Chapter 97 Water Supply System

Li Yang: Since the last time they went up the mountain, they haven't gone down for almost half a month, and they can't help it, they haven't been able to find the north recently.

When he finished eating, his cousin suddenly reminded Li Yang how the bidding matter started, and Li Yang remembered this and hurriedly called Wang Yun.

Wang Yun said that the bidding time is the last day of February, that is, the 28th, and if Li Yang and they want to come, they can participate in the bidding together.

Of course, Li Yang was not interested in this kind of thing, but said that everyone would talk about it after the bidding was successful.

My uncle didn't go out this time, if the project starts here and needs a lot of help, at this time, you must be at ease with your own people.

Seeing that there were so many family members helping him, my cousin's somewhat worried mood finally settled down.

After dinner, at nine o'clock, Li Yang and the others went up the mountain again, and the time was really unaffordable.

On the 18th, with the efforts of Liu Xiaoqing and the five of them, the first biogas digester was finally dug.

Li Yang, with the temporary workers he found from the village, began to carry cement down one by one.

For absolute safety, Li Yang thickened the thickness of the cement a lot, which requires a large amount of cement.

Two workers from Li's father began to be in charge of the biogas digester, Liu Xiaoqing and they continued to dig the other, and Li Yang and they were responsible for transporting cement.

After two days of doing this, the two digesters are finally halfway completed, and the rest is the topping out.

The capping of the digester is a very important matter, which is related to the management and maintenance of the digester in the future.

Li's father presided over the topping out, and it took a day for the two digesters.

Installing gas pipes and gas meters, including special machines, Li Yang invited personnel from special gas stations to install them.

However, because there is nothing in it, there is no gas available.

Tong Shan has been very busy lately, and he now finds that almost half of his income comes from Li Yang.

The stems of the bamboo grass have just been buried in the soil and need a lot of water to irrigate, so the installation of water pipes is imminent.

Tong Shan took a few workers and began to work from the fifteenth.

In the whole Longmen Mountain, the length of the water pipe that needs to be installed is not a small number, the cowshed needs to be installed a lot, and there are various sprinklers, and then the pasture area needs to be installed, and the rotary sprinklers are still made, and as for the grazing area, all the ground sprinklers are used.

The water supply system of Longmen Mountain, Li Yang's budget reached 260,000 yuan, which is no exaggeration, the number of sprinklers alone is more than 600, just to install the sprinklers, Tong Shan took four people to install it for four days before it was installed.

On the 19th, the water supply system of Longmen Mountain entered another important stage, with the construction of a reservoir.

Because the reservoir in the back mountain is too far away from Longmen Mountain, even if the booster is used, the water volume may not be guaranteed, so in the end, Li Yang decided to build three large reservoirs on the top of Longmen Mountain, the scale is the same as that of the back mountain, so that the water storage can be doubled.

According to Li Yang's plan for Longmen Mountain, there are 100 acres of pasture area, 300 acres of grazing area, and the remaining 200 acres of barren mountainous area, at least 200 beef cattle.

The daily water consumption of beef cattle alone can reach 50 tons, that is to say, the 8*4*4m scale reservoir cannot even last three days of water.

And this is just a small head, a hundred acres of pasture area, when raising seedlings, the daily consumption of water is calculated according to 100 tons, and the amount of a reservoir is consumed every day, so the water consumption of the farm is absolutely very terrifying.

If tap water is used, it is estimated that the expenditure on water alone is a large number.

Now there is no need to worry about the problem of water, because it is the rainy season in Phoenix Mountain, and it is often several days at a time, and the water is very abundant.

But when the time enters June, the amount of water is seriously reduced, even if there are six reservoirs, more than 700 tons of water storage, it is estimated that the entire cattle farm will be guaranteed a week's water, if it does not rain for a long time, that is the time to worry.

Father Li's side has no manpower to make the reservoir, there is no way, Li Yang can only ask the uncle to help, and it just so happens that they have not started construction now.

At present, there are only 12 people in the uncle's engineering team, most of whom are former co-workers, and everyone is willing to follow him when they hear that his family has a large-scale project and can find work.

Twelve people, three large cisterns, are expected to spend 120,000, accounting for almost half of the cost of the entire water system.

The construction cost is also greater than the first three reservoirs, because the top of Longmen Mountain is a hard stone under one meter and a half, which cannot be penetrated, and most of them are on it, so that in order to resist more than 100 tons of water pressure, the thickness of the pool wall and the hardness of the cement are higher, and the cost is naturally higher.

This time period is the busiest time for Li Yang, installing biogas, checking the seedling situation of Huangzhu grass, and then installing water pipes, reservoirs, and cowsheds in Tongshan.

Until the twenty-second, everything was basically done except for the barn.

The stems of the imperial bamboo grass have all been merged, and you only need to wait for the seedlings to be transplanted.

In a week's time, Tongshan's underwater system was finally completed.

However, the construction of the cowshed continues, the area of 2,000 square meters, not a few days can be completed, now with the addition of the uncle, the whole project progress is much faster, and the division of labor on both sides is carried out.

With the power line, you can use the mixer, and you don't have to pull the cement up from below, which saves a certain amount of time.

On the 25th, the three reservoirs in Longmen Mountain began to officially store water, and Li Yang also went to the back mountain to see the flow of the canal, which should be no problem at present.

And after a few days of life in Li Yang's house, the two wild boars also seem to have adapted, from the beginning of the strange, to now the mother will take the initiative to come forward as long as she goes to feed.

The mother had raised pigs before, and she said that the sow would be ready to give birth in a month at most.

At the same time that the water supply system was in full swing, the 300 acres of grazing area had already been ploughed shallow again, and Wang Dali and his team used a small plough machine to plow all of them in six days at a rate of 50 acres a day.

After ploughing, you can start to sow the grass seeds, and the seeds here are not imperial bamboo grass, the kind of short pile grass, which does not need to grow too tall and is scattered relatively densely.

When the seeds are sown, the sprinkler immediately begins to spray water to ensure that every place can be moistened by the spiritual water.

With three such large reservoirs, Li Yang couldn't run over to soak them every day.

When he was fine alone, he would make some high-concentration spiritual water, which was specially bottled in glass bottles, and then handed it to Wang Dali, and when the water in the reservoir was full, he would pour two bottles of this.