

Ruan Tou'er waved his hand with satisfaction: "That's good, remember, the last battery car tomorrow night is 11:30." ”

"Yes!"

When several medium-sized real estate developers borrowed money from Lingmiao Ecology to build affordable housing in selected areas in Sixiang to meet the accommodation needs of the influx of migrants after the take-off of Sixiang in the future, Lingmiao Ecology Group and these real estate developers proposed conditions to several construction companies in the city and county that were interested in undertaking the project.

First of all, the developer is required to allocate at least one-quarter of the project cost before the project commences. The investment department of Lingmiao Ecological Group will have a special person to keep an eye on it to prevent anyone from defaulting or even absconding with money.

Then, the contractor is allowed to subcontract to a small engineering team, but must not cut corners, Lingmiao Ecology will also send knowledgeable people to check the quality of the project from time to time, once such a breach of contract is found, directly cancel the contractor's qualification, and cooperate with the bank to freeze its company account and private account, and impose a fine of double the penalty.

Thirdly, the contractor should use the Lingmiao construction software specially developed by Lingmiao Ecology to pay the corresponding wages of the contractor in full every day, and then the contractor will distribute it to the bank card of the front-line workers.

Each contractor must confirm the number of people under his command when taking over the project, and enter the bank card into the system to ensure that the daily salary can be paid to the accounts of these front-line workers. However, if one person does not settle the payment, the contractor will not be able to apply for the subsequent appropriation the next day.

If a worker leaves, they need to unlock it from the software with their own password, and the bank card will be cleared, which can ensure to a certain extent that the contractor will not be paid.

Of course, because the project money is directly sent to these front-line workers, the contractor will have a specified commission, according to the number of people under them, the more people, the higher the commission.

In this way, because of a good conscience, the contractor who settles the payment quickly will have more and more workers and get more and more commissions at the same time.

However, only the Lingmiao Ecological Group, which is headed by Wang Han, has the ability to implement it strongly, and if it is replaced by any other real estate developer, I am afraid that it will not dare to do so, after all, the requirements for capital flow are too high.

And these laborers who are recruited from other places, every time they do a project, there is a familiar and familiar process, which will have a point evaluation of hard work. When the score exceeds a certain amount, it will be automatically added, and if the bonus ratio exceeds 10%, they can go to the local civil affairs department to apply for settlement before the affordable housing they have worked on is opened.

The higher the points, the lower the settlement fee, and when the points reach a certain standard, you can settle in for free.

This kind of credit can also reduce their purchase of any set of affordable housing in Sixiang with the logo of the project under construction of the Lingmiao Ecological Group, and can also reduce the rent of their local low-rent housing.

Only after the contractor has been verified and paid in full can the contractor apply to the property developer for a quarter of the construction payment each time after three or six months of ground commencement and after the topping out.

As long as the wages are sufficient and the materials are sufficient, these affordable housing, which is financed and supervised by the Lingmiao Ecological Group, will naturally be built quickly and well.

And because the wages are sufficient, these recruited workers, in order to relieve the fatigue of the day's work, sometimes go to the restaurants and leisure places around the construction site to relax.

At this time, the first to benefit is the local transport. Each township has issued legal electric vehicle licences to local villagers, allowing them to wait at these construction sites at night and provide transportation services to and from the township market at a price limit of 2 yuan per person.

Then there is the battery car invested by the contractor itself, which also comes every morning and evening to take the workers out for a stroll, 0.5 yuan per person.

This is only the construction site of affordable housing, in addition, Sixiang also has a cinema, hospital, nursery school, etc., which are invested and built by Lingmiao Ecology itself, which require a large number of workers, all of which are the same way of operation, attracting labor workers at the same time, but also prospering the economy of the township.

After coming here, some flexible workers have saved enough wages to boldly rent the street shops that were originally built at great cost in the countryside, and start to do restaurants, hair salons, clothing, bookstores and other businesses, of course, the hair salons here are strictly monitored, and resolutely put an end to the business of some ********* and other shops, and after making money, they are familiar with the prosperous and colorful life here, so they can call the elderly, children, and wives at home to work together and reunite with the family.

As for the family's one-third of an acre of land, it can be rented to other villagers, anyway, if their household registration has not been moved, no one can take it away.

When they are fully developed and can settle down for free or spend money, their families are still very poor, and they don't want to go back, so they simply move here.

……

Yu Changchun ran back and forth between the maternal and infant health care area and Binhai Yu's house during this time, and he naturally saw these changes in the township.

Different from the construction of other urbanized villages, Lingmiao Ecological Group has been strictly supervising the environmental protection facilities of each construction site, all the wastewater on the construction site is collected through the planned sewer pipes to the preset sewage treatment sites in each township, and the building materials waste is also transported to the garbage disposal site.

All affordable housing has piped gas lines, while the iron roofs where workers live are equipped with solar water heating equipment, and the houses are equipped with air-conditioning fans with ice boxes to minimize the use of air conditioning.

At the same time, we will increase the number of free mobile sanitation vehicles, strictly control the open defecation of migrant workers, and do not impose fines, but will force them to work on specific construction sites for a certain number of hours free of charge, so as to ensure that they will not repeat the offence next time, and if they do it again, the free working hours will be doubled.

The excrement accumulated by these free mobile sanitation trucks will be cleaned up by sanitation workers at regular intervals, collected in a centralized biogas digester treatment center designated by the township for organic fermentation, and then sold to several large farmland cooperatives at a price much lower than that of chemical fertilizer, so as to apply biofertilizer to the rice and vegetable fields that are uniformly managed and planted.