Chapter 59 New Water Conservancy

The name of the reservoir is called the mouth of the dragon cave, and the difference there is that before the reservoir was built, there was a large deep pool with a very large area, so there is a legend in the mountain that this is the place where the dragon bathes.

Later, the government built a reservoir there to meet the water demand in the mountain, but for some reason, the subsequent development of the reservoir did not keep up, so until now, it is only a reservoir and has not brought any benefits to the villagers.

Liu Yunqing came up with the idea of taking water from the waterway.

The villagers walk for half an hour into the mountains to fetch water in a waterway that comes from a reservoir.

Due to the accumulation of water over the years, there is too much water in the reservoir, and it flows out of the cracks of other mountains, forming multiple waterways, and the nearest waterway is half an hour away from Lishu Village.

In fact, Li Yang also thought of a possibility, that is, to send water from the town, but this cost is also a lot, not a small number, Li Yang does not want to do this for the time being.

Li Yang was very moved by the waterway proposed by Liu Yunqing, but Liu Gang told him that the waterway does not always have water, and when there is no water, the villagers look at where there is water.

"There is another possibility, if you are not afraid of trouble, you can do this," Liu Gang said suddenly.

"Uncle Liu, do you think there is anything more troublesome than diverting water from the reservoir?" Li Yang said with a wry smile.

"Yes, the way I said is to divert water and store water," Liu Gang said with a smile, and then explained.

"It's not that there is no water in the mountain, but there is no way to gather it, and the Phoenix Mountain itself has a lot of rain, but because of the topography, it is difficult to fight the water, so it is lost, if you can build a canal and then save the water, it is enough," Liu Gang said.

When Li Yang heard this, he suddenly realized, yes, isn't this time the rainy season, and when it snows after a while, this is the source of water, and he only needs to prepare some more reservoirs to gather these waters.

"This method is good", Li Yang clapped his hands and smiled.

"But you still need to go into the mountains to investigate, how to repair the canal, where to repair it is a problem," the uncle reminded.

From the back of the mountain where Ishishu Village is located, there are too many mountains to count, and this season, there are almost all clear streams like springs at the bottom of each mountain.

In fact, Li Yang himself ignored that there is a ditch next to their house, and whenever there is enough rain in the rainy season, there is clear water flowing in the ditch.

Grandma will also block the water, Li Yang used to carry a bucket to the ditch every evening to get water, two or three buckets a day.

Then behind the supplies, there is also a water tank, which is also used to store water, but because it does not flow and is too dirty, this water is generally not used.

The transplantation of the sweetgum tree continued, at least for ten days and half a month, but fortunately there was no farm work during this time, and half of the land in the village was gone, so there was basically a lot less to do.

Liu Yunqing and the second uncle watched the transplantation of the villagers, while Li Yang, under the leadership of Liu Gang and the eldest uncle, went to the back of the mountains and began to observe.

I don't know if I don't see it, I'm really shocked when I see it,

Between the mountains, streams of water are really everywhere, and finally they gather and flow down the mountain, but they don't flow through Lishu Village.

Li Yang immediately decided to build a canal to stop the water.

This is also a stopgap measure, because in the summer there is little rain and the water consumption is at its highest, which is expected to be a problem.

But that's a later thing, let's be satisfied with this time first.

The construction team, which had just finished building the convenient road, came to the mountain again and began to build the canal.

Li Yang didn't know much about how to formulate the route and how to repair it, so he specially came to the county water conservancy bureau and spent 5,000 yuan to invite a water conservancy expert to give him guidance.

Fortunately, this expert is quite reliable, and the efficiency of doing things with money is still good.

In two days, the route was demarcated to ensure that the maximum amount of water could be accumulated, and the width and height of the canal were also required from the average annual rainfall of Phoenix Mountain.

In this way, on December 26, another major project in Lishu Village began construction.

No one knows how much money Li Yang spent on these things, although everyone was surprised by Li Yang's financial resources, but everyone was relieved to see the trucks that came in and out every day to transport vegetables.

In fact, Li Yang himself must have calculated.

The length of the canal has been given by the engineering team, a total of one kilometer, which is actually not long, two meters wide, one meter five high, capped, the cost of 100 meters 20,000, one kilometer is 200,000.

The most important thing is not the canal, but the cistern.

Because it is impossible to build a canal from the back mountain to Lishu Village, the only way to build a reservoir on the spot is to lead it to Lishu Village through a pipeline.

Li Yang decided to build three large reservoirs, eight meters high, four meters underground, four meters above ground, and four meters in length and width, with a cost of about 30,000 yuan for one and 90,000 yuan for three.

If you add the water pipes and boosters, it should be about 350,000.

Li Yang calculated, entering December, he had several large expenditures alone.

One is 60,000 saplings, nearly 150,000 for the convenience of the people, 50,000 for all kinds of buried pipes, and 350,000 here immediately, all of which add up to about 600,000.

But it's nothing compared to his income.

Before December, Li Yang's total income was about 900,000 yuan, and in December, Li Yang's daily income was 100,000 to 120,000 yuan, and so far, Li Yang's total income was 3.8 million yuan, and the actual income he had received was 2.8 million yuan.

So Li Yang is not afraid of spending money, his money comes quickly, and he is not distressed about this expenditure.

The construction of the engineering team continues, the transplantation of the sweetgum tree continues, Li Yang is mainly responsible for the situation on the construction team's side, as for the sweetgum tree, there is Liu Gang and they are staring.

As for the work of burying fertilizer, it only needs to be done before the cold comes this year.

Li Yang looked at the calendar, Xiao Han is on the 6th of next month, and Da Han is on the 20th, and the time is relatively sufficient.

On December 29, the construction team began construction at full speed, and the project is expected to take 12 days.

In order to be able to complete the project around the 10th, Li Yang paid for the villagers to start digging the reservoir, which is a cube with a length and width of four meters and a height of four meters, which can save some time.

The time soon came to January 1st, which is the new beginning of the year, New Year's Day.

On this day, Li Yang and all of them went down the mountain and came to their grandparents' house for the holiday.

At the same time, Li Yang also brought Lin Xue and Jiang Mengjie back.

As for Liu Yan, it is said that she followed Xu Wentao back to her hometown for the holidays.